During the period of June and July 2012, we are running two feedback surveys:
Respond to the targeted consultation on proposed changes at some construction site, tunnel alignment or site boundaries:
Respond to the abstraction consultation, on how the proposed Thames Tunnel may have an effect on your ability to abstract water or operate your ground source heat pump:

