Timeline of documents

Post this page to FacebookPost this page to TwitterShare this pageEmail this pagePrint this page
  • 1. Scoping & Feasibility (2004 - 2005)
    View document Summary Download
    Cost Benefit Working Group ReportIdentify and evaluate the costs and benefits associated with the Tideway Solutions developed by the Solutions Working Group, and then to present a relative cost-benefit assessment of the different options.PDF
    (25 pages)
    Cost Benefit Working Group ReportAn assessment of the costs and benefits of the options under consideration.PDF
    (25 pages)
    Executive summaryStudy investigating the environmental impact of wet weather discharges from 57 CSOs through London and identifying different options for solutions.PDF
    (8 pages)
    Jacobs Babtie Independent ReviewIndependent Review to assess whether there are economic partial solutions to problems caused by sewage overflowing to the River Thames when it rains.PDF
    (79 pages)
    Objectives and Compliance Working Group - Report 1Report of the objectives and compliance working group .PDF
    (26 pages)
    Objectives and Compliance Working Group - Report 2Second volume of the report of the objectives and compliance working group.PDF
    (43 pages)
    Planning and Environment Working Group ReportReport of the Planning and Environment Working GroupPDF
    (93 pages)
    Solutions Working Group - Report 1Working group report on tunnels and shafts.PDF
    (90 pages)
    Solutions Working Group - Report 2Solutions working group report on treatment.PDF
    (28 pages)
    Steering Group ReportFinal report of the steering group.PDF
    (55 pages)
    Summary ReportOption development report for the Thames Tideway Tunnel and Sewage Treatment Works upgrades.PDF
    (57 pages)
    Supplementary ReportFurther investigation of the proposed long-term tunnel solution and of alternative measures including temporary or interim works and some smaller scale tunnel and/or treatment options to deal with the discharge of storm water from Combined Sewer Overflows (CSOs) into the Thames Tideway.PDF
    (12 pages)
    Volume 1 - Objectives Working Group ReportReport to establish a series of objectives to meet the broad aspirational aim.PDF
    (24 pages)
    Volume 1 - Solutions Working Group ReportContribution of the Solution Group to the strategic investigation of the Tideway Combined Sewer Overflow (CSO) discharges.PDF
    (188 pages)
    Volume 2 - Objectives Working Group Modelling StudyModelling study to assess the proposed solutions developed by the Solutions Group against the objectives for dissolved oxygen in the Tideway.PDF
    (26 pages)
    Volume 2 - Solutions Working Group Refinement ReportThe refinement of the scope of the storage tunnel option including re-evaluation of the cost estimates and risk assessment.PDF
    (46 pages)
  • 2. Site Selection Strategy Phase (2009)
    View document Summary Download
    Background Technical PaperTechnical paper providing information about the background and the engineering requirements of the Thames Tunnel Project. This paper includes engineering requirements that had a bearing on site selection process, including design developments during course of site selection.  PDF
    (39 pages)
    Site Selection Methodology PaperThis paper summarises the background to the project and details the methodology used to select construction sites along the route of the Thames Tunnel.PDF
    (32 pages)
  • 3. Confirmation of the Need for the Thames Tunnel (2009 - 2010)
    View document Summary Download
    Needs ReportPaper considering the need for the Thames Tunnel taking into account the Lee Tunnel and other London Tideway Improvements, namely the sewage treatment works upgrades.  PDF
    (91 pages)
    Needs Report – Appendix AAppendices to the Needs Report containing Ministerial Correspondence and Regulatory Impact Assessment.  PDF
    (75 pages)
    Needs Report – Appendix BAppendices to the Needs Report containing Report on Approaches to the Urban Waste Water Treatment Directive and Compliance in Relation to CSOs in major cities across the EU.  PDF
    (76 pages)
    Needs Report – Appendix CAppendices to the Needs Report containing London population statistics.  PDF
    (5 pages)
    Needs Report – Appendix DAppendices to the Needs Report containing final Sewer Separation Feasibility Study and total Sewer Separation costs.  PDF
    (147 pages)
    Needs Report – Appendix EAppendices to the Needs Report containing information on Potential Source Control, SUDS Applications and SUDS Evaluation for Example Areas.  PDF
    (235 pages)
    Needs Report – Appendix FAppendices to the Needs Report containing Tideway Fisheries Review.  PDF
    (60 pages)
  • 4. Phase one consultation (Sep 2010 - Jan 2011)
    View document Summary Download
    Abbey Mills Pumping Station - phase one site information paperSite specific information paper about the shortlisted sites and preferred option for a worksite in the Abbey Mills area to be used to construct the main tunnel of the project. Paper describes use of preferred site during construction and permanent use after construction is finished.PDF
    (4 pages)
    Acton Storm Tanks - phase one site information paperSite specific information paper about the shortlisted sites and preferred option for a worksite to connect to the CSO known as Acton Storm Relief. Paper describes use of preferred site during construction and permanent use after construction is finished.PDF
    (4 pages)
    Albert Embankment Foreshore - phase one site information paperSite specific information paper about the shortlisted sites and preferred option for a worksite to connect to two local CSOs known as Clapham Storm Relief and Brixton Storm Relief. Paper describes use of preferred site during construction and permanent use after construction is finished.PDF
    (4 pages)
    Amalgamated Report - Appendices (combined pdf file)The appendices included the main report of phase one consultation for the Thames Tunnel. The document provides a detailed analysis of the responses received on the need for the tunnel, the route, the sites, the approach to consultation and the next steps moving forward.PDF
    (85 pages)
    Amalgamated Report - Main Report (combined pdf file)The main report of phase one consultation for the Thames Tunnel. The document provides a detailed analysis of the responses received on the need for the tunnel, the route, the sites, the approach to consultation and the next steps moving forward.PDF
    (170 pages)
    Amendments to the Report on phase one consultationDocument setting out the amendments to the Report on phase one consultation following its publication.PDF
    (3 pages)
    Barn Elms - phase one site information paperSite specific information paper about the shortlisted sites and preferred option for a worksite in the Barn Elms area to be used to construct the main tunnel of the project and also to connect to the CSO known as West Putney Storm Relief Sewer.PDF
    (6 pages)
    Beckton Sewage Treatment Works - phase one site information paperSite specific information paper about types of works proposed at Beckton Sewage Treatment Works such as the installation of additional pumps and extension of odour control facilities.PDF
    (2 pages)
    Bell Lane Creek - phase one site information paperSite specific information paper about the shortlisted site and preferred option for a worksite to connect to the CSO known as Frogmore Storm Relief. Paper describes use of preferred site during construction and permanent use after construction is finished.PDF
    (4 pages)
    Blackfriars Bridge Foreshore - phase one site information paperSite specific information paper about the preferred option for a worksite to connect Fleet Main CSO and the northern Low Level Number 1 Sewer to the main tunnel. Paper describes use of preferred site during construction and permanent use after construction is finished.PDF
    (4 pages)
    Borthwick Wharf Foreshore - phase one site information paperSite specific information paper about the shortlisted sites and preferred option for a worksite to connect to the CSO known as Deptford Storm Relief. Paper describes use of preferred site during construction and permanent use after construction is finished.PDF
    (4 pages)
    Bridges Court Car Park - phase one site information paperSite specific information paper about the shortlisted sites and preferred option for a worksite to connect to the CSO known as Falconbrook Pumping Station. Paper describes use of preferred site during construction and permanent use after construction is finished.PDF
    (4 pages)
    Build – How we will build the tunnelProject information paper explaining the stages of how the Thames Tunnel will be built, looking at the key points required in construction as well as the balancing act of how Thames Water have arrived at the solution of the particular type of tunnel proposed.PDF
    (3 pages)
    Butcher Row - phase one site information paperSite specific information paper about the shortlisted sites and preferred option for a worksite to connect to the CSO known as Holloway Storm Relief. Paper describes use of preferred site during construction and permanent use after construction is finished.PDF
    (4 pages)
    Chapter 01 - IntroductionThe supplementary report provides a detailed record of phase one consultation with respect to feedback received from respondents, in a tabular format and an analysis of the issues raised and Thames Water’s initial response to the issues.PDF
    (2 pages)
    Chapter 02-04 - Need, Solution and RouteThe supplementary report provides a detailed record of phase one consultation with respect to feedback received from respondents, in a tabular format and an analysis of the issues raised and Thames Water’s initial response to the issues.PDF
    (66 pages)
    Chapter 29 - Consultation ProcessThe supplementary report provides a detailed record of phase one consultation with respect to feedback received from respondents, in a tabular format and an analysis of the issues raised and Thames Water’s initial response to the issues.PDF
    (71 pages)
    Chelsea Embankment Foreshore - phase one site information paperSite specific information paper about the preferred option for a worksite to connect Ranelagh CSO and the northern Low Level Number 1 Sewer to the main tunnel. Paper describes use of preferred site during construction and permanent use after construction is finished.PDF
    (4 pages)
    Community consultation strategyThames Water proposes to design and build and operate a tunnel to capture untreated sewage, which currently flows directly into the River Thames after as little as 2mm of rainfall.  This community consultation strategy, summarised in the formal Statement of Community Consultation, sets out our approach and timetable for consulting all those with an interest in the proposed Thames Tunnel.PDF
    (20 pages)
    Construction sites - The site selection processProject information paper explaining the rigorous process for choosing the most suitable worksites for the project to go ahead.PDF
    (2 pages)
    Cover, contents and list of abbreviationsThe main report of phase one consultation for the Thames Tunnel. The document provides a detailed analysis of the responses received on the need for the tunnel, the route, the sites, the approach to consultation and the next steps moving forward.PDF
    (8 pages)
    Cover, contents and list of abbreviationsThe supplementary report provides a detailed record of phase one consultation with respect to feedback received from respondents, in a tabular format and an analysis of the issues raised and Thames Water’s initial response to the issues.PDF
    (5 pages)
    Cremorne Wharf Foreshore - phase one site information paperSite specific information paper about the preferred option for a worksite to connect to the CSO known as Lots Road Pumping Station. Paper describes use of preferred site during construction and permanent use after construction is finished.PDF
    (4 pages)
    Customer overview leafletBooklet aimed at Thames Water customers about the need for the tunnel, the initial proposals and the big picture.  PDF
    (5 pages)
    Depth – Tunnelling under LondonProject information paper explaining the depth of the main tunnel and some key considerations and constraints to be taken into account when deciding the route, such as location of CSOs and avoidance of existing underground infrastructure such as road tunnels and mains electricity cables.PDF
    (2 pages)
    Druid Street - phase one site information paperSite specific information paper about the shortlisted sites and preferred option for a worksite to connect to the CSO known as Shad Thames Pumping Station. Paper describes use of preferred site during construction and permanent use after construction is finished.PDF
    (4 pages)
    Earl Pumping Station - phase one site information paperSite specific information paper about the shortlisted sites and preferred option for a worksite to connect to the CSO known as Earl Pumping Station. Paper describes use of preferred site during construction and permanent use after construction is finished.PDF
    (4 pages)
    Environment – Caring for the EnvironmentProject information paper explaining the various topics which will be included in the appraisal of environmental issues affecting the tunnel, such as: air quality, archaeology, flood risk and noise.PDF
    (4 pages)
    ForewordThe main report of phase one consultation for the Thames Tunnel. The document provides a detailed analysis of the responses received on the need for the tunnel, the route, the sites, the approach to consultation and the next steps moving forward.PDF
    (2 pages)
    Funding – How we will fund constructionProject information paper explaining how the project will be funded including information of the likely financial impacts on Thames Water customers over the period of the project and into the future.PDF
    (2 pages)
    GlossaryGlossary of terms.PDF
    (3 pages)
    GlossaryGlossary of terms.PDF
    (3 pages)
    Greenwich Pumping Station - phase one site information paperSite specific information paper about the shortlisted site and preferred option for a worksite to connect to the CSO known as Greenwich Pumping Station. Paper describes use of preferred site during construction and permanent use after construction is finished.PDF
    (4 pages)
    Greenwich Pumping Station – Information PaperInformation Paper looking at the option for a new tunnelling strategy and an alternative proposal to tunnel from King’s Stairs Gardens to Greenwich Pumping Station, to provide a connection tunnel from Greenwich Pumping Station to proposed site at Chambers Wharf.PDF
    (2 pages)
    Hammersmith Pumping Station - phase one site information paperSite specific information paper about the shortlisted sites and preferred option for a worksite in the Hammersmith area to be used to construct the main tunnel of the project and also to connect to the CSO known as Hammersmith Pumping Station.  PDF
    (4 pages)
    Heckford Street Industrial Area – Information PaperInformation paper discussing work to connect to the North East Storm Relief CSO and, as a response to community feedback, looking at the option of combining a site in Heckford Street Industrial Area with a worksite at King Edward Memorial Park.PDF
    (2 pages)
    Jews Row - phase one site information paperSite specific information paper about the shortlisted sites and preferred option for a worksite to connect two local CSOs known as Falconbrook Storm Relief and Wandle Valley Storm Relief. Paper describes use of preferred site during construction and permanent use after construction is finished.  PDF
    (4 pages)
    King Edward Memorial Park Foreshore - phase one site information paperSite specific information paper about the shortlisted site and preferred option for a worksite to connect to the CSO known as North East Storm Relief. Paper describes use of preferred site during construction and permanent use after construction is finished.  PDF
    (4 pages)
    King George’s Park - phase one site information paperSite specific information paper about the shortlisted site and preferred option for a worksite to connect to the CSO known as Frogmore Storm Relief. Paper describes use of preferred site during construction and permanent use after construction is finished.  PDF
    (4 pages)
    King’s Stairs Gardens - phase one site information paperSite specific information paper about the preferred option for a worksite in the Bermondsey area to be used to construct the main tunnel of the project and also to connect four local CSOs from the surrounding area to the tunnel.  PDF
    (4 pages)
    Land – How will we fund constructionProject information paper explaining how Thames Water will aim to ensure that worksites are, as far as possible, returned to their previous states, or improved once work is completed.PDF
    (2 pages)
    Main Report on Phase 1 Consultation – Appendix A, Route MapMain Report on Phase 1 Consultation – Appendix A, Route MapPDF
    (2 pages)
    Main Report on Phase 1 Consultation – Appendix B, Statement of Community ConsultationStatement of Community ConsultationPDF
    (2 pages)
    Main Report on Phase 1 Consultation – Appendix C, Statutory ConsulteesStatutory ConsulteesPDF
    (5 pages)
    Main Report on Phase 1 Consultation – Appendix D, Newspaper AdvertsNewspaper AdvertsPDF
    (3 pages)
    Main Report on Phase 1 Consultation – Appendix E, Letter TypesLetter TypesPDF
    (19 pages)
    Main Report on Phase 1 Consultation – Appendix F, Community Audit Methodology and DataCommunity Audit Methodology and DataPDF
    (36 pages)
    Main Report on Phase 1 Consultation – Appendix G, Public Meetings with StakeholdersPublic Meetings with StakeholdersPDF
    (3 pages)
    Main Report on Phase 1 Consultation – Appendix H, Town Halls and LibrariesTown Halls and LibrariesPDF
    (2 pages)
    Main Report on Phase 1 Consultation – Appendix I, Exhibitions and Visitor NumbersExhibitions and Visitor NumbersPDF
    (4 pages)
    Main Report on Phase 1 Consultation – Appendix J, Feedback FormFeedback FormPDF
    (5 pages)
    Main Report on Phase 1 Consultation – Appendix K, Feedback QuantificationFeedback QuantificationPDF
    (3 pages)
    Managing ConstructionProject information paper explaining the measures already undertaken and that will be implemented during construction to minimise disruption to communities across London.PDF
    (2 pages)
    Map - LondonLondon wide map showing the route of the preferred tunnel and other considered routes as well as locations of preferred and other worksites.  PDF
    (1 pages)
    Map – Central LondonMap of Central London showing preferred and other considered routes, local CSOs, pumping stations and worksites.  PDF
    (1 pages)
    Map – East LondonMap of East London showing preferred and other considered routes, local CSOs, pumping stations and worksites  PDF
    (1 pages)
    Map – West LondonMap of West London showing preferred route, local CSOs, pumping stations and worksites.  PDF
    (1 pages)
    OdourProject information paper explaining the mitigation measures Thames Water are proposing to ensure that the tunnel is adequately ventilated and that odour cannot become a nuisance.PDF
    (2 pages)
    Options – Alternatives to the Thames TunnelProject information paper looking at the various alternative options to the Thames Tunnel , including sustainable urban drainage systems, separation of the sewerage system, bubbler and skimmers boats and storage and transfer.PDF
    (4 pages)
    Other Shortlisted Sites - phase one site information paperSite specific information paper identifying different sites that were shortlisted for the Rotherhide and River Thames tunnel routes but were not required for the preferred Abbey Mills Route.  PDF
    (5 pages)
    Other Works - phase one site information paperSite specific information paper explaining other works to be undertaken in association with the Thames Tunnel project which include connections to northern Low Level Number 1 Sewer, minor sewer modifications and safety access points, as well as differences to works to intercept Charlton CSO.  PDF
    (6 pages)
    Overflow – Why we need to clean up the ThamesProject information paper providing information on how the existing sewage system is inadequate for modern needs and subsequently why the Thames Tunnel is required and how it will help combat overflows of sewage into the Thames.PDF
    (4 pages)
    Project OverviewOverview of the complete Thames Tunnel project for phase one consultation.PDF
    (41 pages)
    Putney Bridge Foreshore - phase one site information paperSite specific information paper about the shortlisted sites and preferred option for a worksite to connect to the CSO known as Putney Bridge. Paper describes use of preferred site during construction and permanent use after construction is finished.  PDF
    (4 pages)
    Regulatory frameworkProject information paper setting out the regulatory framework Thames Water is required to work within as set out by key organisations such as the European Union, Ofwat, the Environment Agency and Local Authorities.PDF
    (2 pages)
    Report on phase one consultation - Abbey Mills Pumping StationThe main report of phase one consultation for the Thames Tunnel. The document provides a detailed analysis of the responses received on the need for the tunnel, the route, the sites, the approach to consultation and the next steps moving forward.PDF
    (4 pages)
    Report on phase one consultation - Acton Storm TanksThe main report of phase one consultation for the Thames Tunnel. The document provides a detailed analysis of the responses received on the need for the tunnel, the route, the sites, the approach to consultation and the next steps moving forward.PDF
    (4 pages)
    Report on phase one consultation - Albert Embankment ForeshoreThe main report of phase one consultation for the Thames Tunnel. The document provides a detailed analysis of the responses received on the need for the tunnel, the route, the sites, the approach to consultation and the next steps moving forward.PDF
    (4 pages)
    Report on phase one consultation - Barn ElmsThe main report of phase one consultation for the Thames Tunnel. The document provides a detailed analysis of the responses received on the need for the tunnel, the route, the sites, the approach to consultation and the next steps moving forward.PDF
    (7 pages)
    Report on phase one consultation - Beckton Sewage Treatment WorksThe main report of phase one consultation for the Thames Tunnel. The document provides a detailed analysis of the responses received on the need for the tunnel, the route, the sites, the approach to consultation and the next steps moving forward.PDF
    (2 pages)
    Report on phase one consultation - Bell Lane CreekThe main report of phase one consultation for the Thames Tunnel. The document provides a detailed analysis of the responses received on the need for the tunnel, the route, the sites, the approach to consultation and the next steps moving forward.PDF
    (3 pages)
    Report on phase one consultation - Blackfriars Bridge ForeshoreThe main report of phase one consultation for the Thames Tunnel. The document provides a detailed analysis of the responses received on the need for the tunnel, the route, the sites, the approach to consultation and the next steps moving forward.PDF
    (4 pages)
    Report on phase one consultation - Borthwick Wharf ForeshoreThe main report of phase one consultation for the Thames Tunnel. The document provides a detailed analysis of the responses received on the need for the tunnel, the route, the sites, the approach to consultation and the next steps moving forward.PDF
    (4 pages)
    Report on phase one consultation - Bridges Court Car ParkThe main report of phase one consultation for the Thames Tunnel. The document provides a detailed analysis of the responses received on the need for the tunnel, the route, the sites, the approach to consultation and the next steps moving forward.PDF
    (4 pages)
    Report on phase one consultation - Butcher RowThe main report of phase one consultation for the Thames Tunnel. The document provides a detailed analysis of the responses received on the need for the tunnel, the route, the sites, the approach to consultation and the next steps moving forward.PDF
    (4 pages)
    Report on phase one consultation - Chelsea Embankment ForeshoreThe main report of phase one consultation for the Thames Tunnel. The document provides a detailed analysis of the responses received on the need for the tunnel, the route, the sites, the approach to consultation and the next steps moving forward.PDF
    (3 pages)
    Report on phase one consultation - Cremorne Wharf ForeshoreThe main report of phase one consultation for the Thames Tunnel. The document provides a detailed analysis of the responses received on the need for the tunnel, the route, the sites, the approach to consultation and the next steps moving forward.PDF
    (4 pages)
    Report on phase one consultation - Druid StreetThe main report of phase one consultation for the Thames Tunnel. The document provides a detailed analysis of the responses received on the need for the tunnel, the route, the sites, the approach to consultation and the next steps moving forward.PDF
    (4 pages)
    Report on phase one consultation - Earl Pumping StationThe main report of phase one consultation for the Thames Tunnel. The document provides a detailed analysis of the responses received on the need for the tunnel, the route, the sites, the approach to consultation and the next steps moving forward.PDF
    (4 pages)
    Report on phase one consultation - Greenwich Pumping StationThe main report of phase one consultation for the Thames Tunnel. The document provides a detailed analysis of the responses received on the need for the tunnel, the route, the sites, the approach to consultation and the next steps moving forward.PDF
    (3 pages)
    Report on phase one consultation - Hammersmith Pumping StationThe main report of phase one consultation for the Thames Tunnel. The document provides a detailed analysis of the responses received on the need for the tunnel, the route, the sites, the approach to consultation and the next steps moving forward.PDF
    (5 pages)
    Report on phase one consultation - Jews RowThe main report of phase one consultation for the Thames Tunnel. The document provides a detailed analysis of the responses received on the need for the tunnel, the route, the sites, the approach to consultation and the next steps moving forward.PDF
    (4 pages)
    Report on phase one consultation - King Edward Memorial Park ForeshoreThe main report of phase one consultation for the Thames Tunnel. The document provides a detailed analysis of the responses received on the need for the tunnel, the route, the sites, the approach to consultation and the next steps moving forward.PDF
    (5 pages)
    Report on phase one consultation - Kings George’s ParkThe main report of phase one consultation for the Thames Tunnel. The document provides a detailed analysis of the responses received on the need for the tunnel, the route, the sites, the approach to consultation and the next steps moving forward.PDF
    (4 pages)
    Report on phase one consultation - King’s Stairs GardensThe main report of phase one consultation for the Thames Tunnel. The document provides a detailed analysis of the responses received on the need for the tunnel, the route, the sites, the approach to consultation and the next steps moving forward.PDF
    (5 pages)
    Report on phase one consultation - Putney BridgeThe main report of phase one consultation for the Thames Tunnel. The document provides a detailed analysis of the responses received on the need for the tunnel, the route, the sites, the approach to consultation and the next steps moving forward.PDF
    (5 pages)
    Report on phase one consultation - Tideway WalkThe main report of phase one consultation for the Thames Tunnel. The document provides a detailed analysis of the responses received on the need for the tunnel, the route, the sites, the approach to consultation and the next steps moving forward.PDF
    (5 pages)
    Report on phase one consultation - Victoria Embankment ForeshoreThe main report of phase one consultation for the Thames Tunnel. The document provides a detailed analysis of the responses received on the need for the tunnel, the route, the sites, the approach to consultation and the next steps moving forward.PDF
    (3 pages)
    Routes – Development of the tunnel routeProject information paper showing the development of the different route options for the Thames Tunnel and outlining the preferred route and reasons for this choice.PDF
    (3 pages)
    Section 1 - Approach to consultationThe main report of phase one consultation for the Thames Tunnel. The document provides a detailed analysis of the responses received on the need for the tunnel, the route, the sites, the approach to consultation and the next steps moving forward.PDF
    (24 pages)
    Section 2 - Need, solution and tunnel routeThe main report of phase one consultation for the Thames Tunnel. The document provides a detailed analysis of the responses received on the need for the tunnel, the route, the sites, the approach to consultation and the next steps moving forward.PDF
    (20 pages)
    Section 4 - Approach to consultationThe main report of phase one consultation for the Thames Tunnel. The document provides a detailed analysis of the responses received on the need for the tunnel, the route, the sites, the approach to consultation and the next steps moving forward.PDF
    (7 pages)
    Section 5 - ConclusionThe main report of phase one consultation for the Thames Tunnel. The document provides a detailed analysis of the responses received on the need for the tunnel, the route, the sites, the approach to consultation and the next steps moving forward.PDF
    (6 pages)
    Statement of Community ConsultationOur statement on who we will consult, how we will consult and what we will consult stakeholders on regarding the Thames Tunnel.PDF
    (1 pages)
    Summary Report on Phase 1 ConsultationA summary of the main report of phase one consultation for the Thames Tunnel. The document provides a summary of the responses received on the need for the tunnel, the route, the sites, the approach to consultation and the next steps moving forward.PDF
    (50 pages)
    Supplementary Report (combined pdf file)The supplementary report provides a detailed record of phase one consultation with respect to feedback received from respondents, in a tabular format and an analysis of the issues raised and Thames Water’s initial response to the issues.PDF
    (797 pages)
    Supplementary report on phase one consultation - Abbey Mills Pumping StationThe supplementary report provides a detailed record of phase one consultation with respect to feedback received from respondents, in a tabular format and an analysis of the issues raised and Thames Water’s initial response to the issues.PDF
    (15 pages)
    Supplementary report on phase one consultation - Acton Storm TanksThe supplementary report provides a detailed record of phase one consultation with respect to feedback received from respondents, in a tabular format and an analysis of the issues raised and Thames Water’s initial response to the issues.PDF
    (27 pages)
    Supplementary report on phase one consultation - Albert Embankment ForeshoreThe supplementary report provides a detailed record of phase one consultation with respect to feedback received from respondents, in a tabular format and an analysis of the issues raised and Thames Water’s initial response to the issues.PDF
    (20 pages)
    Supplementary report on phase one consultation - Barn ElmsThe supplementary report provides a detailed record of phase one consultation with respect to feedback received from respondents, in a tabular format and an analysis of the issues raised and Thames Water’s initial response to the issues.PDF
    (82 pages)
    Supplementary report on phase one consultation - Beckton Sewage Treatment WorksThe supplementary report provides a detailed record of phase one consultation with respect to feedback received from respondents, in a tabular format and an analysis of the issues raised and Thames Water’s initial response to the issues.PDF
    (5 pages)
    Supplementary report on phase one consultation - Bell Lane CreekThe supplementary report provides a detailed record of phase one consultation with respect to feedback received from respondents, in a tabular format and an analysis of the issues raised and Thames Water’s initial response to the issues.PDF
    (12 pages)
    Supplementary report on phase one consultation - Blackfriars Bridge ForeshoreThe supplementary report provides a detailed record of phase one consultation with respect to feedback received from respondents, in a tabular format and an analysis of the issues raised and Thames Water’s initial response to the issues.PDF
    (13 pages)
    Supplementary report on phase one consultation - Borthwick Wharf ForeshoreThe supplementary report provides a detailed record of phase one consultation with respect to feedback received from respondents, in a tabular format and an analysis of the issues raised and Thames Water’s initial response to the issues.PDF
    (27 pages)
    Supplementary report on phase one consultation - Bridge’s Court Car ParkThe supplementary report provides a detailed record of phase one consultation with respect to feedback received from respondents, in a tabular format and an analysis of the issues raised and Thames Water’s initial response to the issues.PDF
    (27 pages)
    Supplementary report on phase one consultation - Butcher RowThe supplementary report provides a detailed record of phase one consultation with respect to feedback received from respondents, in a tabular format and an analysis of the issues raised and Thames Water’s initial response to the issues.PDF
    (24 pages)
    Supplementary report on phase one consultation - Chelsea EmbankmentThe supplementary report provides a detailed record of phase one consultation with respect to feedback received from respondents, in a tabular format and an analysis of the issues raised and Thames Water’s initial response to the issues.PDF
    (12 pages)
    Supplementary report on phase one consultation - Cremorne Wharf ForeshoreThe supplementary report provides a detailed record of phase one consultation with respect to feedback received from respondents, in a tabular format and an analysis of the issues raised and Thames Water’s initial response to the issues.PDF
    (17 pages)
    Supplementary report on phase one consultation - Druid StreetThe supplementary report provides a detailed record of phase one consultation with respect to feedback received from respondents, in a tabular format and an analysis of the issues raised and Thames Water’s initial response to the issues.PDF
    (27 pages)
    Supplementary report on phase one consultation - Earl Pumping StationThe supplementary report provides a detailed record of phase one consultation with respect to feedback received from respondents, in a tabular format and an analysis of the issues raised and Thames Water’s initial response to the issues.PDF
    (14 pages)
    Supplementary report on phase one consultation - Greenwich Pumping StationThe supplementary report provides a detailed record of phase one consultation with respect to feedback received from respondents, in a tabular format and an analysis of the issues raised and Thames Water’s initial response to the issues.PDF
    (11 pages)
    Supplementary report on phase one consultation - Hammersmith Pumping StationThe supplementary report provides a detailed record of phase one consultation with respect to feedback received from respondents, in a tabular format and an analysis of the issues raised and Thames Water’s initial response to the issues.PDF
    (37 pages)
    Supplementary report on phase one consultation - Jews RowThe supplementary report provides a detailed record of phase one consultation with respect to feedback received from respondents, in a tabular format and an analysis of the issues raised and Thames Water’s initial response to the issues.PDF
    (23 pages)
    Supplementary report on phase one consultation - King Edward Memorial ParkThe supplementary report provides a detailed record of phase one consultation with respect to feedback received from respondents, in a tabular format and an analysis of the issues raised and Thames Water’s initial response to the issues.PDF
    (56 pages)
    Supplementary report on phase one consultation - King George’s ParkThe supplementary report provides a detailed record of phase one consultation with respect to feedback received from respondents, in a tabular format and an analysis of the issues raised and Thames Water’s initial response to the issues.PDF
    (14 pages)
    Supplementary report on phase one consultation - King’s Stairs GardensThe supplementary report provides a detailed record of phase one consultation with respect to feedback received from respondents, in a tabular format and an analysis of the issues raised and Thames Water’s initial response to the issues.PDF
    (50 pages)
    Supplementary report on phase one consultation - Other shortlisted Sites and Other WorksThe supplementary report provides a detailed record of phase one consultation with respect to feedback received from respondents, in a tabular format and an analysis of the issues raised and Thames Water’s initial response to the issues.PDF
    (48 pages)
    Supplementary report on phase one consultation - Putney Bridge ForeshoreThe supplementary report provides a detailed record of phase one consultation with respect to feedback received from respondents, in a tabular format and an analysis of the issues raised and Thames Water’s initial response to the issues.PDF
    (48 pages)
    Supplementary report on phase one consultation - Tideway WalkThe supplementary report provides a detailed record of phase one consultation with respect to feedback received from respondents, in a tabular format and an analysis of the issues raised and Thames Water’s initial response to the issues.PDF
    (24 pages)
    Supplementary report on phase one consultation - Victoria Embankment ForeshoreThe supplementary report provides a detailed record of phase one consultation with respect to feedback received from respondents, in a tabular format and an analysis of the issues raised and Thames Water’s initial response to the issues.PDF
    (17 pages)
    Tideway Walk - phase one site information paperSite specific information paper about the shortlisted sites and preferred option for a worksite in the Battersea area to be used to construct the main tunnel of the project and also to connect two CSOs known as Heathwall Pumping Station and South West Storm Relief.  PDF
    (6 pages)
    Timing - Likely timescaleProject information paper identifying the key dates associated with the project up to its completion in 2020.PDF
    (2 pages)
    Transport – Using the river to transport materialsProject information paper explaining the preferred choice of river transport to move materials for the construction of the Thames Tunnel therefore, as far as possible, practicable and cost effective, reducing impact on local roads and highways.PDF
    (2 pages)
    Victoria Embankment Foreshore - phase one site information paperSite specific information paper about the shortlisted site and preferred option for a worksite to connect Regent Street CSO and the northern Low Level Number 1 Sewer to the main tunnel. Paper describes use of preferred site during construction and permanent use after construction is finished.  PDF
    (4 pages)
    Views – Tell us what you thinkProject information paper providing information on consultation objectives as well as varying ways of contacting and leaving feedback for the project team.PDF
    (2 pages)
    Why does London need the Thames Tunnel?A background to the reasons behind the requirement for the Thames Tunnel including a brief history, reasons why it is time to act now, the challenges the project faces, examples of similar projects in other major cities around the world and the alternative options considered.PDF
    (24 pages)
  • 5. New site information (Mar 2011 - July 2011)
    View document Summary Download
    Action Storm Tanks Information paper (modified proposals)Information paper explaining the potential new layout and use of the Acton Storm Tanks site.PDF
    (2 pages)
    Application formApplication form for the exceptional hardship procedure.PDF
    (8 pages)
    Assistance guideGuide to help you fill out the application form for the exceptional hardship procedure.PDF
    (6 pages)
    Carnwath Road Riverside – Information PaperInformation paper looking at an option for a major worksite in alternative location to Barn Elms Playing Fields on industrial land at Carnwath Road. The site has been identified as a possible ‘drive’ site for the main tunnel.PDF
    (2 pages)
    Carnwath Road Riverside – Letter to local residentsCopy of letter to local residents explaining ongoing investigations into potential for using site at Carnwath Road Riverside as main ‘drive’ site. Letter extends invite to drop in sessions for residents to answer questions and take note of issues raised.PDF
    (2 pages)
    Carnwath Road Riverside – Location PlanSite Plan identifying potential new worksite at Carnwath Road.PDF
    (1 pages)
    Chambers Wharf – Information PaperInformation paper looking at an option for a major worksite in alternative location to King’s Stairs Gardens at Chambers Wharf, to the west of King’s Stairs Gardens.PDF
    (2 pages)
    Chambers Wharf – Letter to local residentsCopy of letter to local residents explaining that Chambers Wharf had become an alternative option as a major works site as it had recently returned to the market. The letter extends an invite to local residents to answer questions and take note of issues raised.PDF
    (2 pages)
    Chambers Wharf – Location PlanSite Plan identifying potential new worksite at Chambers Wharf.PDF
    (1 pages)
    Cremorne Wharf Depot - Location PlanLocation plan of the potential new site at Cremorne Wharf Depot.PDF
    (1 pages)
    Deptford Church Street – Information PaperInformation paper discussing the proposed location for a worksite needed to connect the Deptford Storm Relief CSO as a result of community feedback raised in phase one consultation. New potential site is located adjacent to Deptford Church Street and between Crossfield and Coffey Street.PDF
    (2 pages)
    Dormay Street – Information PaperInformation paper looking at an alternative worksite at Dormay Street to be used to connect the CSO known as Frogmore Storm Relief – Bell Lane Creek.PDF
    (2 pages)
    Dormay Street – Location PlanSite Plan identifying potential new worksite at Dormay Street.PDF
    (1 pages)
    Falconbrook Pumping Station – Information PaperInformation paper looking at a potential alternative worksite to connect CSO known as Falconbrook Pumping Station. During first phase of public consultation proposal was to use Bridges Court Car Park but now an alternative site at Falconbrook Pumping Station has been identified as a possibility.PDF
    (2 pages)
    Falconbrook Pumping Station – Location PlanSite Plan identifying potential new worksite at Falconbrook Pumping Station.PDF
    (1 pages)
    Frequently asked questionsFrequently asked questions about the exception hardship procedure.PDF
    (3 pages)
    Kirtling Street (modified proposals) - Letter to local propertiesLetter to the local community surrounding the potential Kirtling Street site regarding the modified proposals.PDF
    (2 pages)
    Kirtling Street (modified site proposal) - Information PaperInformation paper explaining the modified proposals for the potential Kirtling Street site.PDF
    (2 pages)
    Kirtling Street - Information paperInformation paper giving details on a potential new site option at Kirtling Street.PDF
    (2 pages)
    Kirtling Street - Location PlanLocation plan of the potential new site at Kirtling Street.PDF
    (1 pages)
    News item: New site option at Cremorne WharfArticle reporting on the public meeting held with stakeholders in the vicinity of Lots Road/Cremorne Wharf to publicise the potential new site at Cremorne Wharf Depot.PDF
    (1 pages)
    Shad Thames Pumping Station - Information PaperInformation paper discussing the proposed works at the Shad Pumping Station CSO. The paper provides a location plan and advises on reasons behind a potential move of works to Maguire Street instead of Druid Street.PDF
    (2 pages)
  • 6. Scheme Development: Environmental Information (2011)
    View document Summary Download
    EIA Scoping Results - City of London
    Environmental Impact Assessment Scoping Report to request Scoping Opinion from stakeholders for the Thames Tunnel project.
    PDF
    (25 pages)
    EIA Scoping Results - City of Westminster
    Environmental Impact Assessment Scoping Report to request Scoping Opinion from stakeholders for the Thames Tunnel project.
     
    PDF
    (24 pages)
    EIA Scoping Results - IntroductionEnvironmental Impact Assessment Scoping Report to request Scoping Opinion from local stakeholders for the Thames Tunnel Project.PDF
    (10 pages)
    EIA Scoping Results - London Borough of Ealing
    Environmental Impact Assessment Scoping Report to request Scoping Opinion from stakeholders for the Thames Tunnel project.
     
    PDF
    (22 pages)
    EIA Scoping Results - London Borough of Greenwich
    Environmental Impact Assessment Scoping Report to request Scoping Opinion from stakeholders for the Thames Tunnel project.
     
    PDF
    (42 pages)
    EIA Scoping Results - London Borough of Hammersmith & Fulham
    Environmental Impact Assessment Scoping Report to request Scoping Opinion from stakeholders for the Thames Tunnel project.
     
    PDF
    (24 pages)
    EIA Scoping Results - London Borough of Hounslow
    Environmental Impact Assessment Scoping Report to request Scoping Opinion from stakeholders for the Thames Tunnel project.
     
    PDF
    (7 pages)
    EIA Scoping Results - London Borough of Lambeth
    Environmental Impact Assessment Scoping Report to request Scoping Opinion from stakeholders for the Thames Tunnel project.
     
    PDF
    (26 pages)
    EIA Scoping Results - London Borough of Lewisham
    Environmental Impact Assessment Scoping Report to request Scoping Opinion from stakeholders for the Thames Tunnel project.
     
    PDF
    (22 pages)
    EIA Scoping Results - London Borough of Newham
    Environmental Impact Assessment Scoping Report to request Scoping Opinion from stakeholders for the Thames Tunnel project.
     
    PDF
    (44 pages)
    EIA Scoping Results - London Borough of Richmond upon Thames
    Environmental Impact Assessment Scoping Report to request Scoping Opinion from stakeholders for the Thames Tunnel project.
    PDF
    (26 pages)
    EIA Scoping Results - London Borough of Southwark
    Environmental Impact Assessment Scoping Report to request Scoping Opinion from stakeholders for the Thames Tunnel project.
     
    PDF
    (44 pages)
    EIA Scoping Results - London Borough of Tower Hamlets
    Environmental Impact Assessment Scoping Report to request Scoping Opinion from stakeholders for the Thames Tunnel project.
     
    PDF
    (43 pages)
    EIA Scoping Results - London Borough of Wandsworth
    Environmental Impact Assessment Scoping Report to request Scoping Opinion from stakeholders for the Thames Tunnel project.
     
    PDF
    (114 pages)
    EIA Scoping Results - Royal Borough of Kensington & Chelsea
    Environmental Impact Assessment Scoping Report to request Scoping Opinion from stakeholders for the Thames Tunnel project.
     
    PDF
    (46 pages)
    EIA Scoping Results Appendices - City of LondonAppendices to the Scoping Report broken down by Borough.  PDF
    (6 pages)
    EIA Scoping Results Appendices - City of WestminsterAppendices to the Scoping Report broken down by Borough.  PDF
    (6 pages)
    EIA Scoping Results Appendices - Cover and ContentsAppendices to the Scoping Report broken down by Borough.  PDF
    (7 pages)
    EIA Scoping Results Appendices - London Borough of EalingAppendices to the Scoping Report broken down by Borough.  PDF
    (7 pages)
    EIA Scoping Results Appendices - London Borough of GreenwichAppendices to the Scoping Report broken down by Borough.  PDF
    (12 pages)
    EIA Scoping Results Appendices - London Borough of Hammersmith & FulhamAppendices to the Scoping Report broken down by Borough.  PDF
    (6 pages)
    EIA Scoping Results Appendices - London Borough of HounslowAppendices to the Scoping Report broken down by Borough.  PDF
    (2 pages)
    EIA Scoping Results Appendices - London Borough of LambethAppendices to the Scoping Report broken down by Borough.  PDF
    (6 pages)
    EIA Scoping Results Appendices - London Borough of LewishamAppendices to the Scoping Report broken down by Borough.  PDF
    (6 pages)
    EIA Scoping Results Appendices - London Borough of NewhamAppendices to the Scoping Report broken down by Borough.  PDF
    (11 pages)
    EIA Scoping Results Appendices - London Borough of Richmond upon ThamesAppendices to the Scoping Report broken down by Borough.  PDF
    (6 pages)
    EIA Scoping Results Appendices - London Borough of SouthwarkAppendices to the Scoping Report broken down by Borough.  PDF
    (11 pages)
    EIA Scoping Results Appendices - London Borough of Tower HamletsAppendices to the Scoping Report broken down by Borough.  PDF
    (11 pages)
    EIA Scoping Results Appendices - London Borough of Wandsworth (Figures 13.1-13.6)Appendices to the Scoping Report broken down by Borough.  PDF
    (7 pages)
    EIA Scoping Results Appendices - London Borough of Wandsworth (Figures 13.12-13.21)Appendices to the Scoping Report broken down by Borough.  PDF
    (10 pages)
    EIA Scoping Results Appendices - London Borough of Wandsworth (Figures 13.22-13.31)Appendices to the Scoping Report broken down by Borough.  PDF
    (11 pages)
    EIA Scoping Results Appendices - London Borough of Wandsworth (Figures 13.7-13.11)Appendices to the Scoping Report broken down by Borough.  PDF
    (5 pages)
    EIA Scoping Results Appendices - Royal Borough of Kensington & ChelseaAppendices to the Scoping Report broken down by Borough.  PDF
    (11 pages)
    EIA Scoping Results Appendices - Site photographs, Draft CoCP, Abbreviations and GlossaryAppendices to the Scoping Report, Site photographs, draft code of construction practice, abbreviations and glossary.  PDF
    (69 pages)
    Part A - OverviewEnvironmental Impact Assessment Scoping Report to request Scoping Opinion from stakeholders for the Thames Tunnel project.PDF
    (160 pages)
  • 7. Phase two consultation (Nov 2011 - Feb 2012)
    View document Summary Download
    A guide to the Thames Tunnel compensation programmeA guide to the Thames Tunnel compensation programme, including compensation available now and during construction.PDF
    (4 pages)
    Abbey Mills Pumping Station - phase two site information paperSite information paper explaining our phase two consultation proposals for the site. The paper includes information on how the site was chosen, our potential use of the site, the proposed future use of the site and operational issues.PDF
    (28 pages)
    Abbey Mills Pumping Station display boardA visual board showing location plans, construction layouts, and post-construction visuals of the proposed site at Abbey Mills Pumping Station.PDF
    (1 pages)
    Acton Storm Tanks - phase two site information paperSite information paper explaining our phase two consultation proposals for the site. The paper includes information on how the site was chosen, our potential use of the site, the proposed future use of the site and operational issues.PDF
    (32 pages)
    Acton Storm Tanks display boardA visual board showing location plans, construction layouts, and post-construction visuals of the proposed site at Acton Storm Tanks.PDF
    (1 pages)
    Air management planAir management plan defines how air from the proposed Thames Tunnel project is vented into and out of the tunnel system and how air releases are controlled and treated. It outlines operational and management procedures for controlling air movement, and treatment of air to meet regulatory requirements and limit the extent of nuisance odours.PDF
    (49 pages)
    Albert Embankment Foreshore - phase two site information paperSite information paper explaining our phase two consultation proposals for the site. The paper includes information on how the site was chosen, our potential use of the site, the proposed future use of the site and operational issues.PDF
    (32 pages)
    Albert Embankment Foreshore display boardA visual board showing location plans, construction layouts, and post-construction visuals of the proposed site at Albert Embankment Foreshore.PDF
    (1 pages)
    Barn Elms - phase two site information paperSite information paper explaining our phase two consultation proposals for the site. The paper includes information on how the site was chosen, our potential use of the site, the proposed future use of the site and operational issues.PDF
    (32 pages)
    Barn Elms display boardA visual board showing location plans, construction layouts, and post-construction visuals of the proposed site at Barn Elms.PDF
    (1 pages)
    Beckton Sewage Treatment Works - phase two site information paperSite information paper explaining our phase two consultation proposals for the site. The paper includes information on how the site was chosen, our potential use of the site, the proposed future use of the site and operational issues.PDF
    (16 pages)
    Beckton Sewage Treatment Works display boardA visual board showing location plans, construction layouts, and post-construction visuals of the proposed site at Beckton Sewage Treatment Works.PDF
    (1 pages)
    Bekesbourne Street - phase two site information paperSite information paper explaining our phase two consultation proposals for the site. The paper includes information on how the site was chosen, our potential use of the site, the proposed future use of the site and operational issues.PDF
    (12 pages)
    Blackfriars Bridge Foreshore - phase two site information paperSite information paper explaining our phase two consultation proposals for the site. The paper includes information on how the site was chosen, our potential use of the site, the proposed future use of the site and operational issues.PDF
    (32 pages)
    Blackfriars Bridge Foreshore display boardA visual board showing location plans, construction layouts, and post-construction visuals of the proposed site at Blackfriars Bridge Foreshore.PDF
    (1 pages)
    Book of plans - Abbey Mills Pumping StationPlans depicting detailed aspects of potential sites including existing and proposed features along with elevations and sections.PDF
    (5 pages)
    Book of plans - Acton Storm TanksPlans depicting detailed aspects of potential sites including existing and proposed features along with elevations and sections.PDF
    (5 pages)
    Book of plans - Albert Embankment ForeshorePlans depicting detailed aspects of potential sites including existing and proposed features along with elevations and sections.PDF
    (6 pages)
    Book of plans - Barn ElmsPlans depicting detailed aspects of potential sites including existing and proposed features along with elevations and sections.PDF
    (5 pages)
    Book of plans - Beckton Sewage Treatment WorksPlans depicting detailed aspects of potential sites including existing and proposed features along with elevations and sections.PDF
    (4 pages)
    Book of plans - Blackfriars Bridge ForeshorePlans depicting detailed aspects of potential sites including existing and proposed features along with elevations and sections.PDF
    (7 pages)
    Book of plans - Carnwath Road RiversidePlans depicting detailed aspects of potential sites including existing and proposed features along with elevations and sections.PDF
    (5 pages)
    Book of plans - Chambers WharfPlans depicting detailed aspects of potential sites including existing and proposed features along with elevations and sections.PDF
    (5 pages)
    Book of plans - Chelsea Embankment ForeshorePlans depicting detailed aspects of potential sites including existing and proposed features along with elevations and sections.PDF
    (6 pages)
    Book of plans - Cremorne Wharf DepotPlans depicting detailed aspects of potential sites including existing and proposed features along with elevations and sections.PDF
    (5 pages)
    Book of plans - Deptford Church StreetPlans depicting detailed aspects of potential sites including existing and proposed features along with elevations and sections.PDF
    (5 pages)
    Book of plans - Dormay StreetPlans depicting detailed aspects of potential sites including existing and proposed features along with elevations and sections.PDF
    (5 pages)
    Book of plans - Earl Pumping StationPlans depicting detailed aspects of potential sites including existing and proposed features along with elevations and sections.PDF
    (5 pages)
    Book of plans - Falconbrook Pumping StationPlans depicting detailed aspects of potential sites including existing and proposed features along with elevations and sections.PDF
    (5 pages)
    Book of plans - Greenwich Pumping StationPlans depicting detailed aspects of potential sites including existing and proposed features along with elevations and sections.PDF
    (7 pages)
    Book of plans - Hammersmith Pumping StationPlans depicting detailed aspects of potential sites including existing and proposed features along with elevations and sections.PDF
    (5 pages)
    Book of plans - Heathwall Pumping StationPlans depicting detailed aspects of potential sites including existing and proposed features along with elevations and sections.PDF
    (5 pages)
    Book of plans - King Edward Memorial Park ForeshorePlans depicting detailed aspects of potential sites including existing and proposed features along with elevations and sections.PDF
    (5 pages)
    Book of plans - King George's ParkPlans depicting detailed aspects of potential sites including existing and proposed features along with elevations and sections.PDF
    (5 pages)
    Book of plans - Kirtling StreetPlans depicting detailed aspects of potential sites including existing and proposed features along with elevations and sections.PDF
    (5 pages)
    Book of plans - Putney Bridge ForeshorePlans depicting detailed aspects of potential sites including existing and proposed features along with elevations and sections.PDF
    (5 pages)
    Book of plans - Shad Thames Pumping StationPlans depicting detailed aspects of potential sites including existing and proposed features along with elevations and sections.PDF
    (5 pages)
    Book of plans - Victoria Embankment ForeshorePlans depicting detailed aspects of potential sites including existing and proposed features along with elevations and sections.PDF
    (6 pages)
    Build - How we will build the tunnelProject information paper explaining how the Thames Tunnel will be built.PDF
    (7 pages)
    Carnwath Road Riverside - phase two site information paperSite information paper explaining our phase two consultation proposals for the site. The paper includes information on how the site was chosen, our potential use of the site, the proposed future use of the site and operational issues.PDF
    (36 pages)
    Carnwath Road Riverside display boardA visual board showing location plans, construction layouts, and post-construction visuals of the proposed site at Carnwath Road Riverside.PDF
    (1 pages)
    Chambers Wharf - phase two site information paperSite information paper explaining our phase two consultation proposals for the site. The paper includes information on how the site was chosen, our potential use of the site, the proposed future use of the site and operational issues.PDF
    (36 pages)
    Chambers Wharf display boardA visual board showing location plans, construction layouts, and post-construction visuals of the proposed site at Chambers Wharf.PDF
    (1 pages)
    Changes - The changes since phase one consultationProject information paper explaining the changes that have been made to our proposals since phase one consultation.PDF
    (7 pages)
    Chelsea Embankment Foreshore - phase two site information paperSite information paper explaining our phase two consultation proposals for the site. The paper includes information on how the site was chosen, our potential use of the site, the proposed future use of the site and operational issues.PDF
    (32 pages)
    Chelsea Embankment Foreshore display boardA visual board showing location plans, construction layouts, and post-construction visuals of the proposed site at Chelsea Embankment Foreshore.PDF
    (1 pages)
    Code of Construction Practice - Part A: General requirementsThe Code of construction practice Part A: General requirements sets out a series of objectives and measures to be applied throughout the construction period.PDF
    (88 pages)
    Combined sewer overflow sites display boardA display board showing an illustrative representation of what a combined sewer overflow (CSO) site might look like.PDF
    (1 pages)
    Community consultation strategySets out our approach and timetable for consulting key stakeholders and those with an interest in the project.PDF
    (37 pages)
    Consultation - Our approach to consultationProject information paper explaining our approach to consultation on the Thames Tunnel.PDF
    (4 pages)
    Costs and Benefits of the Thames TunnelThis annex sets out more detail on the high-level calculations which have been performed by Defra to update the monetary costs and benefits of the Thames Tunnel first estimated in 2007. It is accompanied by a table breaking down the results of the analysis by cost and benefit category (see Table 1 at the end of the Annex).PDF
    (8 pages)
    Creating a River Thames fit for our futureThis document summarises the strategic and economic case for the Thames Tunnel and explains why Defra believes that a tunnel remains the preferred solution for dealing adequately with the untreated sewage that is polluting the River Thames. This provides an update to the 2007 regulatory impact assessment and takes into account data emerging since that time.PDF
    (18 pages)
    Cremorne Wharf Depot - phase two site information paperSite information paper explaining our phase two consultation proposals for the site. The paper includes information on how the site was chosen, our potential use of the site, the proposed future use of the site and operational issues.PDF
    (32 pages)
    Cremorne Wharf Depot display boardA visual board showing location plans, construction layouts, and post-construction visuals of the proposed site at Cremorne Wharf Depot.PDF
    (1 pages)
    Customer Overview LeafletOverview leaflet highlighting the need for the Thames Tunnel and the proposed solution. Leaflet includes a map of London showing the potential worksites and the route of the preferred tunnel alignment.PDF
    (4 pages)
    Deptford Church Street - phase two site information paperSite information paper explaining our phase two consultation proposals for the site. The paper includes information on how the site was chosen, our potential use of the site, the proposed future use of the site and operational issues.PDF
    (32 pages)
    Design - Our approach to designProject information paper explaining our approach to design for the above ground structures of the Thames Tunnel.PDF
    (4 pages)
    Design development report - Appendix A - Acton Storm TanksThe process behind the development of the proposed designs of the permanent above-ground elements of the Thames Tunnel project as well as how these new elements would be integrated into their surrounding environment. The above-ground elements include ventilation structures or columns, ventilation buildings, electrical and control kiosks and potential new public space, footpaths and landscaping.PDF
    (12 pages)
    Design development report - Appendix B - Hammersmith Pumping StationThe process behind the development of the proposed designs of the permanent above-ground elements of the Thames Tunnel project as well as how these new elements would be integrated into their surrounding environment. The above-ground elements include ventilation structures or columns, ventilation buildings, electrical and control kiosks and potential new public space, footpaths and landscaping.PDF
    (10 pages)
    Design development report - Appendix C - Barn ElmsThe process behind the development of the proposed designs of the permanent above-ground elements of the Thames Tunnel project as well as how these new elements would be integrated into their surrounding environment. The above-ground elements include ventilation structures or columns, ventilation buildings, electrical and control kiosks and potential new public space, footpaths and landscaping.PDF
    (12 pages)
    Design development report - Appendix D - Putney BridgeThe process behind the development of the proposed designs of the permanent above-ground elements of the Thames Tunnel project as well as how these new elements would be integrated into their surrounding environment. The above-ground elements include ventilation structures or columns, ventilation buildings, electrical and control kiosks and potential new public space, footpaths and landscaping.PDF
    (12 pages)
    Design development report - Appendix E - Dormay StreetThe process behind the development of the proposed designs of the permanent above-ground elements of the Thames Tunnel project as well as how these new elements would be integrated into their surrounding environment. The above-ground elements include ventilation structures or columns, ventilation buildings, electrical and control kiosks and potential new public space, footpaths and landscaping.PDF
    (10 pages)
    Design development report - Appendix F - King George's ParkThe process behind the development of the proposed designs of the permanent above-ground elements of the Thames Tunnel project as well as how these new elements would be integrated into their surrounding environment. The above-ground elements include ventilation structures or columns, ventilation buildings, electrical and control kiosks and potential new public space, footpaths and landscaping.PDF
    (12 pages)
    Design development report - Appendix G - Carnwath Road RiversideThe process behind the development of the proposed designs of the permanent above-ground elements of the Thames Tunnel project as well as how these new elements would be integrated into their surrounding environment. The above-ground elements include ventilation structures or columns, ventilation buildings, electrical and control kiosks and potential new public space, footpaths and landscaping.PDF
    (12 pages)
    Design development report - Appendix H - Falconbrook Pumping StationThe process behind the development of the proposed designs of the permanent above-ground elements of the Thames Tunnel project as well as how these new elements would be integrated into their surrounding environment. The above-ground elements include ventilation structures or columns, ventilation buildings, electrical and control kiosks and potential new public space, footpaths and landscaping.PDF
    (10 pages)
    Design development report - Appendix J - Cremorne Wharf DepotThe process behind the development of the proposed designs of the permanent above-ground elements of the Thames Tunnel project as well as how these new elements would be integrated into their surrounding environment. The above-ground elements include ventilation structures or columns, ventilation buildings, electrical and control kiosks and potential new public space, footpaths and landscaping.PDF
    (14 pages)
    Design development report - Appendix K - Chelsea Embankment ForeshoreThe process behind the development of the proposed designs of the permanent above-ground elements of the Thames Tunnel project as well as how these new elements would be integrated into their surrounding environment. The above-ground elements include ventilation structures or columns, ventilation buildings, electrical and control kiosks and potential new public space, footpaths and landscaping.PDF
    (20 pages)
    Design development report - Appendix L - Kirtling StreetThe process behind the development of the proposed designs of the permanent above-ground elements of the Thames Tunnel project as well as how these new elements would be integrated into their surrounding environment. The above-ground elements include ventilation structures or columns, ventilation buildings, electrical and control kiosks and potential new public space, footpaths and landscaping.PDF
    (10 pages)
    Design development report - Appendix M - Heathwall Pumping StationThe process behind the development of the proposed designs of the permanent above-ground elements of the Thames Tunnel project as well as how these new elements would be integrated into their surrounding environment. The above-ground elements include ventilation structures or columns, ventilation buildings, electrical and control kiosks and potential new public space, footpaths and landscaping.PDF
    (12 pages)
    Design development report - Appendix N - Albert Embankment ForeshoreThe process behind the development of the proposed designs of the permanent above-ground elements of the Thames Tunnel project as well as how these new elements would be integrated into their surrounding environment. The above-ground elements include ventilation structures or columns, ventilation buildings, electrical and control kiosks and potential new public space, footpaths and landscaping.PDF
    (16 pages)
    Design development report - Appendix P - Victoria Embankment ForeshoreThe process behind the development of the proposed designs of the permanent above-ground elements of the Thames Tunnel project as well as how these new elements would be integrated into their surrounding environment. The above-ground elements include ventilation structures or columns, ventilation buildings, electrical and control kiosks and potential new public space, footpaths and landscaping.PDF
    (18 pages)
    Design development report - Appendix Q - Blackfriars Bridge ForeshoreThe process behind the development of the proposed designs of the permanent above-ground elements of the Thames Tunnel project as well as how these new elements would be integrated into their surrounding environment. The above-ground elements include ventilation structures or columns, ventilation buildings, electrical and control kiosks and potential new public space, footpaths and landscaping.PDF
    (18 pages)
    Design development report - Appendix R - Chambers WharfThe process behind the development of the proposed designs of the permanent above-ground elements of the Thames Tunnel project as well as how these new elements would be integrated into their surrounding environment. The above-ground elements include ventilation structures or columns, ventilation buildings, electrical and control kiosks and potential new public space, footpaths and landscaping.PDF
    (10 pages)
    Design development report - Appendix S - King Edward Memorial Park ForeshoreThe process behind the development of the proposed designs of the permanent above-ground elements of the Thames Tunnel project as well as how these new elements would be integrated into their surrounding environment. The above-ground elements include ventilation structures or columns, ventilation buildings, electrical and control kiosks and potential new public space, footpaths and landscaping.PDF
    (16 pages)
    Design development report - Appendix T - Earl Pumping StationThe process behind the development of the proposed designs of the permanent above-ground elements of the Thames Tunnel project as well as how these new elements would be integrated into their surrounding environment. The above-ground elements include ventilation structures or columns, ventilation buildings, electrical and control kiosks and potential new public space, footpaths and landscaping.PDF
    (12 pages)
    Design development report - Appendix U - Deptford Church StreetThe process behind the development of the proposed designs of the permanent above-ground elements of the Thames Tunnel project as well as how these new elements would be integrated into their surrounding environment. The above-ground elements include ventilation structures or columns, ventilation buildings, electrical and control kiosks and potential new public space, footpaths and landscaping.PDF
    (12 pages)
    Design development report - Appendix V - Greenwich Pumping StationThe process behind the development of the proposed designs of the permanent above-ground elements of the Thames Tunnel project as well as how these new elements would be integrated into their surrounding environment. The above-ground elements include ventilation structures or columns, ventilation buildings, electrical and control kiosks and potential new public space, footpaths and landscaping.PDF
    (10 pages)
    Design development report - Appendix W - Abbey Mills Pumping StationThe process behind the development of the proposed designs of the permanent above-ground elements of the Thames Tunnel project as well as how these new elements would be integrated into their surrounding environment. The above-ground elements include ventilation structures or columns, ventilation buildings, electrical and control kiosks and potential new public space, footpaths and landscaping.PDF
    (10 pages)
    Design development report - Appendix X - Beckton Sewage Treatment WorksThe process behind the development of the proposed designs of the permanent above-ground elements of the Thames Tunnel project as well as how these new elements would be integrated into their surrounding environment. The above-ground elements include ventilation structures or columns, ventilation buildings, electrical and control kiosks and potential new public space, footpaths and landscaping.PDF
    (10 pages)
    Design development report - Appendix Y - Other worksThe process behind the development of the proposed designs of the permanent above-ground elements of the Thames Tunnel project as well as how these new elements would be integrated into their surrounding environment. The above-ground elements include ventilation structures or columns, ventilation buildings, electrical and control kiosks and potential new public space, footpaths and landscaping.PDF
    (7 pages)
    Design development report - main reportThe process behind the development of the proposed designs of the permanent above-ground elements of the Thames Tunnel project as well as how these new elements would be integrated into their surrounding environment. The above-ground elements include ventilation structures or columns, ventilation buildings, electrical and control kiosks and potential new public space, footpaths and landscaping.PDF
    (46 pages)
    Dormay Street - phase two site information paperSite information paper explaining our phase two consultation proposals for the site. The paper includes information on how the site was chosen, our potential use of the site, the proposed future use of the site and operational issues.PDF
    (32 pages)
    Dormay Street display boardA visual board showing location plans, construction layouts, and post-construction visuals of the proposed site at Dormay Street.PDF
    (1 pages)
    Draft waste strategyProvides information on how building materials and resulting waste, including excavated waste will be managed during construction of the Thames Tunnel.PDF
    (97 pages)
    Earl Pumping Station - phase two site information paperSite information paper explaining our phase two consultation proposals for the site. The paper includes information on how the site was chosen, our potential use of the site, the proposed future use of the site and operational issues.PDF
    (28 pages)
    Earl Pumping Station display boardA visual board showing location plans, construction layouts, and post-construction visuals of the proposed site at Earl Pumping Station.PDF
    (1 pages)
    EnvironmentThis paper explains the Environmental Impact Assessment (EIA) we are undertaking, to understand the environmental benefits and impacts the construction and operation of the Thames Tunnel project may have. It will also inform the project’s design.PDF
    (6 pages)
    Exhibition timetableTimetable of drop-in exhibitions for phase two consultation.PDF
    (1 pages)
    Falconbrook Pumping Station - phase two site information paperSite information paper explaining our phase two consultation proposals for the site. The paper includes information on how the site was chosen, our potential use of the site, the proposed future use of the site and operational issues.PDF
    (32 pages)
    Falconbrook Pumping Station display boardA visual board showing location plans, construction layouts, and post-construction visuals of the proposed site at Falconbrook Pumping Station.PDF
    (1 pages)
    Funding - How the project will be paid forProject information paper explaining how the construction and operation of the Thames Tunnel will be funded.PDF
    (2 pages)
    Funding display boardA display board outlining how the Thames Tunnel would be paid for and what the cost impact will be for Thames Water customers.PDF
    (1 pages)
    Greenwich Pumping Station - phase two site information paperSite information paper explaining our phase two consultation proposals for the site. The paper includes information on how the site was chosen, our potential use of the site, the proposed future use of the site and operational issues.PDF
    (32 pages)
    Guide to phase two consultationInformation guide explaining where to find information in the documents produced for phase two consultation on the Thames Tunnel.PDF
    (6 pages)
    Hammersmith & Fulham Tunnel News, January 2012The first issue of Tunnel News - a regular update about events, meetings and news for sites in the Hammersmith & Fulham area.PDF
    (2 pages)
    Hammersmith Pumping Station - phase two site information paperSite information paper explaining our phase two consultation proposals for the site. The paper includes information on how the site was chosen, our potential use of the site, the proposed future use of the site and operational issues.PDF
    (32 pages)
    Hammersmith Pumping Station display boardA visual board showing location plans, construction layouts, and post-construction visuals of the proposed site at Hammersmith Pumping Station.PDF
    (1 pages)
    Heathwall Pumping Station - phase two site information paperSite information paper explaining our phase two consultation proposals for the site. The paper includes information on how the site was chosen, our potential use of the site, the proposed future use of the site and operational issues.PDF
    (32 pages)
    Interim engagement reportThis report provides a summary of feedback received from members of the public and other stakeholders in response to the interim engagement events undertaken between 11 March 2011 and 16 August 2011.PDF
    (138 pages)
    Interim engagement report addendumAn addendum to our Interim engagement report (summer 2011), which has been produced to reflect additional feedback that we have received since we completed our interim engagement; and to report on the findings of further interim engagement for Kirtling Street.PDF
    (13 pages)
    Jews Row - phase two site information paperInformation paper explaining how we no longer need to use the Jews Row site.PDF
    (4 pages)
    Key PlanLondon wide map showing the preferred route of the tunnel and the locations of the phase preferred worksites at phase two consultation.PDF
    (1 pages)
    King Edward Memorial Park Foreshore - phase two site information paperSite information paper explaining our phase two consultation proposals for the site. The paper includes information on how the site was chosen, our potential use of the site, the proposed future use of the site and operational issues.PDF
    (36 pages)
    King Edward Memorial Park Foreshore display boardA visual board showing location plans, construction layouts, and post-construction visuals of the proposed site at King Edward Memorial Park Foreshore.PDF
    (1 pages)
    King George's Park - phase two site information paperSite information paper explaining our phase two consultation proposals for the site. The paper includes information on how the site was chosen, our potential use of the site, the proposed future use of the site and operational issues.PDF
    (28 pages)
    King George's Park display boardA visual board showing location plans, construction layouts, and post-construction visuals of the proposed site at King George's Park.PDF
    (1 pages)
    Kirtling Street - phase two site information paperSite information paper explaining our phase two consultation proposals for the site. The paper includes information on how the site was chosen, our potential use of the site, the proposed future use of the site and operational issues.PDF
    (32 pages)
    Kirtling Street display boardA visual board showing location plans, construction layouts, and post-construction visuals of the proposed site at Kirtling Street.PDF
    (1 pages)
    Main tunnel sites display boardA display board showing an illustrative representative of what our main tunnel sites might look like.PDF
    (1 pages)
    Managing constructionProject information paper explaining how we will manage the potential effects of construction activity.PDF
    (4 pages)
    Managing construction display boardA display board outlining how we will manage construction impacts if the Thames Tunnel is built.PDF
    (1 pages)
    Map - East LondonMap of East London showing preferred tunnel route, local CSOs, pumping stations and phase two consultation worksites. Please note this document is quite large in order to show the relevant level of detail. It may take a long time to download or view on a slow connection.PDF
    (1 pages)
    Map - West LondonMap of West London showing preferred tunnel route, local CSOs, pumping stations and phase two consultation worksites. Please note this document is quite large in order to show the relevant level of detail. It may take a long time to download or view on a slow connection.PDF
    (1 pages)
    Odour - How we will control odourProject information paper explaining how we intend to control odour.PDF
    (5 pages)
    Odour display boardA display board outlining our air management plan.PDF
    (1 pages)
    OptionsProject information paper explaining the other options that were considered to reduce sewage overflows from London's Victorian sewerage system into the River Thames.PDF
    (4 pages)
    Options display boardA display board outlining the options to deal with sewage overflows that we have considered.PDF
    (1 pages)
    Other Works - phase two site information paperSite information paper explaining our phase two consultation proposals other non site specific works.PDF
    (8 pages)
    OverflowInformation paper describing the problem of sewage overflows from London's Victorian sewerage systemPDF
    (2 pages)
    Overflow display boardA display board outlining why we need to deal with the problem of sewage overflows in the River Thames.PDF
    (1 pages)
    PEIR Figures Volume 01-06 Part 01Figures to accompany the Preliminary environmental information report.PDF
    (12 pages)
    PEIR Figures Volume 01-06 Part 02Figures to accompany the Preliminary environmental information report.PDF
    (14 pages)
    PEIR Figures Volume 01-06 Part 03Figures to accompany the Preliminary environmental information report.PDF
    (12 pages)
    PEIR Figures Volume 01-06 Part 04Figures to accompany the Preliminary environmental information report.PDF
    (11 pages)
    PEIR Figures Volume 01-06 Part 05Figures to accompany the Preliminary environmental information report.PDF
    (7 pages)
    PEIR Figures Volume 01-06 Part 06Figures to accompany the Preliminary environmental information report.PDF
    (6 pages)
    PEIR Figures Volume 07 - Acton Storm Tanks - Part 01Figures to accompany the Preliminary environmental information report.PDF
    (8 pages)
    PEIR Figures Volume 07 - Acton Storm Tanks - Part 02Figures to accompany the Preliminary environmental information report.PDF
    (26 pages)
    PEIR Figures Volume 08 - Hammersmith Pumping Station - Part 01Figures to accompany the Preliminary environmental information report.PDF
    (14 pages)
    PEIR Figures Volume 08 - Hammersmith Pumping Station - Part 02Figures to accompany the Preliminary environmental information report.PDF
    (18 pages)
    PEIR Figures Volume 09 - Barn Elms - Part 01Figures to accompany the Preliminary environmental information report.PDF
    (10 pages)
    PEIR Figures Volume 09 - Barn Elms - Part 02Figures to accompany the Preliminary environmental information report.PDF
    (24 pages)
    PEIR Figures Volume 10 - Putney Bridge Foreshore - Part 01Figures to accompany the Preliminary environmental information report.PDF
    (12 pages)
    PEIR Figures Volume 10 - Putney Bridge Foreshore - Part 02Figures to accompany the Preliminary environmental information report.PDF
    (25 pages)
    PEIR Figures Volume 11 - Dormay StreetFigures to accompany the Preliminary environmental information report.PDF
    (33 pages)
    PEIR Figures Volume 12 - King George's ParkFigures to accompany the Preliminary environmental information report.PDF
    (33 pages)
    PEIR Figures Volume 13 - Carnwath Road RiversideFigures to accompany the Preliminary environmental information report.PDF
    (32 pages)
    PEIR Figures Volume 14 - Falconbrook Pumping StationFigures to accompany the Preliminary environmental information report.PDF
    (30 pages)
    PEIR Figures Volume 15 - Cremorne Wharf Depot - Part 01Figures to accompany the Preliminary environmental information report.PDF
    (16 pages)
    PEIR Figures Volume 15 - Cremorne Wharf Depot - Part 02Figures to accompany the Preliminary environmental information report.PDF
    (15 pages)
    PEIR Figures Volume 16 - Chelsea Embankment Foreshore - Part 01Figures to accompany the Preliminary environmental information report.PDF
    (10 pages)
    PEIR Figures Volume 16 - Chelsea Embankment Foreshore - Part 02Figures to accompany the Preliminary environmental information report.PDF
    (27 pages)
    PEIR Figures Volume 17 - Kirtling Street - Part 01Figures to accompany the Preliminary environmental information report.PDF
    (16 pages)
    PEIR Figures Volume 17 - Kirtling Street - Part 02Figures to accompany the Preliminary environmental information report.PDF
    (17 pages)
    PEIR Figures Volume 18 - Heathwall Pumping StationFigures to accompany the Preliminary environmental information report.PDF
    (33 pages)
    PEIR Figures Volume 19 - Albert Embankment Foreshore - Part 01Figures to accompany the Preliminary environmental information report.PDF
    (10 pages)
    PEIR Figures Volume 19 - Albert Embankment Foreshore - Part 02Figures to accompany the Preliminary environmental information report.PDF
    (27 pages)
    PEIR Figures Volume 20 - Victoria Embankment Foreshore - Part 01Figures to accompany the Preliminary environmental information report.PDF
    (16 pages)
    PEIR Figures Volume 20 - Victoria Embankment Foreshore - Part 02Figures to accompany the Preliminary environmental information report.PDF
    (18 pages)
    PEIR Figures Volume 21 - Blackfriars Bridge Foreshore - Part 01Figures to accompany the Preliminary environmental information report.PDF
    (18 pages)
    PEIR Figures Volume 21 - Blackfriars Bridge Foreshore - Part 02Figures to accompany the Preliminary environmental information report.PDF
    (19 pages)
    PEIR Figures Volume 22 - Chambers WharfFigures to accompany the Preliminary environmental information report.PDF
    (34 pages)
    PEIR Figures Volume 23 - King Edward Memorial Park Foreshore - Part 01Figures to accompany the Preliminary environmental information report.PDF
    (10 pages)
    PEIR Figures Volume 23 - King Edward Memorial Park Foreshore - Part 02Figures to accompany the Preliminary environmental information report.PDF
    (22 pages)
    PEIR Figures Volume 24 - Earl Pumping StationFigures to accompany the Preliminary environmental information report.PDF
    (31 pages)
    PEIR Figures Volume 25 - Deptford Church StreetFigures to accompany the Preliminary environmental information report.PDF
    (32 pages)
    PEIR Figures Volume 26 - Greenwich Pumping StationFigures to accompany the Preliminary environmental information report.PDF
    (10 pages)
    PEIR Figures Volume 27 - Abbey Mills Pumping StationFigures to accompany the Preliminary environmental information report.PDF
    (31 pages)
    PEIR Figures Volume 28 - Beckton Sewage Treatment WorksFigures to accompany the Preliminary environmental information report.PDF
    (26 pages)
    PEIR Main report - Volume 01 - IntroductionPreliminary environmental information supporting phase two consultation. It provides a snap shot in time during the environmental impact assessment (EIA) process to facilitate effective consultation. It provides information on the anticipated development associated with the Thames Tunnel project, including construction sites, tunnel components, operational infrastructure and other ancillary work sites.PDF
    (48 pages)
    PEIR Main report - Volume 02 - Proposed developmentPreliminary environmental information supporting phase two consultation. It provides a snap shot in time during the environmental impact assessment (EIA) process to facilitate effective consultation. It provides information on the anticipated development associated with the Thames Tunnel project, including construction sites, tunnel components, operational infrastructure and other ancillary work sites.PDF
    (161 pages)
    PEIR Main report - Volume 03 - AlternativesPreliminary environmental information supporting phase two consultation. It provides a snap shot in time during the environmental impact assessment (EIA) process to facilitate effective consultation. It provides information on the anticipated development associated with the Thames Tunnel project, including construction sites, tunnel components, operational infrastructure and other ancillary work sites.PDF
    (79 pages)
    PEIR Main report - Volume 04 - Scoping opinions and technical engagementPreliminary environmental information supporting phase two consultation. It provides a snap shot in time during the environmental impact assessment (EIA) process to facilitate effective consultation. It provides information on the anticipated development associated with the Thames Tunnel project, including construction sites, tunnel components, operational infrastructure and other ancillary work sites.PDF
    (148 pages)
    PEIR Main report - Volume 05 - Assessment methodologyPreliminary environmental information supporting phase two consultation. It provides a snap shot in time during the environmental impact assessment (EIA) process to facilitate effective consultation. It provides information on the anticipated development associated with the Thames Tunnel project, including construction sites, tunnel components, operational infrastructure and other ancillary work sites.PDF
    (320 pages)
    PEIR Main report - Volume 05 - Assessment methodology (Appendix A)The Code of construction practice Part A: General requirements sets out a series of objectives and measures to be applied throughout the construction period.PDF
    (88 pages)
    PEIR Main report - Volume 06 - Project-wide assessmentPreliminary environmental information supporting phase two consultation. It provides a snap shot in time during the environmental impact assessment (EIA) process to facilitate effective consultation. It provides information on the anticipated development associated with the Thames Tunnel project, including construction sites, tunnel components, operational infrastructure and other ancillary work sites.PDF
    (267 pages)
    PEIR Main report - Volume 07 - Acton Storm TanksPreliminary environmental information supporting phase two consultation. It provides a snap shot in time during the environmental impact assessment (EIA) process to facilitate effective consultation. It provides information on the anticipated development associated with the Thames Tunnel project, including construction sites, tunnel components, operational infrastructure and other ancillary work sites.PDF
    (322 pages)
    PEIR Main report - Volume 08 - Hammersmith Pumping StationPreliminary environmental information supporting phase two consultation. It provides a snap shot in time during the environmental impact assessment (EIA) process to facilitate effective consultation. It provides information on the anticipated development associated with the Thames Tunnel project, including construction sites, tunnel components, operational infrastructure and other ancillary work sites.PDF
    (311 pages)
    PEIR Main report - Volume 09 - Barn ElmsPreliminary environmental information supporting phase two consultation. It provides a snap shot in time during the environmental impact assessment (EIA) process to facilitate effective consultation. It provides information on the anticipated development associated with the Thames Tunnel project, including construction sites, tunnel components, operational infrastructure and other ancillary work sites.PDF
    (354 pages)
    PEIR Main report - Volume 10 - Putney Bridge ForeshorePreliminary environmental information supporting phase two consultation. It provides a snap shot in time during the environmental impact assessment (EIA) process to facilitate effective consultation. It provides information on the anticipated development associated with the Thames Tunnel project, including construction sites, tunnel components, operational infrastructure and other ancillary work sites.PDF
    (407 pages)
    PEIR Main report - Volume 11 - Dormay StreetPreliminary environmental information supporting phase two consultation. It provides a snap shot in time during the environmental impact assessment (EIA) process to facilitate effective consultation. It provides information on the anticipated development associated with the Thames Tunnel project, including construction sites, tunnel components, operational infrastructure and other ancillary work sites.PDF
    (325 pages)
    PEIR Main report - Volume 12 - King George's ParkPreliminary environmental information supporting phase two consultation. It provides a snap shot in time during the environmental impact assessment (EIA) process to facilitate effective consultation. It provides information on the anticipated development associated with the Thames Tunnel project, including construction sites, tunnel components, operational infrastructure and other ancillary work sites.PDF
    (323 pages)
    PEIR Main report - Volume 13 - Carnwath Road RiversidePreliminary environmental information supporting phase two consultation. It provides a snap shot in time during the environmental impact assessment (EIA) process to facilitate effective consultation. It provides information on the anticipated development associated with the Thames Tunnel project, including construction sites, tunnel components, operational infrastructure and other ancillary work sites.PDF
    (355 pages)
    PEIR Main report - Volume 14 - Falconbrook Pumping StationPreliminary environmental information supporting phase two consultation. It provides a snap shot in time during the environmental impact assessment (EIA) process to facilitate effective consultation. It provides information on the anticipated development associated with the Thames Tunnel project, including construction sites, tunnel components, operational infrastructure and other ancillary work sites.PDF
    (314 pages)
    PEIR Main report - Volume 15 - Cremorne Wharf DepotPreliminary environmental information supporting phase two consultation. It provides a snap shot in time during the environmental impact assessment (EIA) process to facilitate effective consultation. It provides information on the anticipated development associated with the Thames Tunnel project, including construction sites, tunnel components, operational infrastructure and other ancillary work sites.PDF
    (346 pages)
    PEIR Main report - Volume 16 - Chelsea Embankment ForeshorePreliminary environmental information supporting phase two consultation. It provides a snap shot in time during the environmental impact assessment (EIA) process to facilitate effective consultation. It provides information on the anticipated development associated with the Thames Tunnel project, including construction sites, tunnel components, operational infrastructure and other ancillary work sites.PDF
    (378 pages)
    PEIR Main report - Volume 17 - Kirtling StreetPreliminary environmental information supporting phase two consultation. It provides a snap shot in time during the environmental impact assessment (EIA) process to facilitate effective consultation. It provides information on the anticipated development associated with the Thames Tunnel project, including construction sites, tunnel components, operational infrastructure and other ancillary work sites.PDF
    (385 pages)
    PEIR Main report - Volume 18 - Heathwall Pumping StationPreliminary environmental information supporting phase two consultation. It provides a snap shot in time during the environmental impact assessment (EIA) process to facilitate effective consultation. It provides information on the anticipated development associated with the Thames Tunnel project, including construction sites, tunnel components, operational infrastructure and other ancillary work sites.PDF
    (375 pages)
    PEIR Main report - Volume 19 - Albert Embankment ForeshorePreliminary environmental information supporting phase two consultation. It provides a snap shot in time during the environmental impact assessment (EIA) process to facilitate effective consultation. It provides information on the anticipated development associated with the Thames Tunnel project, including construction sites, tunnel components, operational infrastructure and other ancillary work sites.PDF
    (395 pages)
    PEIR Main report - Volume 20 - Victoria Embankment ForeshorePreliminary environmental information supporting phase two consultation. It provides a snap shot in time during the environmental impact assessment (EIA) process to facilitate effective consultation. It provides information on the anticipated development associated with the Thames Tunnel project, including construction sites, tunnel components, operational infrastructure and other ancillary work sites.PDF
    (399 pages)
    PEIR Main report - Volume 21 - Blackfriars Bridge ForeshorePreliminary environmental information supporting phase two consultation. It provides a snap shot in time during the environmental impact assessment (EIA) process to facilitate effective consultation. It provides information on the anticipated development associated with the Thames Tunnel project, including construction sites, tunnel components, operational infrastructure and other ancillary work sites.PDF
    (413 pages)
    PEIR Main report - Volume 22 - Chambers WharfPreliminary environmental information supporting phase two consultation. It provides a snap shot in time during the environmental impact assessment (EIA) process to facilitate effective consultation. It provides information on the anticipated development associated with the Thames Tunnel project, including construction sites, tunnel components, operational infrastructure and other ancillary work sites.PDF
    (353 pages)
    PEIR Main report - Volume 23 - King Edward Memorial Park ForeshorePreliminary environmental information supporting phase two consultation. It provides a snap shot in time during the environmental impact assessment (EIA) process to facilitate effective consultation. It provides information on the anticipated development associated with the Thames Tunnel project, including construction sites, tunnel components, operational infrastructure and other ancillary work sites.PDF
    (402 pages)
    PEIR Main report - Volume 24 - Earl Pumping StationPreliminary environmental information supporting phase two consultation. It provides a snap shot in time during the environmental impact assessment (EIA) process to facilitate effective consultation. It provides information on the anticipated development associated with the Thames Tunnel project, including construction sites, tunnel components, operational infrastructure and other ancillary work sites.PDF
    (307 pages)
    PEIR Main report - Volume 25 - Deptford Church StreetPreliminary environmental information supporting phase two consultation. It provides a snap shot in time during the environmental impact assessment (EIA) process to facilitate effective consultation. It provides information on the anticipated development associated with the Thames Tunnel project, including construction sites, tunnel components, operational infrastructure and other ancillary work sites.PDF
    (326 pages)
    PEIR Main report - Volume 26 - Greenwich Pumping StationPreliminary environmental information supporting phase two consultation. It provides a snap shot in time during the environmental impact assessment (EIA) process to facilitate effective consultation. It provides information on the anticipated development associated with the Thames Tunnel project, including construction sites, tunnel components, operational infrastructure and other ancillary work sites.PDF
    (347 pages)
    PEIR Main report - Volume 27 - Abbey Mills Pumping StationPreliminary environmental information supporting phase two consultation. It provides a snap shot in time during the environmental impact assessment (EIA) process to facilitate effective consultation. It provides information on the anticipated development associated with the Thames Tunnel project, including construction sites, tunnel components, operational infrastructure and other ancillary work sites.PDF
    (291 pages)
    PEIR Main report - Volume 28 - Beckton Sewage Treatment WorksPreliminary environmental information supporting phase two consultation. It provides a snap shot in time during the environmental impact assessment (EIA) process to facilitate effective consultation. It provides information on the anticipated development associated with the Thames Tunnel project, including construction sites, tunnel components, operational infrastructure and other ancillary work sites.PDF
    (230 pages)
    PEIR Non-technical summary - Section 01-05Non-technical summary of the preliminary environmental information, which supports phase two consultation. It provides a snap shot in time during the environmental impact assessment (EIA) process to facilitate effective consultation.PDF
    (37 pages)
    PEIR Non-technical summary - Section 01-05 (Figure 28.1)Non-technical summary of the preliminary environmental information, which supports phase two consultation. It provides a snap shot in time during the environmental impact assessment (EIA) process to facilitate effective consultation.PDF
    (3 pages)
    PEIR Non-technical summary - Section 06 - Acton Storm TanksNon-technical summary of the preliminary environmental information, which supports phase two consultation. It provides a snap shot in time during the environmental impact assessment (EIA) process to facilitate effective consultation.PDF
    (14 pages)
    PEIR Non-technical summary - Section 07 - Hammersmith Pumping StationNon-technical summary of the preliminary environmental information, which supports phase two consultation. It provides a snap shot in time during the environmental impact assessment (EIA) process to facilitate effective consultation.PDF
    (14 pages)
    PEIR Non-technical summary - Section 08 - Barn ElmsNon-technical summary of the preliminary environmental information, which supports phase two consultation. It provides a snap shot in time during the environmental impact assessment (EIA) process to facilitate effective consultation.PDF
    (14 pages)
    PEIR Non-technical summary - Section 09 - Putney Bridge ForeshoreNon-technical summary of the preliminary environmental information, which supports phase two consultation. It provides a snap shot in time during the environmental impact assessment (EIA) process to facilitate effective consultation.PDF
    (16 pages)
    PEIR Non-technical summary - Section 10 - Dormay StreetNon-technical summary of the preliminary environmental information, which supports phase two consultation. It provides a snap shot in time during the environmental impact assessment (EIA) process to facilitate effective consultation.PDF
    (14 pages)
    PEIR Non-technical summary - Section 11 - King George's ParkNon-technical summary of the preliminary environmental information, which supports phase two consultation. It provides a snap shot in time during the environmental impact assessment (EIA) process to facilitate effective consultation.PDF
    (14 pages)
    PEIR Non-technical summary - Section 12 - Carnwath Road RiversideNon-technical summary of the preliminary environmental information, which supports phase two consultation. It provides a snap shot in time during the environmental impact assessment (EIA) process to facilitate effective consultation.PDF
    (15 pages)
    PEIR Non-technical summary - Section 13 - Falconbrook Pumping StationNon-technical summary of the preliminary environmental information, which supports phase two consultation. It provides a snap shot in time during the environmental impact assessment (EIA) process to facilitate effective consultation.PDF
    (13 pages)
    PEIR Non-technical summary - Section 14 - Cremorne Wharf DepotNon-technical summary of the preliminary environmental information, which supports phase two consultation. It provides a snap shot in time during the environmental impact assessment (EIA) process to facilitate effective consultation.PDF
    (13 pages)
    PEIR Non-technical summary - Section 15 - Chelsea Embankment ForeshoreNon-technical summary of the preliminary environmental information, which supports phase two consultation. It provides a snap shot in time during the environmental impact assessment (EIA) process to facilitate effective consultation.PDF
    (14 pages)
    PEIR Non-technical summary - Section 16 - Kirtling StreetNon-technical summary of the preliminary environmental information, which supports phase two consultation. It provides a snap shot in time during the environmental impact assessment (EIA) process to facilitate effective consultation.PDF
    (14 pages)
    PEIR Non-technical summary - Section 17 - Heathwall Pumping StationNon-technical summary of the preliminary environmental information, which supports phase two consultation. It provides a snap shot in time during the environmental impact assessment (EIA) process to facilitate effective consultation.PDF
    (14 pages)
    PEIR Non-technical summary - Section 18 - Albert Embankment ForeshoreNon-technical summary of the preliminary environmental information, which supports phase two consultation. It provides a snap shot in time during the environmental impact assessment (EIA) process to facilitate effective consultation.PDF
    (17 pages)
    PEIR Non-technical summary - Section 19 - Victoria Embankment ForeshoreNon-technical summary of the preliminary environmental information, which supports phase two consultation. It provides a snap shot in time during the environmental impact assessment (EIA) process to facilitate effective consultation.PDF
    (14 pages)
    PEIR Non-technical summary - Section 20 - Blackfriars Bridge ForeshoreNon-technical summary of the preliminary environmental information, which supports phase two consultation. It provides a snap shot in time during the environmental impact assessment (EIA) process to facilitate effective consultation.PDF
    (15 pages)
    PEIR Non-technical summary - Section 21 - Chambers WharfNon-technical summary of the preliminary environmental information, which supports phase two consultation. It provides a snap shot in time during the environmental impact assessment (EIA) process to facilitate effective consultation.PDF
    (14 pages)
    PEIR Non-technical summary - Section 22 - King Edward Memorial Park ForeshoreNon-technical summary of the preliminary environmental information, which supports phase two consultation. It provides a snap shot in time during the environmental impact assessment (EIA) process to facilitate effective consultation.PDF
    (14 pages)
    PEIR Non-technical summary - Section 23 - Earl Pumping StationNon-technical summary of the preliminary environmental information, which supports phase two consultation. It provides a snap shot in time during the environmental impact assessment (EIA) process to facilitate effective consultation.PDF
    (12 pages)
    PEIR Non-technical summary - Section 24 - Deptford Church StreetNon-technical summary of the preliminary environmental information, which supports phase two consultation. It provides a snap shot in time during the environmental impact assessment (EIA) process to facilitate effective consultation.PDF
    (13 pages)
    PEIR Non-technical summary - Section 25 - Greenwich Pumping StationNon-technical summary of the preliminary environmental information, which supports phase two consultation. It provides a snap shot in time during the environmental impact assessment (EIA) process to facilitate effective consultation.PDF
    (14 pages)
    PEIR Non-technical summary - Section 26 - Abbey Mills Pumping StationNon-technical summary of the preliminary environmental information, which supports phase two consultation. It provides a snap shot in time during the environmental impact assessment (EIA) process to facilitate effective consultation.PDF
    (13 pages)
    PEIR Non-technical summary - Section 27 - Beckton Sewage Treatment WorksNon-technical summary of the preliminary environmental information, which supports phase two consultation. It provides a snap shot in time during the environmental impact assessment (EIA) process to facilitate effective consultation.PDF
    (11 pages)
    Phase two preferred scheme display boardA display board showing a map of our phase two preferred tunnel route and worksites.PDF
    (1 pages)
    Phase two scheme development reportThis report sets out the work we have undertaken since phase one consultation. It describes how the scheme has evolved in the intervening period and how we have used the responses we received from the phase one consultation, alongside ongoing engineering scheme design work and information on changes in circumstances, to update the proposals that we are publicising during our phase two consultation period.PDF
    (100 pages)
    Phase two scheme development report - Appendix A - Acton Storm TanksThis report sets out the work we have undertaken since phase one consultation. It describes how the scheme has evolved in the intervening period and how we have used the responses we received from the phase one consultation, alongside ongoing engineering scheme design work and information on changes in circumstances, to update the proposals that we are publicising during our phase two consultation period.PDF
    (24 pages)
    Phase two scheme development report - Appendix B - Hammersmith Pumping StationThis report sets out the work we have undertaken since phase one consultation. It describes how the scheme has evolved in the intervening period and how we have used the responses we received from the phase one consultation, alongside ongoing engineering scheme design work and information on changes in circumstances, to update the proposals that we are publicising during our phase two consultation period.PDF
    (22 pages)
    Phase two scheme development report - Appendix C - Barn ElmsThis report sets out the work we have undertaken since phase one consultation. It describes how the scheme has evolved in the intervening period and how we have used the responses we received from the phase one consultation, alongside ongoing engineering scheme design work and information on changes in circumstances, to update the proposals that we are publicising during our phase two consultation period.PDF
    (18 pages)
    Phase two scheme development report - Appendix D - Putney BridgeThis report sets out the work we have undertaken since phase one consultation. It describes how the scheme has evolved in the intervening period and how we have used the responses we received from the phase one consultation, alongside ongoing engineering scheme design work and information on changes in circumstances, to update the proposals that we are publicising during our phase two consultation period.PDF
    (14 pages)
    Phase two scheme development report - Appendix E - Dormay StreetThis report sets out the work we have undertaken since phase one consultation. It describes how the scheme has evolved in the intervening period and how we have used the responses we received from the phase one consultation, alongside ongoing engineering scheme design work and information on changes in circumstances, to update the proposals that we are publicising during our phase two consultation period.PDF
    (18 pages)
    Phase two scheme development report - Appendix F - King George's ParkThis report sets out the work we have undertaken since phase one consultation. It describes how the scheme has evolved in the intervening period and how we have used the responses we received from the phase one consultation, alongside ongoing engineering scheme design work and information on changes in circumstances, to update the proposals that we are publicising during our phase two consultation period.PDF
    (12 pages)
    Phase two scheme development report - Appendix G - Carnwath Road RiversideThis report sets out the work we have undertaken since phase one consultation. It describes how the scheme has evolved in the intervening period and how we have used the responses we received from the phase one consultation, alongside ongoing engineering scheme design work and information on changes in circumstances, to update the proposals that we are publicising during our phase two consultation period.PDF
    (30 pages)
    Phase two scheme development report - Appendix H - Falconbrook Pumping StationThis report sets out the work we have undertaken since phase one consultation. It describes how the scheme has evolved in the intervening period and how we have used the responses we received from the phase one consultation, alongside ongoing engineering scheme design work and information on changes in circumstances, to update the proposals that we are publicising during our phase two consultation period.PDF
    (18 pages)
    Phase two scheme development report - Appendix J - Cremorne Wharf DepotThis report sets out the work we have undertaken since phase one consultation. It describes how the scheme has evolved in the intervening period and how we have used the responses we received from the phase one consultation, alongside ongoing engineering scheme design work and information on changes in circumstances, to update the proposals that we are publicising during our phase two consultation period.PDF
    (14 pages)
    Phase two scheme development report - Appendix K - Chelsea Embankment ForeshoreThis report sets out the work we have undertaken since phase one consultation. It describes how the scheme has evolved in the intervening period and how we have used the responses we received from the phase one consultation, alongside ongoing engineering scheme design work and information on changes in circumstances, to update the proposals that we are publicising during our phase two consultation period.PDF
    (18 pages)
    Phase two scheme development report - Appendix L - Kirtling StreetThis report sets out the work we have undertaken since phase one consultation. It describes how the scheme has evolved in the intervening period and how we have used the responses we received from the phase one consultation, alongside ongoing engineering scheme design work and information on changes in circumstances, to update the proposals that we are publicising during our phase two consultation period.PDF
    (42 pages)
    Phase two scheme development report - Appendix M - Heathwall Pumping StationThis report sets out the work we have undertaken since phase one consultation. It describes how the scheme has evolved in the intervening period and how we have used the responses we received from the phase one consultation, alongside ongoing engineering scheme design work and information on changes in circumstances, to update the proposals that we are publicising during our phase two consultation period.PDF
    (18 pages)
    Phase two scheme development report - Appendix N - Albert Embankment ForeshoreThis report sets out the work we have undertaken since phase one consultation. It describes how the scheme has evolved in the intervening period and how we have used the responses we received from the phase one consultation, alongside ongoing engineering scheme design work and information on changes in circumstances, to update the proposals that we are publicising during our phase two consultation period.PDF
    (18 pages)
    Phase two scheme development report - Appendix P - Victoria Embankment ForeshoreThis report sets out the work we have undertaken since phase one consultation. It describes how the scheme has evolved in the intervening period and how we have used the responses we received from the phase one consultation, alongside ongoing engineering scheme design work and information on changes in circumstances, to update the proposals that we are publicising during our phase two consultation period.PDF
    (12 pages)
    Phase two scheme development report - Appendix Q - Blackfriars Bridge ForeshoreThis report sets out the work we have undertaken since phase one consultation. It describes how the scheme has evolved in the intervening period and how we have used the responses we received from the phase one consultation, alongside ongoing engineering scheme design work and information on changes in circumstances, to update the proposals that we are publicising during our phase two consultation period.PDF
    (10 pages)
    Phase two scheme development report - Appendix R - Chambers WharfThis report sets out the work we have undertaken since phase one consultation. It describes how the scheme has evolved in the intervening period and how we have used the responses we received from the phase one consultation, alongside ongoing engineering scheme design work and information on changes in circumstances, to update the proposals that we are publicising during our phase two consultation period.PDF
    (28 pages)
    Phase two scheme development report - Appendix S - King Edward Memorial Park ForeshoreThis report sets out the work we have undertaken since phase one consultation. It describes how the scheme has evolved in the intervening period and how we have used the responses we received from the phase one consultation, alongside ongoing engineering scheme design work and information on changes in circumstances, to update the proposals that we are publicising during our phase two consultation period.PDF
    (28 pages)
    Phase two scheme development report - Appendix T - Earl Pumping StationThis report sets out the work we have undertaken since phase one consultation. It describes how the scheme has evolved in the intervening period and how we have used the responses we received from the phase one consultation, alongside ongoing engineering scheme design work and information on changes in circumstances, to update the proposals that we are publicising during our phase two consultation period.PDF
    (18 pages)
    Phase two scheme development report - Appendix U - Deptford Church StreetThis report sets out the work we have undertaken since phase one consultation. It describes how the scheme has evolved in the intervening period and how we have used the responses we received from the phase one consultation, alongside ongoing engineering scheme design work and information on changes in circumstances, to update the proposals that we are publicising during our phase two consultation period.PDF
    (26 pages)
    Phase two scheme development report - Appendix V - Greenwich Pumping StationThis report sets out the work we have undertaken since phase one consultation. It describes how the scheme has evolved in the intervening period and how we have used the responses we received from the phase one consultation, alongside ongoing engineering scheme design work and information on changes in circumstances, to update the proposals that we are publicising during our phase two consultation period.PDF
    (26 pages)
    Phase two scheme development report - Appendix W - Abbey Mills Pumping StationThis report sets out the work we have undertaken since phase one consultation. It describes how the scheme has evolved in the intervening period and how we have used the responses we received from the phase one consultation, alongside ongoing engineering scheme design work and information on changes in circumstances, to update the proposals that we are publicising during our phase two consultation period.PDF
    (13 pages)
    Putney Bridge Foreshore - phase two site information paperSite information paper explaining our phase two consultation proposals for the site. The paper includes information on how the site was chosen, our potential use of the site, the proposed future use of the site and operational issues.PDF
    (32 pages)
    Regulatory frameworkProject information paper explaining the regulatory framework surrounding the Thames Tunnel project.PDF
    (2 pages)
    Route and tunnel alignmentProject information paper explaining the route the tunnel will follow and its alignment.PDF
    (4 pages)
    Route to consent - How we will get permission to build the projectProject information paper explaining how we will get permission to construct and operate the Thames Tunnel.PDF
    (4 pages)
    Route to consent display boardA display board outlining the process we are following to seek permission to build the tunnel.PDF
    (1 pages)
    Settlement - Limiting ground movementProject information paper explaining the potential effects of tunnel construction on the ground above.PDF
    (2 pages)
    Shad Thames Pumping Station - phase two site information paperSite information paper explaining our phase two consultation proposals for the site. The paper includes information on how the site was chosen, our potential use of the site, the proposed future use of the site and operational issues.PDF
    (16 pages)
    Shad Thames Pumping Station display boardA visual board showing location plans, construction layouts, and post-construction visuals of the proposed site at Shad Thames Pumping Station.PDF
    (1 pages)
    Site selection - How we chose our sitesProject information paper explaining the process of selecting potential sites for the construction and operation of the Thames Tunnel.PDF
    (4 pages)
    Site selection background technical paperAn update to the Spring 2010 issue that was part of phase one consultation, this Site selection background technical paper provides information for the site selection team about the background and the engineering requirements of the Thames Tunnel project.PDF
    (50 pages)
    Site selection methodology paperAn update to the Spring 2010 issue that was part of phase one consultation, this paper summarises the background to the project and details the methodology used to select construction sites along the route of the Thames Tunnel.PDF
    (43 pages)
    Southwark Tunnel News, January 2012The first issue of Tunnel News - a regular update about events, meetings and news for sites in the Southwark area.PDF
    (2 pages)
    Statement of community consultationOur statement on who we will consult, how we will consult and what we will consult stakeholders on regarding the Thames Tunnel, revised for phase two consultationPDF
    (1 pages)
    Thames Water's initial response to the Selborne ReportThames Water's initial response to the Selborne Report.PDF
    (5 pages)
    Timing - Proposed timescales for the projectProject information paper explaining the proposed timescales for the construction of the Thames Tunnel.PDF
    (2 pages)
    Timing display boardA display board outlining when we expect to reach project milestones.PDF
    (1 pages)
    Tower Hamlets Tunnel News, January 2012The first issue of Tunnel News - a regular update about events, meetings and news for sites in the Tower Hamlets area.  PDF
    (2 pages)
    Transport - How we will transport construction materialsProject information paper explaining how we will transport construction materials to and from our sites.PDF
    (6 pages)
    Transport display boardA display board outlining our proposed transport strategy.PDF
    (1 pages)
    Tunnelling under London display boardA display board outlining how we have choosen our preferred route.PDF
    (1 pages)
    Victoria Embankment Foreshore - phase two site information paperSite information paper explaining our phase two consultation proposals for the site. The paper includes information on how the site was chosen, our potential use of the site, the proposed future use of the site and operational issues.PDF
    (28 pages)
    Victoria Embankment Foreshore display boardA visual board showing location plans, construction layouts, and post-construction visuals of the proposed site at Victoria Embankment Foreshore.PDF
    (1 pages)
    Written Ministerial StatementMinisterial Statement from Parliamentary Under-Secretary for Natural Environment and Fisheries (Richard Benyon) reaffirming the Government’s support for Thames Tunnel and the progress made since the last announcement on 7 September 2010.PDF
    (3 pages)
  • Home
  • What we’re doing
  • News
  • Document library
  • Questions
  • My site
  • Feedback form
  • Sitemap
  • Home

    • What we're doing

      • Our plan
      • The need to clean up the Thames
      • Our proposed solution
      • Changes since phase one consultation
      • How we will build the tunnel
      • Timetable
    • News

      • Alice in 'Sewerland'
      • End of phase two consultation
      • Riverside pupils present petition
      • Pupils present park petition
      • Ten days left to have your say
      • Document library

        • Timeline of documents
        • Documents by category
      • Questions

        • Your general questions about the project
        • My site

          • Feedback form

            Thames Tunnel: Creating a cleaner, healthier River Thames.

            Registered office: Thames Water Utilities Limited, Clearwater Court, Vastern Road, Reading, Berkshire RG1 8DB
            Company number: 2366661 Registered in England and Wales

            • Contact us
            • Privacy
            • Disclaimer
            • Language
            • Extra care

            View site in high contrast

            www.thameswater.co.uk