<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Thames Tunnel</title>
	<atom:link href="http://www.thamestunnelconsultation.co.uk/feed/" rel="self" type="application/rss+xml" />
	<link>http://www.thamestunnelconsultation.co.uk</link>
	<description>Creating a cleaner, healthier River Thames</description>
	<lastBuildDate>Thu, 17 May 2012 17:02:04 +0000</lastBuildDate>
	<language>en</language>
	<sy:updatePeriod>hourly</sy:updatePeriod>
	<sy:updateFrequency>1</sy:updateFrequency>
	<generator>http://wordpress.org/?v=3.2.1</generator>
		<item>
		<title>Extra round of consultation for new changes to plans at four proposed Thames Tunnel construction sites</title>
		<link>http://www.thamestunnelconsultation.co.uk/2012/05/17/extra-round-of-consultation-for-new-changes-to-plans-at-four-proposed-thames-tunnel-construction-sites/</link>
		<comments>http://www.thamestunnelconsultation.co.uk/2012/05/17/extra-round-of-consultation-for-new-changes-to-plans-at-four-proposed-thames-tunnel-construction-sites/#comments</comments>
		<pubDate>Thu, 17 May 2012 08:25:33 +0000</pubDate>
		<dc:creator>nhouse</dc:creator>
				<category><![CDATA[Uncategorized]]></category>

		<guid isPermaLink="false">http://www.thamestunnelconsultation.co.uk/?p=2389</guid>
		<description><![CDATA[Report on phase two public consultation reveals proposed amendments for ‘Supersewer’ construction plans at: Barns Elms, Putney Embankment, Victoria Embankment and Albert Embankment.    Thames Water explains reasons why 24 preferred sites for Thames Tunnel construction and operation remain unchanged.&#8230;]]></description>
		<wfw:commentRss>http://www.thamestunnelconsultation.co.uk/2012/05/17/extra-round-of-consultation-for-new-changes-to-plans-at-four-proposed-thames-tunnel-construction-sites/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Foreshore geology probes ahead of Thames Tunnel construction</title>
		<link>http://www.thamestunnelconsultation.co.uk/2012/04/20/foreshore-geology-probes-ahead-of-thames-tunnel-construction/</link>
		<comments>http://www.thamestunnelconsultation.co.uk/2012/04/20/foreshore-geology-probes-ahead-of-thames-tunnel-construction/#comments</comments>
		<pubDate>Fri, 20 Apr 2012 08:13:01 +0000</pubDate>
		<dc:creator>AvnishR</dc:creator>
				<category><![CDATA[Uncategorized]]></category>

		<guid isPermaLink="false">http://www.thamestunnelconsultation.co.uk/?p=2334</guid>
		<description><![CDATA[As part of our ongoing site investigations for the Thames Tunnel, we need to undertake some more boreholes on the river. The boreholes will be about 15m deep and will provide us with information about the geology near the foreshore.&#8230;]]></description>
		<wfw:commentRss>http://www.thamestunnelconsultation.co.uk/2012/04/20/foreshore-geology-probes-ahead-of-thames-tunnel-construction/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Thames Tunnel vital for London’s economy, says new report</title>
		<link>http://www.thamestunnelconsultation.co.uk/2012/03/20/thames-tunnel-vital-for-london%e2%80%99s-economy-says-new-report/</link>
		<comments>http://www.thamestunnelconsultation.co.uk/2012/03/20/thames-tunnel-vital-for-london%e2%80%99s-economy-says-new-report/#comments</comments>
		<pubDate>Tue, 20 Mar 2012 08:38:47 +0000</pubDate>
		<dc:creator>nhouse</dc:creator>
				<category><![CDATA[Uncategorized]]></category>

		<guid isPermaLink="false">http://www.thamestunnelconsultation.co.uk/?p=2291</guid>
		<description><![CDATA[A new report &#8216;Why does London need the Thames Tunnel?&#8217; has found the major new sewer will be a huge boost for the capital&#8217;s economy. The report, which is backed by business organisation ‘London First’ and the Trades Union Congress&#8230;]]></description>
		<wfw:commentRss>http://www.thamestunnelconsultation.co.uk/2012/03/20/thames-tunnel-vital-for-london%e2%80%99s-economy-says-new-report/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Chambers Wharf site investigations &#8211; important update</title>
		<link>http://www.thamestunnelconsultation.co.uk/2012/03/20/chambers-wharf-site-investigations-important-update/</link>
		<comments>http://www.thamestunnelconsultation.co.uk/2012/03/20/chambers-wharf-site-investigations-important-update/#comments</comments>
		<pubDate>Tue, 20 Mar 2012 08:15:38 +0000</pubDate>
		<dc:creator>nhouse</dc:creator>
				<category><![CDATA[Uncategorized]]></category>

		<guid isPermaLink="false">http://www.thamestunnelconsultation.co.uk/?p=2288</guid>
		<description><![CDATA[A small sample of asbestos-containing material has been found at Chambers Wharf following the start of site investigations, needed to test local soil and groundwater conditions. The sample found was a fragment of low-risk ‘white’ asbestos known as chrysotile asbestos&#8230;]]></description>
		<wfw:commentRss>http://www.thamestunnelconsultation.co.uk/2012/03/20/chambers-wharf-site-investigations-important-update/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Visit us at the boat race in Chiswick</title>
		<link>http://www.thamestunnelconsultation.co.uk/2012/03/19/visit-us-at-the-boat-race-in-chiswick/</link>
		<comments>http://www.thamestunnelconsultation.co.uk/2012/03/19/visit-us-at-the-boat-race-in-chiswick/#comments</comments>
		<pubDate>Mon, 19 Mar 2012 10:49:07 +0000</pubDate>
		<dc:creator>AvnishR</dc:creator>
				<category><![CDATA[Uncategorized]]></category>

		<guid isPermaLink="false">http://www.thamestunnelconsultation.co.uk/?p=2259</guid>
		<description><![CDATA[If you’re going to watch the Oxford and Cambridge crews battle it out on the river during the Easter weekend, take some time out to find out more about the proposed ‘Supersewer’.  Members from the project team will be on-hand&#8230;]]></description>
		<wfw:commentRss>http://www.thamestunnelconsultation.co.uk/2012/03/19/visit-us-at-the-boat-race-in-chiswick/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Thames Tunnel team gets &#8216;stuck in&#8217; to deep clean the river</title>
		<link>http://www.thamestunnelconsultation.co.uk/2012/03/09/thames-tunnel-team-gets-stuck-in-to-deep-clean-the-river/</link>
		<comments>http://www.thamestunnelconsultation.co.uk/2012/03/09/thames-tunnel-team-gets-stuck-in-to-deep-clean-the-river/#comments</comments>
		<pubDate>Fri, 09 Mar 2012 16:49:28 +0000</pubDate>
		<dc:creator>nhouse</dc:creator>
				<category><![CDATA[Uncategorized]]></category>

		<guid isPermaLink="false">http://www.thamestunnelconsultation.co.uk/?p=2250</guid>
		<description><![CDATA[Members of the Thames Tunnel Communications Team joined Thames21 at Battersea Bridge today  to help deep clean the river on the lowest tide of the year.   Over 40 volunteers donned steel toe capped boots and protective gloves to haul a&#8230;]]></description>
		<wfw:commentRss>http://www.thamestunnelconsultation.co.uk/2012/03/09/thames-tunnel-team-gets-stuck-in-to-deep-clean-the-river/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>New device unlocks sewer surveys</title>
		<link>http://www.thamestunnelconsultation.co.uk/2012/02/29/new-device-unlocks-thames-tunnel-sewer-surveys/</link>
		<comments>http://www.thamestunnelconsultation.co.uk/2012/02/29/new-device-unlocks-thames-tunnel-sewer-surveys/#comments</comments>
		<pubDate>Wed, 29 Feb 2012 14:18:47 +0000</pubDate>
		<dc:creator>nhouse</dc:creator>
				<category><![CDATA[Uncategorized]]></category>

		<guid isPermaLink="false">http://www.thamestunnelconsultation.co.uk/?p=2238</guid>
		<description><![CDATA[A specially designed ‘lock gate’ valve has been fitted in a Sir Joseph Bazalgette sewer near Westminster Bridge. The unique, stainless steel invention allows our surveyors to get vital measurements, needed to design the Thames Tunnel, from a key section&#8230;]]></description>
		<wfw:commentRss>http://www.thamestunnelconsultation.co.uk/2012/02/29/new-device-unlocks-thames-tunnel-sewer-surveys/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Alice in &#8216;Sewerland&#8217;</title>
		<link>http://www.thamestunnelconsultation.co.uk/2012/02/16/alice-in-sewerland/</link>
		<comments>http://www.thamestunnelconsultation.co.uk/2012/02/16/alice-in-sewerland/#comments</comments>
		<pubDate>Thu, 16 Feb 2012 13:08:07 +0000</pubDate>
		<dc:creator>nhouse</dc:creator>
				<category><![CDATA[Uncategorized]]></category>

		<guid isPermaLink="false">http://www.thamestunnelconsultation.co.uk/?p=2230</guid>
		<description><![CDATA[BBC TV ‘Coast’ presenter Dr Alice Roberts swapped beaches for sewers in December on a visit to Hammersmith Pumping Station, one of the sewer overflow points the Thames Tunnel needs to tackle. The Birmingham University professor was recording a Radio&#8230;]]></description>
		<wfw:commentRss>http://www.thamestunnelconsultation.co.uk/2012/02/16/alice-in-sewerland/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>End of phase two consultation</title>
		<link>http://www.thamestunnelconsultation.co.uk/2012/02/10/end-of-phase-two-consultation-2/</link>
		<comments>http://www.thamestunnelconsultation.co.uk/2012/02/10/end-of-phase-two-consultation-2/#comments</comments>
		<pubDate>Fri, 10 Feb 2012 17:48:54 +0000</pubDate>
		<dc:creator>AvnishR</dc:creator>
				<category><![CDATA[Uncategorized]]></category>

		<guid isPermaLink="false">http://www.thamestunnelconsultation.co.uk/?p=2217</guid>
		<description><![CDATA[The second round of public consultation for the Thames Tunnel closed today (10 February) at 5pm. Since the consultation began on 4 November 2011, we have staged 55 days of exhibition at 23 venues across London. We would like to&#8230;]]></description>
		<wfw:commentRss>http://www.thamestunnelconsultation.co.uk/2012/02/10/end-of-phase-two-consultation-2/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Riverside pupils present petition</title>
		<link>http://www.thamestunnelconsultation.co.uk/2012/02/09/riverside-pupils-present-petition/</link>
		<comments>http://www.thamestunnelconsultation.co.uk/2012/02/09/riverside-pupils-present-petition/#comments</comments>
		<pubDate>Thu, 09 Feb 2012 17:54:35 +0000</pubDate>
		<dc:creator>nhouse</dc:creator>
				<category><![CDATA[Uncategorized]]></category>

		<guid isPermaLink="false">http://www.thamestunnelconsultation.co.uk/?p=2186</guid>
		<description><![CDATA[School children from Riverside Primary School today presented a petition opposing the use of land at Chambers Wharf as a drive site for the Thames Tunnel. Phil Stride, Head of London Tideway Tunnels, received the petition which contained almost 2,000&#8230;]]></description>
		<wfw:commentRss>http://www.thamestunnelconsultation.co.uk/2012/02/09/riverside-pupils-present-petition/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
	</channel>
</rss>

