| View document | Summary | Download |
|---|---|---|
| Cost Benefit Working Group Report | Identify and evaluate the costs and benefits associated with the Tideway Solutions developed by the Solutions Working Group, and then to present a relative cost-benefit assessment of the different options. | PDF (25 pages) |
| Cost Benefit Working Group Report | An assessment of the costs and benefits of the options under consideration. | PDF (25 pages) |
| Executive summary | Study investigating the environmental impact of wet weather discharges from 57 CSOs through London and identifying different options for solutions. | PDF (8 pages) |
| Jacobs Babtie Independent Review | Independent Review to assess whether there are economic partial solutions to problems caused by sewage overflowing to the River Thames when it rains. | PDF (79 pages) |
| Objectives and Compliance Working Group - Report 1 | Report of the objectives and compliance working group . | PDF (26 pages) |
| Objectives and Compliance Working Group - Report 2 | Second volume of the report of the objectives and compliance working group. | PDF (43 pages) |
| Planning and Environment Working Group Report | Report of the Planning and Environment Working Group | PDF (93 pages) |
| Solutions Working Group - Report 1 | Working group report on tunnels and shafts. | PDF (90 pages) |
| Solutions Working Group - Report 2 | Solutions working group report on treatment. | PDF (28 pages) |
| Steering Group Report | Final report of the steering group. | PDF (55 pages) |
| Summary Report | Option development report for the Thames Tideway Tunnel and Sewage Treatment Works upgrades. | PDF (57 pages) |
| Supplementary Report | Further investigation of the proposed long-term tunnel solution and of alternative measures including temporary or interim works and some smaller scale tunnel and/or treatment options to deal with the discharge of storm water from Combined Sewer Overflows (CSOs) into the Thames Tideway. | PDF (12 pages) |
| Volume 1 - Objectives Working Group Report | Report to establish a series of objectives to meet the broad aspirational aim. | PDF (24 pages) |
| Volume 1 - Solutions Working Group Report | Contribution of the Solution Group to the strategic investigation of the Tideway Combined Sewer Overflow (CSO) discharges. | PDF (188 pages) |
| Volume 2 - Objectives Working Group Modelling Study | Modelling study to assess the proposed solutions developed by the Solutions Group against the objectives for dissolved oxygen in the Tideway. | PDF (26 pages) |
| Volume 2 - Solutions Working Group Refinement Report | The refinement of the scope of the storage tunnel option including re-evaluation of the cost estimates and risk assessment. | PDF (46 pages) |
| View document | Summary | Download |
|---|---|---|
| Background Technical Paper | Technical paper providing information about the background and the engineering requirements of the Thames Tunnel Project. This paper includes engineering requirements that had a bearing on site selection process, including design developments during course of site selection. | PDF (39 pages) |
| Site Selection Methodology Paper | This paper summarises the background to the project and details the methodology used to select construction sites along the route of the Thames Tunnel. | PDF (32 pages) |
| View document | Summary | Download |
|---|---|---|
| Needs Report | Paper considering the need for the Thames Tunnel taking into account the Lee Tunnel and other London Tideway Improvements, namely the sewage treatment works upgrades. | PDF (91 pages) |
| Needs Report – Appendix A | Appendices to the Needs Report containing Ministerial Correspondence and Regulatory Impact Assessment. | PDF (75 pages) |
| Needs Report – Appendix B | Appendices to the Needs Report containing Report on Approaches to the Urban Waste Water Treatment Directive and Compliance in Relation to CSOs in major cities across the EU. | PDF (76 pages) |
| Needs Report – Appendix C | Appendices to the Needs Report containing London population statistics. | PDF (5 pages) |
| Needs Report – Appendix D | Appendices to the Needs Report containing final Sewer Separation Feasibility Study and total Sewer Separation costs. | PDF (147 pages) |
| Needs Report – Appendix E | Appendices to the Needs Report containing information on Potential Source Control, SUDS Applications and SUDS Evaluation for Example Areas. | PDF (235 pages) |
| Needs Report – Appendix F | Appendices to the Needs Report containing Tideway Fisheries Review. | PDF (60 pages) |
| View document | Summary | Download |
|---|---|---|
| Abbey Mills Pumping Station - phase one site information paper | Site specific information paper about the shortlisted sites and preferred option for a worksite in the Abbey Mills area to be used to construct the main tunnel of the project. Paper describes use of preferred site during construction and permanent use after construction is finished. | PDF (4 pages) |
| Acton Storm Tanks - phase one site information paper | Site specific information paper about the shortlisted sites and preferred option for a worksite to connect to the CSO known as Acton Storm Relief. Paper describes use of preferred site during construction and permanent use after construction is finished. | PDF (4 pages) |
| Albert Embankment Foreshore - phase one site information paper | Site specific information paper about the shortlisted sites and preferred option for a worksite to connect to two local CSOs known as Clapham Storm Relief and Brixton Storm Relief. Paper describes use of preferred site during construction and permanent use after construction is finished. | PDF (4 pages) |
| Amalgamated Report - Appendices (combined pdf file) | The appendices included the main report of phase one consultation for the Thames Tunnel. The document provides a detailed analysis of the responses received on the need for the tunnel, the route, the sites, the approach to consultation and the next steps moving forward. | PDF (85 pages) |
| Amalgamated Report - Main Report (combined pdf file) | The main report of phase one consultation for the Thames Tunnel. The document provides a detailed analysis of the responses received on the need for the tunnel, the route, the sites, the approach to consultation and the next steps moving forward. | PDF (170 pages) |
| Amendments to the Report on phase one consultation | Document setting out the amendments to the Report on phase one consultation following its publication. | PDF (3 pages) |
| Barn Elms - phase one site information paper | Site specific information paper about the shortlisted sites and preferred option for a worksite in the Barn Elms area to be used to construct the main tunnel of the project and also to connect to the CSO known as West Putney Storm Relief Sewer. | PDF (6 pages) |
| Beckton Sewage Treatment Works - phase one site information paper | Site specific information paper about types of works proposed at Beckton Sewage Treatment Works such as the installation of additional pumps and extension of odour control facilities. | PDF (2 pages) |
| Bell Lane Creek - phase one site information paper | Site specific information paper about the shortlisted site and preferred option for a worksite to connect to the CSO known as Frogmore Storm Relief. Paper describes use of preferred site during construction and permanent use after construction is finished. | PDF (4 pages) |
| Blackfriars Bridge Foreshore - phase one site information paper | Site specific information paper about the preferred option for a worksite to connect Fleet Main CSO and the northern Low Level Number 1 Sewer to the main tunnel. Paper describes use of preferred site during construction and permanent use after construction is finished. | PDF (4 pages) |
| Borthwick Wharf Foreshore - phase one site information paper | Site specific information paper about the shortlisted sites and preferred option for a worksite to connect to the CSO known as Deptford Storm Relief. Paper describes use of preferred site during construction and permanent use after construction is finished. | PDF (4 pages) |
| Bridges Court Car Park - phase one site information paper | Site specific information paper about the shortlisted sites and preferred option for a worksite to connect to the CSO known as Falconbrook Pumping Station. Paper describes use of preferred site during construction and permanent use after construction is finished. | PDF (4 pages) |
| Build – How we will build the tunnel | Project information paper explaining the stages of how the Thames Tunnel will be built, looking at the key points required in construction as well as the balancing act of how Thames Water have arrived at the solution of the particular type of tunnel proposed. | PDF (3 pages) |
| Butcher Row - phase one site information paper | Site specific information paper about the shortlisted sites and preferred option for a worksite to connect to the CSO known as Holloway Storm Relief. Paper describes use of preferred site during construction and permanent use after construction is finished. | PDF (4 pages) |
| Chapter 01 - Introduction | The supplementary report provides a detailed record of phase one consultation with respect to feedback received from respondents, in a tabular format and an analysis of the issues raised and Thames Water’s initial response to the issues. | PDF (2 pages) |
| Chapter 02-04 - Need, Solution and Route | The supplementary report provides a detailed record of phase one consultation with respect to feedback received from respondents, in a tabular format and an analysis of the issues raised and Thames Water’s initial response to the issues. | PDF (66 pages) |
| Chapter 29 - Consultation Process | The supplementary report provides a detailed record of phase one consultation with respect to feedback received from respondents, in a tabular format and an analysis of the issues raised and Thames Water’s initial response to the issues. | PDF (71 pages) |
| Chelsea Embankment Foreshore - phase one site information paper | Site specific information paper about the preferred option for a worksite to connect Ranelagh CSO and the northern Low Level Number 1 Sewer to the main tunnel. Paper describes use of preferred site during construction and permanent use after construction is finished. | PDF (4 pages) |
| Community consultation strategy | Thames Water proposes to design and build and operate a tunnel to capture untreated sewage, which currently flows directly into the River Thames after as little as 2mm of rainfall. This community consultation strategy, summarised in the formal Statement of Community Consultation, sets out our approach and timetable for consulting all those with an interest in the proposed Thames Tunnel. | PDF (20 pages) |
| Construction sites - The site selection process | Project information paper explaining the rigorous process for choosing the most suitable worksites for the project to go ahead. | PDF (2 pages) |
| Cover, contents and list of abbreviations | The main report of phase one consultation for the Thames Tunnel. The document provides a detailed analysis of the responses received on the need for the tunnel, the route, the sites, the approach to consultation and the next steps moving forward. | PDF (8 pages) |
| Cover, contents and list of abbreviations | The supplementary report provides a detailed record of phase one consultation with respect to feedback received from respondents, in a tabular format and an analysis of the issues raised and Thames Water’s initial response to the issues. | PDF (5 pages) |
| Cremorne Wharf Foreshore - phase one site information paper | Site specific information paper about the preferred option for a worksite to connect to the CSO known as Lots Road Pumping Station. Paper describes use of preferred site during construction and permanent use after construction is finished. | PDF (4 pages) |
| Customer overview leaflet | Booklet aimed at Thames Water customers about the need for the tunnel, the initial proposals and the big picture. | PDF (5 pages) |
| Depth – Tunnelling under London | Project information paper explaining the depth of the main tunnel and some key considerations and constraints to be taken into account when deciding the route, such as location of CSOs and avoidance of existing underground infrastructure such as road tunnels and mains electricity cables. | PDF (2 pages) |
| Druid Street - phase one site information paper | Site specific information paper about the shortlisted sites and preferred option for a worksite to connect to the CSO known as Shad Thames Pumping Station. Paper describes use of preferred site during construction and permanent use after construction is finished. | PDF (4 pages) |
| Earl Pumping Station - phase one site information paper | Site specific information paper about the shortlisted sites and preferred option for a worksite to connect to the CSO known as Earl Pumping Station. Paper describes use of preferred site during construction and permanent use after construction is finished. | PDF (4 pages) |
| Environment – Caring for the Environment | Project information paper explaining the various topics which will be included in the appraisal of environmental issues affecting the tunnel, such as: air quality, archaeology, flood risk and noise. | PDF (4 pages) |
| Foreword | The main report of phase one consultation for the Thames Tunnel. The document provides a detailed analysis of the responses received on the need for the tunnel, the route, the sites, the approach to consultation and the next steps moving forward. | PDF (2 pages) |
| Funding – How we will fund construction | Project information paper explaining how the project will be funded including information of the likely financial impacts on Thames Water customers over the period of the project and into the future. | PDF (2 pages) |
| Glossary | Glossary of terms. | PDF (3 pages) |
| Glossary | Glossary of terms. | PDF (3 pages) |
| Greenwich Pumping Station - phase one site information paper | Site specific information paper about the shortlisted site and preferred option for a worksite to connect to the CSO known as Greenwich Pumping Station. Paper describes use of preferred site during construction and permanent use after construction is finished. | PDF (4 pages) |
| Greenwich Pumping Station – Information Paper | Information Paper looking at the option for a new tunnelling strategy and an alternative proposal to tunnel from King’s Stairs Gardens to Greenwich Pumping Station, to provide a connection tunnel from Greenwich Pumping Station to proposed site at Chambers Wharf. | PDF (2 pages) |
| Hammersmith Pumping Station - phase one site information paper | Site specific information paper about the shortlisted sites and preferred option for a worksite in the Hammersmith area to be used to construct the main tunnel of the project and also to connect to the CSO known as Hammersmith Pumping Station. | PDF (4 pages) |
| Heckford Street Industrial Area – Information Paper | Information paper discussing work to connect to the North East Storm Relief CSO and, as a response to community feedback, looking at the option of combining a site in Heckford Street Industrial Area with a worksite at King Edward Memorial Park. | PDF (2 pages) |
| Jews Row - phase one site information paper | Site specific information paper about the shortlisted sites and preferred option for a worksite to connect two local CSOs known as Falconbrook Storm Relief and Wandle Valley Storm Relief. Paper describes use of preferred site during construction and permanent use after construction is finished. | PDF (4 pages) |
| King Edward Memorial Park Foreshore - phase one site information paper | Site specific information paper about the shortlisted site and preferred option for a worksite to connect to the CSO known as North East Storm Relief. Paper describes use of preferred site during construction and permanent use after construction is finished. | PDF (4 pages) |
| King George’s Park - phase one site information paper | Site specific information paper about the shortlisted site and preferred option for a worksite to connect to the CSO known as Frogmore Storm Relief. Paper describes use of preferred site during construction and permanent use after construction is finished. | PDF (4 pages) |
| King’s Stairs Gardens - phase one site information paper | Site specific information paper about the preferred option for a worksite in the Bermondsey area to be used to construct the main tunnel of the project and also to connect four local CSOs from the surrounding area to the tunnel. | PDF (4 pages) |
| Land – How will we fund construction | Project information paper explaining how Thames Water will aim to ensure that worksites are, as far as possible, returned to their previous states, or improved once work is completed. | PDF (2 pages) |
| Main Report on Phase 1 Consultation – Appendix A, Route Map | Main Report on Phase 1 Consultation – Appendix A, Route Map | PDF (2 pages) |
| Main Report on Phase 1 Consultation – Appendix B, Statement of Community Consultation | Statement of Community Consultation | PDF (2 pages) |
| Main Report on Phase 1 Consultation – Appendix C, Statutory Consultees | Statutory Consultees | PDF (5 pages) |
| Main Report on Phase 1 Consultation – Appendix D, Newspaper Adverts | Newspaper Adverts | PDF (3 pages) |
| Main Report on Phase 1 Consultation – Appendix E, Letter Types | Letter Types | PDF (19 pages) |
| Main Report on Phase 1 Consultation – Appendix F, Community Audit Methodology and Data | Community Audit Methodology and Data | PDF (36 pages) |
| Main Report on Phase 1 Consultation – Appendix G, Public Meetings with Stakeholders | Public Meetings with Stakeholders | PDF (3 pages) |
| Main Report on Phase 1 Consultation – Appendix H, Town Halls and Libraries | Town Halls and Libraries | PDF (2 pages) |
| Main Report on Phase 1 Consultation – Appendix I, Exhibitions and Visitor Numbers | Exhibitions and Visitor Numbers | PDF (4 pages) |
| Main Report on Phase 1 Consultation – Appendix J, Feedback Form | Feedback Form | PDF (5 pages) |
| Main Report on Phase 1 Consultation – Appendix K, Feedback Quantification | Feedback Quantification | PDF (3 pages) |
| Managing Construction | Project information paper explaining the measures already undertaken and that will be implemented during construction to minimise disruption to communities across London. | PDF (2 pages) |
| Map - London | London wide map showing the route of the preferred tunnel and other considered routes as well as locations of preferred and other worksites. | PDF (1 pages) |
| Map – Central London | Map of Central London showing preferred and other considered routes, local CSOs, pumping stations and worksites. | PDF (1 pages) |
| Map – East London | Map of East London showing preferred and other considered routes, local CSOs, pumping stations and worksites | PDF (1 pages) |
| Map – West London | Map of West London showing preferred route, local CSOs, pumping stations and worksites. | PDF (1 pages) |
| Odour | Project information paper explaining the mitigation measures Thames Water are proposing to ensure that the tunnel is adequately ventilated and that odour cannot become a nuisance. | PDF (2 pages) |
| Options – Alternatives to the Thames Tunnel | Project information paper looking at the various alternative options to the Thames Tunnel , including sustainable urban drainage systems, separation of the sewerage system, bubbler and skimmers boats and storage and transfer. | PDF (4 pages) |
| Other Shortlisted Sites - phase one site information paper | Site specific information paper identifying different sites that were shortlisted for the Rotherhide and River Thames tunnel routes but were not required for the preferred Abbey Mills Route. | PDF (5 pages) |
| Other Works - phase one site information paper | Site specific information paper explaining other works to be undertaken in association with the Thames Tunnel project which include connections to northern Low Level Number 1 Sewer, minor sewer modifications and safety access points, as well as differences to works to intercept Charlton CSO. | PDF (6 pages) |
| Overflow – Why we need to clean up the Thames | Project information paper providing information on how the existing sewage system is inadequate for modern needs and subsequently why the Thames Tunnel is required and how it will help combat overflows of sewage into the Thames. | PDF (4 pages) |
| Project Overview | Overview of the complete Thames Tunnel project for phase one consultation. | PDF (41 pages) |
| Putney Bridge Foreshore - phase one site information paper | Site specific information paper about the shortlisted sites and preferred option for a worksite to connect to the CSO known as Putney Bridge. Paper describes use of preferred site during construction and permanent use after construction is finished. | PDF (4 pages) |
| Regulatory framework | Project information paper setting out the regulatory framework Thames Water is required to work within as set out by key organisations such as the European Union, Ofwat, the Environment Agency and Local Authorities. | PDF (2 pages) |
| Report on phase one consultation - Abbey Mills Pumping Station | The main report of phase one consultation for the Thames Tunnel. The document provides a detailed analysis of the responses received on the need for the tunnel, the route, the sites, the approach to consultation and the next steps moving forward. | PDF (4 pages) |
| Report on phase one consultation - Acton Storm Tanks | The main report of phase one consultation for the Thames Tunnel. The document provides a detailed analysis of the responses received on the need for the tunnel, the route, the sites, the approach to consultation and the next steps moving forward. | PDF (4 pages) |
| Report on phase one consultation - Albert Embankment Foreshore | The main report of phase one consultation for the Thames Tunnel. The document provides a detailed analysis of the responses received on the need for the tunnel, the route, the sites, the approach to consultation and the next steps moving forward. | PDF (4 pages) |
| Report on phase one consultation - Barn Elms | The main report of phase one consultation for the Thames Tunnel. The document provides a detailed analysis of the responses received on the need for the tunnel, the route, the sites, the approach to consultation and the next steps moving forward. | PDF (7 pages) |
| Report on phase one consultation - Beckton Sewage Treatment Works | The main report of phase one consultation for the Thames Tunnel. The document provides a detailed analysis of the responses received on the need for the tunnel, the route, the sites, the approach to consultation and the next steps moving forward. | PDF (2 pages) |
| Report on phase one consultation - Bell Lane Creek | The main report of phase one consultation for the Thames Tunnel. The document provides a detailed analysis of the responses received on the need for the tunnel, the route, the sites, the approach to consultation and the next steps moving forward. | PDF (3 pages) |
| Report on phase one consultation - Blackfriars Bridge Foreshore | The main report of phase one consultation for the Thames Tunnel. The document provides a detailed analysis of the responses received on the need for the tunnel, the route, the sites, the approach to consultation and the next steps moving forward. | PDF (4 pages) |
| Report on phase one consultation - Borthwick Wharf Foreshore | The main report of phase one consultation for the Thames Tunnel. The document provides a detailed analysis of the responses received on the need for the tunnel, the route, the sites, the approach to consultation and the next steps moving forward. | PDF (4 pages) |
| Report on phase one consultation - Bridges Court Car Park | The main report of phase one consultation for the Thames Tunnel. The document provides a detailed analysis of the responses received on the need for the tunnel, the route, the sites, the approach to consultation and the next steps moving forward. | PDF (4 pages) |
| Report on phase one consultation - Butcher Row | The main report of phase one consultation for the Thames Tunnel. The document provides a detailed analysis of the responses received on the need for the tunnel, the route, the sites, the approach to consultation and the next steps moving forward. | PDF (4 pages) |
| Report on phase one consultation - Chelsea Embankment Foreshore | The main report of phase one consultation for the Thames Tunnel. The document provides a detailed analysis of the responses received on the need for the tunnel, the route, the sites, the approach to consultation and the next steps moving forward. | PDF (3 pages) |
| Report on phase one consultation - Cremorne Wharf Foreshore | The main report of phase one consultation for the Thames Tunnel. The document provides a detailed analysis of the responses received on the need for the tunnel, the route, the sites, the approach to consultation and the next steps moving forward. | PDF (4 pages) |
| Report on phase one consultation - Druid Street | The main report of phase one consultation for the Thames Tunnel. The document provides a detailed analysis of the responses received on the need for the tunnel, the route, the sites, the approach to consultation and the next steps moving forward. | PDF (4 pages) |
| Report on phase one consultation - Earl Pumping Station | The main report of phase one consultation for the Thames Tunnel. The document provides a detailed analysis of the responses received on the need for the tunnel, the route, the sites, the approach to consultation and the next steps moving forward. | PDF (4 pages) |
| Report on phase one consultation - Greenwich Pumping Station | The main report of phase one consultation for the Thames Tunnel. The document provides a detailed analysis of the responses received on the need for the tunnel, the route, the sites, the approach to consultation and the next steps moving forward. | PDF (3 pages) |
| Report on phase one consultation - Hammersmith Pumping Station | The main report of phase one consultation for the Thames Tunnel. The document provides a detailed analysis of the responses received on the need for the tunnel, the route, the sites, the approach to consultation and the next steps moving forward. | PDF (5 pages) |
| Report on phase one consultation - Jews Row | The main report of phase one consultation for the Thames Tunnel. The document provides a detailed analysis of the responses received on the need for the tunnel, the route, the sites, the approach to consultation and the next steps moving forward. | PDF (4 pages) |
| Report on phase one consultation - King Edward Memorial Park Foreshore | The main report of phase one consultation for the Thames Tunnel. The document provides a detailed analysis of the responses received on the need for the tunnel, the route, the sites, the approach to consultation and the next steps moving forward. | PDF (5 pages) |
| Report on phase one consultation - Kings George’s Park | The main report of phase one consultation for the Thames Tunnel. The document provides a detailed analysis of the responses received on the need for the tunnel, the route, the sites, the approach to consultation and the next steps moving forward. | PDF (4 pages) |
| Report on phase one consultation - King’s Stairs Gardens | The main report of phase one consultation for the Thames Tunnel. The document provides a detailed analysis of the responses received on the need for the tunnel, the route, the sites, the approach to consultation and the next steps moving forward. | PDF (5 pages) |
| Report on phase one consultation - Putney Bridge | The main report of phase one consultation for the Thames Tunnel. The document provides a detailed analysis of the responses received on the need for the tunnel, the route, the sites, the approach to consultation and the next steps moving forward. | PDF (5 pages) |
| Report on phase one consultation - Tideway Walk | The main report of phase one consultation for the Thames Tunnel. The document provides a detailed analysis of the responses received on the need for the tunnel, the route, the sites, the approach to consultation and the next steps moving forward. | PDF (5 pages) |
| Report on phase one consultation - Victoria Embankment Foreshore | The main report of phase one consultation for the Thames Tunnel. The document provides a detailed analysis of the responses received on the need for the tunnel, the route, the sites, the approach to consultation and the next steps moving forward. | PDF (3 pages) |
| Routes – Development of the tunnel route | Project information paper showing the development of the different route options for the Thames Tunnel and outlining the preferred route and reasons for this choice. | PDF (3 pages) |
| Section 1 - Approach to consultation | The main report of phase one consultation for the Thames Tunnel. The document provides a detailed analysis of the responses received on the need for the tunnel, the route, the sites, the approach to consultation and the next steps moving forward. | PDF (24 pages) |
| Section 2 - Need, solution and tunnel route | The main report of phase one consultation for the Thames Tunnel. The document provides a detailed analysis of the responses received on the need for the tunnel, the route, the sites, the approach to consultation and the next steps moving forward. | PDF (20 pages) |
| Section 4 - Approach to consultation | The main report of phase one consultation for the Thames Tunnel. The document provides a detailed analysis of the responses received on the need for the tunnel, the route, the sites, the approach to consultation and the next steps moving forward. | PDF (7 pages) |
| Section 5 - Conclusion | The main report of phase one consultation for the Thames Tunnel. The document provides a detailed analysis of the responses received on the need for the tunnel, the route, the sites, the approach to consultation and the next steps moving forward. | PDF (6 pages) |
| Statement of Community Consultation | Our statement on who we will consult, how we will consult and what we will consult stakeholders on regarding the Thames Tunnel. | PDF (1 pages) |
| Summary Report on Phase 1 Consultation | A summary of the main report of phase one consultation for the Thames Tunnel. The document provides a summary of the responses received on the need for the tunnel, the route, the sites, the approach to consultation and the next steps moving forward. | PDF (50 pages) |
| Supplementary Report (combined pdf file) | The supplementary report provides a detailed record of phase one consultation with respect to feedback received from respondents, in a tabular format and an analysis of the issues raised and Thames Water’s initial response to the issues. | PDF (797 pages) |
| Supplementary report on phase one consultation - Abbey Mills Pumping Station | The supplementary report provides a detailed record of phase one consultation with respect to feedback received from respondents, in a tabular format and an analysis of the issues raised and Thames Water’s initial response to the issues. | PDF (15 pages) |
| Supplementary report on phase one consultation - Acton Storm Tanks | The supplementary report provides a detailed record of phase one consultation with respect to feedback received from respondents, in a tabular format and an analysis of the issues raised and Thames Water’s initial response to the issues. | PDF (27 pages) |
| Supplementary report on phase one consultation - Albert Embankment Foreshore | The supplementary report provides a detailed record of phase one consultation with respect to feedback received from respondents, in a tabular format and an analysis of the issues raised and Thames Water’s initial response to the issues. | PDF (20 pages) |
| Supplementary report on phase one consultation - Barn Elms | The supplementary report provides a detailed record of phase one consultation with respect to feedback received from respondents, in a tabular format and an analysis of the issues raised and Thames Water’s initial response to the issues. | PDF (82 pages) |
| Supplementary report on phase one consultation - Beckton Sewage Treatment Works | The supplementary report provides a detailed record of phase one consultation with respect to feedback received from respondents, in a tabular format and an analysis of the issues raised and Thames Water’s initial response to the issues. | PDF (5 pages) |
| Supplementary report on phase one consultation - Bell Lane Creek | The supplementary report provides a detailed record of phase one consultation with respect to feedback received from respondents, in a tabular format and an analysis of the issues raised and Thames Water’s initial response to the issues. | PDF (12 pages) |
| Supplementary report on phase one consultation - Blackfriars Bridge Foreshore | The supplementary report provides a detailed record of phase one consultation with respect to feedback received from respondents, in a tabular format and an analysis of the issues raised and Thames Water’s initial response to the issues. | PDF (13 pages) |
| Supplementary report on phase one consultation - Borthwick Wharf Foreshore | The supplementary report provides a detailed record of phase one consultation with respect to feedback received from respondents, in a tabular format and an analysis of the issues raised and Thames Water’s initial response to the issues. | PDF (27 pages) |
| Supplementary report on phase one consultation - Bridge’s Court Car Park | The supplementary report provides a detailed record of phase one consultation with respect to feedback received from respondents, in a tabular format and an analysis of the issues raised and Thames Water’s initial response to the issues. | PDF (27 pages) |
| Supplementary report on phase one consultation - Butcher Row | The supplementary report provides a detailed record of phase one consultation with respect to feedback received from respondents, in a tabular format and an analysis of the issues raised and Thames Water’s initial response to the issues. | PDF (24 pages) |
| Supplementary report on phase one consultation - Chelsea Embankment | The supplementary report provides a detailed record of phase one consultation with respect to feedback received from respondents, in a tabular format and an analysis of the issues raised and Thames Water’s initial response to the issues. | PDF (12 pages) |
| Supplementary report on phase one consultation - Cremorne Wharf Foreshore | The supplementary report provides a detailed record of phase one consultation with respect to feedback received from respondents, in a tabular format and an analysis of the issues raised and Thames Water’s initial response to the issues. | PDF (17 pages) |
| Supplementary report on phase one consultation - Druid Street | The supplementary report provides a detailed record of phase one consultation with respect to feedback received from respondents, in a tabular format and an analysis of the issues raised and Thames Water’s initial response to the issues. | PDF (27 pages) |
| Supplementary report on phase one consultation - Earl Pumping Station | The supplementary report provides a detailed record of phase one consultation with respect to feedback received from respondents, in a tabular format and an analysis of the issues raised and Thames Water’s initial response to the issues. | PDF (14 pages) |
| Supplementary report on phase one consultation - Greenwich Pumping Station | The supplementary report provides a detailed record of phase one consultation with respect to feedback received from respondents, in a tabular format and an analysis of the issues raised and Thames Water’s initial response to the issues. | PDF (11 pages) |
| Supplementary report on phase one consultation - Hammersmith Pumping Station | The supplementary report provides a detailed record of phase one consultation with respect to feedback received from respondents, in a tabular format and an analysis of the issues raised and Thames Water’s initial response to the issues. | PDF (37 pages) |
| Supplementary report on phase one consultation - Jews Row | The supplementary report provides a detailed record of phase one consultation with respect to feedback received from respondents, in a tabular format and an analysis of the issues raised and Thames Water’s initial response to the issues. | PDF (23 pages) |
| Supplementary report on phase one consultation - King Edward Memorial Park | The supplementary report provides a detailed record of phase one consultation with respect to feedback received from respondents, in a tabular format and an analysis of the issues raised and Thames Water’s initial response to the issues. | PDF (56 pages) |
| Supplementary report on phase one consultation - King George’s Park | The supplementary report provides a detailed record of phase one consultation with respect to feedback received from respondents, in a tabular format and an analysis of the issues raised and Thames Water’s initial response to the issues. | PDF (14 pages) |
| Supplementary report on phase one consultation - King’s Stairs Gardens | The supplementary report provides a detailed record of phase one consultation with respect to feedback received from respondents, in a tabular format and an analysis of the issues raised and Thames Water’s initial response to the issues. | PDF (50 pages) |
| Supplementary report on phase one consultation - Other shortlisted Sites and Other Works | The supplementary report provides a detailed record of phase one consultation with respect to feedback received from respondents, in a tabular format and an analysis of the issues raised and Thames Water’s initial response to the issues. | PDF (48 pages) |
| Supplementary report on phase one consultation - Putney Bridge Foreshore | The supplementary report provides a detailed record of phase one consultation with respect to feedback received from respondents, in a tabular format and an analysis of the issues raised and Thames Water’s initial response to the issues. | PDF (48 pages) |
| Supplementary report on phase one consultation - Tideway Walk | The supplementary report provides a detailed record of phase one consultation with respect to feedback received from respondents, in a tabular format and an analysis of the issues raised and Thames Water’s initial response to the issues. | PDF (24 pages) |
| Supplementary report on phase one consultation - Victoria Embankment Foreshore | The supplementary report provides a detailed record of phase one consultation with respect to feedback received from respondents, in a tabular format and an analysis of the issues raised and Thames Water’s initial response to the issues. | PDF (17 pages) |
| Tideway Walk - phase one site information paper | Site specific information paper about the shortlisted sites and preferred option for a worksite in the Battersea area to be used to construct the main tunnel of the project and also to connect two CSOs known as Heathwall Pumping Station and South West Storm Relief. | PDF (6 pages) |
| Timing - Likely timescale | Project information paper identifying the key dates associated with the project up to its completion in 2020. | PDF (2 pages) |
| Transport – Using the river to transport materials | Project information paper explaining the preferred choice of river transport to move materials for the construction of the Thames Tunnel therefore, as far as possible, practicable and cost effective, reducing impact on local roads and highways. | PDF (2 pages) |
| Victoria Embankment Foreshore - phase one site information paper | Site specific information paper about the shortlisted site and preferred option for a worksite to connect Regent Street CSO and the northern Low Level Number 1 Sewer to the main tunnel. Paper describes use of preferred site during construction and permanent use after construction is finished. | PDF (4 pages) |
| Views – Tell us what you think | Project information paper providing information on consultation objectives as well as varying ways of contacting and leaving feedback for the project team. | PDF (2 pages) |
| Why does London need the Thames Tunnel? | A background to the reasons behind the requirement for the Thames Tunnel including a brief history, reasons why it is time to act now, the challenges the project faces, examples of similar projects in other major cities around the world and the alternative options considered. | PDF (24 pages) |
| View document | Summary | Download |
|---|---|---|
| Action Storm Tanks Information paper (modified proposals) | Information paper explaining the potential new layout and use of the Acton Storm Tanks site. | PDF (2 pages) |
| Application form | Application form for the exceptional hardship procedure. | PDF (8 pages) |
| Assistance guide | Guide to help you fill out the application form for the exceptional hardship procedure. | PDF (6 pages) |
| Carnwath Road Riverside – Information Paper | Information paper looking at an option for a major worksite in alternative location to Barn Elms Playing Fields on industrial land at Carnwath Road. The site has been identified as a possible ‘drive’ site for the main tunnel. | PDF (2 pages) |
| Carnwath Road Riverside – Letter to local residents | Copy of letter to local residents explaining ongoing investigations into potential for using site at Carnwath Road Riverside as main ‘drive’ site. Letter extends invite to drop in sessions for residents to answer questions and take note of issues raised. | PDF (2 pages) |
| Carnwath Road Riverside – Location Plan | Site Plan identifying potential new worksite at Carnwath Road. | PDF (1 pages) |
| Chambers Wharf – Information Paper | Information paper looking at an option for a major worksite in alternative location to King’s Stairs Gardens at Chambers Wharf, to the west of King’s Stairs Gardens. | PDF (2 pages) |
| Chambers Wharf – Letter to local residents | Copy of letter to local residents explaining that Chambers Wharf had become an alternative option as a major works site as it had recently returned to the market. The letter extends an invite to local residents to answer questions and take note of issues raised. | PDF (2 pages) |
| Chambers Wharf – Location Plan | Site Plan identifying potential new worksite at Chambers Wharf. | PDF (1 pages) |
| Cremorne Wharf Depot - Location Plan | Location plan of the potential new site at Cremorne Wharf Depot. | PDF (1 pages) |
| Deptford Church Street – Information Paper | Information paper discussing the proposed location for a worksite needed to connect the Deptford Storm Relief CSO as a result of community feedback raised in phase one consultation. New potential site is located adjacent to Deptford Church Street and between Crossfield and Coffey Street. | PDF (2 pages) |
| Dormay Street – Information Paper | Information paper looking at an alternative worksite at Dormay Street to be used to connect the CSO known as Frogmore Storm Relief – Bell Lane Creek. | PDF (2 pages) |
| Dormay Street – Location Plan | Site Plan identifying potential new worksite at Dormay Street. | PDF (1 pages) |
| Falconbrook Pumping Station – Information Paper | Information paper looking at a potential alternative worksite to connect CSO known as Falconbrook Pumping Station. During first phase of public consultation proposal was to use Bridges Court Car Park but now an alternative site at Falconbrook Pumping Station has been identified as a possibility. | PDF (2 pages) |
| Falconbrook Pumping Station – Location Plan | Site Plan identifying potential new worksite at Falconbrook Pumping Station. | PDF (1 pages) |
| Frequently asked questions | Frequently asked questions about the exception hardship procedure. | PDF (3 pages) |
| Kirtling Street (modified proposals) - Letter to local properties | Letter to the local community surrounding the potential Kirtling Street site regarding the modified proposals. | PDF (2 pages) |
| Kirtling Street (modified site proposal) - Information Paper | Information paper explaining the modified proposals for the potential Kirtling Street site. | PDF (2 pages) |
| Kirtling Street - Information paper | Information paper giving details on a potential new site option at Kirtling Street. | PDF (2 pages) |
| Kirtling Street - Location Plan | Location plan of the potential new site at Kirtling Street. | PDF (1 pages) |
| News item: New site option at Cremorne Wharf | Article reporting on the public meeting held with stakeholders in the vicinity of Lots Road/Cremorne Wharf to publicise the potential new site at Cremorne Wharf Depot. | PDF (1 pages) |
| Shad Thames Pumping Station - Information Paper | Information paper discussing the proposed works at the Shad Pumping Station CSO. The paper provides a location plan and advises on reasons behind a potential move of works to Maguire Street instead of Druid Street. | PDF (2 pages) |
| View document | Summary | Download |
|---|---|---|
| EIA Scoping Results - City of London |
Environmental Impact Assessment Scoping Report to request Scoping Opinion from stakeholders for the Thames Tunnel project.
| PDF (25 pages) |
| EIA Scoping Results - City of Westminster |
Environmental Impact Assessment Scoping Report to request Scoping Opinion from stakeholders for the Thames Tunnel project.
| PDF (24 pages) |
| EIA Scoping Results - Introduction | Environmental Impact Assessment Scoping Report to request Scoping Opinion from local stakeholders for the Thames Tunnel Project. | PDF (10 pages) |
| EIA Scoping Results - London Borough of Ealing |
Environmental Impact Assessment Scoping Report to request Scoping Opinion from stakeholders for the Thames Tunnel project.
| PDF (22 pages) |
| EIA Scoping Results - London Borough of Greenwich |
Environmental Impact Assessment Scoping Report to request Scoping Opinion from stakeholders for the Thames Tunnel project.
| PDF (42 pages) |
| EIA Scoping Results - London Borough of Hammersmith & Fulham |
Environmental Impact Assessment Scoping Report to request Scoping Opinion from stakeholders for the Thames Tunnel project.
| PDF (24 pages) |
| EIA Scoping Results - London Borough of Hounslow |
Environmental Impact Assessment Scoping Report to request Scoping Opinion from stakeholders for the Thames Tunnel project.
| PDF (7 pages) |
| EIA Scoping Results - London Borough of Lambeth |
Environmental Impact Assessment Scoping Report to request Scoping Opinion from stakeholders for the Thames Tunnel project.
| PDF (26 pages) |
| EIA Scoping Results - London Borough of Lewisham |
Environmental Impact Assessment Scoping Report to request Scoping Opinion from stakeholders for the Thames Tunnel project.
| PDF (22 pages) |
| EIA Scoping Results - London Borough of Newham |
Environmental Impact Assessment Scoping Report to request Scoping Opinion from stakeholders for the Thames Tunnel project.
| PDF (44 pages) |
| EIA Scoping Results - London Borough of Richmond upon Thames |
Environmental Impact Assessment Scoping Report to request Scoping Opinion from stakeholders for the Thames Tunnel project.
| PDF (26 pages) |
| EIA Scoping Results - London Borough of Southwark |
Environmental Impact Assessment Scoping Report to request Scoping Opinion from stakeholders for the Thames Tunnel project.
| PDF (44 pages) |
| EIA Scoping Results - London Borough of Tower Hamlets |
Environmental Impact Assessment Scoping Report to request Scoping Opinion from stakeholders for the Thames Tunnel project.
| PDF (43 pages) |
| EIA Scoping Results - London Borough of Wandsworth |
Environmental Impact Assessment Scoping Report to request Scoping Opinion from stakeholders for the Thames Tunnel project.
| PDF (114 pages) |
| EIA Scoping Results - Royal Borough of Kensington & Chelsea |
Environmental Impact Assessment Scoping Report to request Scoping Opinion from stakeholders for the Thames Tunnel project.
| PDF (46 pages) |
| EIA Scoping Results Appendices - City of London | Appendices to the Scoping Report broken down by Borough. | PDF (6 pages) |
| EIA Scoping Results Appendices - City of Westminster | Appendices to the Scoping Report broken down by Borough. | PDF (6 pages) |
| EIA Scoping Results Appendices - Cover and Contents | Appendices to the Scoping Report broken down by Borough. | PDF (7 pages) |
| EIA Scoping Results Appendices - London Borough of Ealing | Appendices to the Scoping Report broken down by Borough. | PDF (7 pages) |
| EIA Scoping Results Appendices - London Borough of Greenwich | Appendices to the Scoping Report broken down by Borough. | PDF (12 pages) |
| EIA Scoping Results Appendices - London Borough of Hammersmith & Fulham | Appendices to the Scoping Report broken down by Borough. | PDF (6 pages) |
| EIA Scoping Results Appendices - London Borough of Hounslow | Appendices to the Scoping Report broken down by Borough. | PDF (2 pages) |
| EIA Scoping Results Appendices - London Borough of Lambeth | Appendices to the Scoping Report broken down by Borough. | PDF (6 pages) |
| EIA Scoping Results Appendices - London Borough of Lewisham | Appendices to the Scoping Report broken down by Borough. | PDF (6 pages) |
| EIA Scoping Results Appendices - London Borough of Newham | Appendices to the Scoping Report broken down by Borough. | PDF (11 pages) |
| EIA Scoping Results Appendices - London Borough of Richmond upon Thames | Appendices to the Scoping Report broken down by Borough. | PDF (6 pages) |
| EIA Scoping Results Appendices - London Borough of Southwark | Appendices to the Scoping Report broken down by Borough. | PDF (11 pages) |
| EIA Scoping Results Appendices - London Borough of Tower Hamlets | Appendices to the Scoping Report broken down by Borough. | PDF (11 pages) |
| EIA Scoping Results Appendices - London Borough of Wandsworth (Figures 13.1-13.6) | Appendices to the Scoping Report broken down by Borough. | PDF (7 pages) |
| EIA Scoping Results Appendices - London Borough of Wandsworth (Figures 13.12-13.21) | Appendices to the Scoping Report broken down by Borough. | PDF (10 pages) |
| EIA Scoping Results Appendices - London Borough of Wandsworth (Figures 13.22-13.31) | Appendices to the Scoping Report broken down by Borough. | PDF (11 pages) |
| EIA Scoping Results Appendices - London Borough of Wandsworth (Figures 13.7-13.11) | Appendices to the Scoping Report broken down by Borough. | PDF (5 pages) |
| EIA Scoping Results Appendices - Royal Borough of Kensington & Chelsea | Appendices to the Scoping Report broken down by Borough. | PDF (11 pages) |
| EIA Scoping Results Appendices - Site photographs, Draft CoCP, Abbreviations and Glossary | Appendices to the Scoping Report, Site photographs, draft code of construction practice, abbreviations and glossary. | PDF (69 pages) |
| Part A - Overview | Environmental Impact Assessment Scoping Report to request Scoping Opinion from stakeholders for the Thames Tunnel project. | PDF (160 pages) |
| View document | Summary | Download |
|---|---|---|
| A guide to the Thames Tunnel compensation programme | A guide to the Thames Tunnel compensation programme, including compensation available now and during construction. | PDF (4 pages) |
| Abbey Mills Pumping Station - phase two site information paper | Site information paper explaining our phase two consultation proposals for the site. The paper includes information on how the site was chosen, our potential use of the site, the proposed future use of the site and operational issues. | PDF (28 pages) |
| Abbey Mills Pumping Station display board | A visual board showing location plans, construction layouts, and post-construction visuals of the proposed site at Abbey Mills Pumping Station. | PDF (1 pages) |
| Acton Storm Tanks - phase two site information paper | Site information paper explaining our phase two consultation proposals for the site. The paper includes information on how the site was chosen, our potential use of the site, the proposed future use of the site and operational issues. | PDF (32 pages) |
| Acton Storm Tanks display board | A visual board showing location plans, construction layouts, and post-construction visuals of the proposed site at Acton Storm Tanks. | PDF (1 pages) |
| Air management plan | Air management plan defines how air from the proposed Thames Tunnel project is vented into and out of the tunnel system and how air releases are controlled and treated. It outlines operational and management procedures for controlling air movement, and treatment of air to meet regulatory requirements and limit the extent of nuisance odours. | PDF (49 pages) |
| Albert Embankment Foreshore - phase two site information paper | Site information paper explaining our phase two consultation proposals for the site. The paper includes information on how the site was chosen, our potential use of the site, the proposed future use of the site and operational issues. | PDF (32 pages) |
| Albert Embankment Foreshore display board | A visual board showing location plans, construction layouts, and post-construction visuals of the proposed site at Albert Embankment Foreshore. | PDF (1 pages) |
| Barn Elms - phase two site information paper | Site information paper explaining our phase two consultation proposals for the site. The paper includes information on how the site was chosen, our potential use of the site, the proposed future use of the site and operational issues. | PDF (32 pages) |
| Barn Elms display board | A visual board showing location plans, construction layouts, and post-construction visuals of the proposed site at Barn Elms. | PDF (1 pages) |
| Beckton Sewage Treatment Works - phase two site information paper | Site information paper explaining our phase two consultation proposals for the site. The paper includes information on how the site was chosen, our potential use of the site, the proposed future use of the site and operational issues. | PDF (16 pages) |
| Beckton Sewage Treatment Works display board | A visual board showing location plans, construction layouts, and post-construction visuals of the proposed site at Beckton Sewage Treatment Works. | PDF (1 pages) |
| Bekesbourne Street - phase two site information paper | Site information paper explaining our phase two consultation proposals for the site. The paper includes information on how the site was chosen, our potential use of the site, the proposed future use of the site and operational issues. | PDF (12 pages) |
| Blackfriars Bridge Foreshore - phase two site information paper | Site information paper explaining our phase two consultation proposals for the site. The paper includes information on how the site was chosen, our potential use of the site, the proposed future use of the site and operational issues. | PDF (32 pages) |
| Blackfriars Bridge Foreshore display board | A visual board showing location plans, construction layouts, and post-construction visuals of the proposed site at Blackfriars Bridge Foreshore. | PDF (1 pages) |
| Book of plans - Abbey Mills Pumping Station | Plans depicting detailed aspects of potential sites including existing and proposed features along with elevations and sections. | PDF (5 pages) |
| Book of plans - Acton Storm Tanks | Plans depicting detailed aspects of potential sites including existing and proposed features along with elevations and sections. | PDF (5 pages) |
| Book of plans - Albert Embankment Foreshore | Plans depicting detailed aspects of potential sites including existing and proposed features along with elevations and sections. | PDF (6 pages) |
| Book of plans - Barn Elms | Plans depicting detailed aspects of potential sites including existing and proposed features along with elevations and sections. | PDF (5 pages) |
| Book of plans - Beckton Sewage Treatment Works | Plans depicting detailed aspects of potential sites including existing and proposed features along with elevations and sections. | PDF (4 pages) |
| Book of plans - Blackfriars Bridge Foreshore | Plans depicting detailed aspects of potential sites including existing and proposed features along with elevations and sections. | PDF (7 pages) |
| Book of plans - Carnwath Road Riverside | Plans depicting detailed aspects of potential sites including existing and proposed features along with elevations and sections. | PDF (5 pages) |
| Book of plans - Chambers Wharf | Plans depicting detailed aspects of potential sites including existing and proposed features along with elevations and sections. | PDF (5 pages) |
| Book of plans - Chelsea Embankment Foreshore | Plans depicting detailed aspects of potential sites including existing and proposed features along with elevations and sections. | PDF (6 pages) |
| Book of plans - Cremorne Wharf Depot | Plans depicting detailed aspects of potential sites including existing and proposed features along with elevations and sections. | PDF (5 pages) |
| Book of plans - Deptford Church Street | Plans depicting detailed aspects of potential sites including existing and proposed features along with elevations and sections. | PDF (5 pages) |
| Book of plans - Dormay Street | Plans depicting detailed aspects of potential sites including existing and proposed features along with elevations and sections. | PDF (5 pages) |
| Book of plans - Earl Pumping Station | Plans depicting detailed aspects of potential sites including existing and proposed features along with elevations and sections. | PDF (5 pages) |
| Book of plans - Falconbrook Pumping Station | Plans depicting detailed aspects of potential sites including existing and proposed features along with elevations and sections. | PDF (5 pages) |
| Book of plans - Greenwich Pumping Station | Plans depicting detailed aspects of potential sites including existing and proposed features along with elevations and sections. | PDF (7 pages) |
| Book of plans - Hammersmith Pumping Station | Plans depicting detailed aspects of potential sites including existing and proposed features along with elevations and sections. | PDF (5 pages) |
| Book of plans - Heathwall Pumping Station | Plans depicting detailed aspects of potential sites including existing and proposed features along with elevations and sections. | PDF (5 pages) |
| Book of plans - King Edward Memorial Park Foreshore | Plans depicting detailed aspects of potential sites including existing and proposed features along with elevations and sections. | PDF (5 pages) |
| Book of plans - King George's Park | Plans depicting detailed aspects of potential sites including existing and proposed features along with elevations and sections. | PDF (5 pages) |
| Book of plans - Kirtling Street | Plans depicting detailed aspects of potential sites including existing and proposed features along with elevations and sections. | PDF (5 pages) |
| Book of plans - Putney Bridge Foreshore | Plans depicting detailed aspects of potential sites including existing and proposed features along with elevations and sections. | PDF (5 pages) |
| Book of plans - Shad Thames Pumping Station | Plans depicting detailed aspects of potential sites including existing and proposed features along with elevations and sections. | PDF (5 pages) |
| Book of plans - Victoria Embankment Foreshore | Plans depicting detailed aspects of potential sites including existing and proposed features along with elevations and sections. | PDF (6 pages) |
| Build - How we will build the tunnel | Project information paper explaining how the Thames Tunnel will be built. | PDF (7 pages) |
| Carnwath Road Riverside - phase two site information paper | Site information paper explaining our phase two consultation proposals for the site. The paper includes information on how the site was chosen, our potential use of the site, the proposed future use of the site and operational issues. | PDF (36 pages) |
| Carnwath Road Riverside display board | A visual board showing location plans, construction layouts, and post-construction visuals of the proposed site at Carnwath Road Riverside. | PDF (1 pages) |
| Chambers Wharf - phase two site information paper | Site information paper explaining our phase two consultation proposals for the site. The paper includes information on how the site was chosen, our potential use of the site, the proposed future use of the site and operational issues. | PDF (36 pages) |
| Chambers Wharf display board | A visual board showing location plans, construction layouts, and post-construction visuals of the proposed site at Chambers Wharf. | PDF (1 pages) |
| Changes - The changes since phase one consultation | Project information paper explaining the changes that have been made to our proposals since phase one consultation. | PDF (7 pages) |
| Chelsea Embankment Foreshore - phase two site information paper | Site information paper explaining our phase two consultation proposals for the site. The paper includes information on how the site was chosen, our potential use of the site, the proposed future use of the site and operational issues. | PDF (32 pages) |
| Chelsea Embankment Foreshore display board | A visual board showing location plans, construction layouts, and post-construction visuals of the proposed site at Chelsea Embankment Foreshore. | PDF (1 pages) |
| Code of Construction Practice - Part A: General requirements | The Code of construction practice Part A: General requirements sets out a series of objectives and measures to be applied throughout the construction period. | PDF (88 pages) |
| Combined sewer overflow sites display board | A display board showing an illustrative representation of what a combined sewer overflow (CSO) site might look like. | PDF (1 pages) |
| Community consultation strategy | Sets out our approach and timetable for consulting key stakeholders and those with an interest in the project. | PDF (37 pages) |
| Consultation - Our approach to consultation | Project information paper explaining our approach to consultation on the Thames Tunnel. | PDF (4 pages) |
| Costs and Benefits of the Thames Tunnel | This annex sets out more detail on the high-level calculations which have been performed by Defra to update the monetary costs and benefits of the Thames Tunnel first estimated in 2007. It is accompanied by a table breaking down the results of the analysis by cost and benefit category (see Table 1 at the end of the Annex). | PDF (8 pages) |
| Creating a River Thames fit for our future | This document summarises the strategic and economic case for the Thames Tunnel and explains why Defra believes that a tunnel remains the preferred solution for dealing adequately with the untreated sewage that is polluting the River Thames. This provides an update to the 2007 regulatory impact assessment and takes into account data emerging since that time. | PDF (18 pages) |
| Cremorne Wharf Depot - phase two site information paper | Site information paper explaining our phase two consultation proposals for the site. The paper includes information on how the site was chosen, our potential use of the site, the proposed future use of the site and operational issues. | PDF (32 pages) |
| Cremorne Wharf Depot display board | A visual board showing location plans, construction layouts, and post-construction visuals of the proposed site at Cremorne Wharf Depot. | PDF (1 pages) |
| Customer Overview Leaflet | Overview leaflet highlighting the need for the Thames Tunnel and the proposed solution. Leaflet includes a map of London showing the potential worksites and the route of the preferred tunnel alignment. | PDF (4 pages) |
| Deptford Church Street - phase two site information paper | Site information paper explaining our phase two consultation proposals for the site. The paper includes information on how the site was chosen, our potential use of the site, the proposed future use of the site and operational issues. | PDF (32 pages) |
| Design - Our approach to design | Project information paper explaining our approach to design for the above ground structures of the Thames Tunnel. | PDF (4 pages) |
| Design development report - Appendix A - Acton Storm Tanks | The process behind the development of the proposed designs of the permanent above-ground elements of the Thames Tunnel project as well as how these new elements would be integrated into their surrounding environment. The above-ground elements include ventilation structures or columns, ventilation buildings, electrical and control kiosks and potential new public space, footpaths and landscaping. | PDF (12 pages) |
| Design development report - Appendix B - Hammersmith Pumping Station | The process behind the development of the proposed designs of the permanent above-ground elements of the Thames Tunnel project as well as how these new elements would be integrated into their surrounding environment. The above-ground elements include ventilation structures or columns, ventilation buildings, electrical and control kiosks and potential new public space, footpaths and landscaping. | PDF (10 pages) |
| Design development report - Appendix C - Barn Elms | The process behind the development of the proposed designs of the permanent above-ground elements of the Thames Tunnel project as well as how these new elements would be integrated into their surrounding environment. The above-ground elements include ventilation structures or columns, ventilation buildings, electrical and control kiosks and potential new public space, footpaths and landscaping. | PDF (12 pages) |
| Design development report - Appendix D - Putney Bridge | The process behind the development of the proposed designs of the permanent above-ground elements of the Thames Tunnel project as well as how these new elements would be integrated into their surrounding environment. The above-ground elements include ventilation structures or columns, ventilation buildings, electrical and control kiosks and potential new public space, footpaths and landscaping. | PDF (12 pages) |
| Design development report - Appendix E - Dormay Street | The process behind the development of the proposed designs of the permanent above-ground elements of the Thames Tunnel project as well as how these new elements would be integrated into their surrounding environment. The above-ground elements include ventilation structures or columns, ventilation buildings, electrical and control kiosks and potential new public space, footpaths and landscaping. | PDF (10 pages) |
| Design development report - Appendix F - King George's Park | The process behind the development of the proposed designs of the permanent above-ground elements of the Thames Tunnel project as well as how these new elements would be integrated into their surrounding environment. The above-ground elements include ventilation structures or columns, ventilation buildings, electrical and control kiosks and potential new public space, footpaths and landscaping. | PDF (12 pages) |
| Design development report - Appendix G - Carnwath Road Riverside | The process behind the development of the proposed designs of the permanent above-ground elements of the Thames Tunnel project as well as how these new elements would be integrated into their surrounding environment. The above-ground elements include ventilation structures or columns, ventilation buildings, electrical and control kiosks and potential new public space, footpaths and landscaping. | PDF (12 pages) |
| Design development report - Appendix H - Falconbrook Pumping Station | The process behind the development of the proposed designs of the permanent above-ground elements of the Thames Tunnel project as well as how these new elements would be integrated into their surrounding environment. The above-ground elements include ventilation structures or columns, ventilation buildings, electrical and control kiosks and potential new public space, footpaths and landscaping. | PDF (10 pages) |
| Design development report - Appendix J - Cremorne Wharf Depot | The process behind the development of the proposed designs of the permanent above-ground elements of the Thames Tunnel project as well as how these new elements would be integrated into their surrounding environment. The above-ground elements include ventilation structures or columns, ventilation buildings, electrical and control kiosks and potential new public space, footpaths and landscaping. | PDF (14 pages) |
| Design development report - Appendix K - Chelsea Embankment Foreshore | The process behind the development of the proposed designs of the permanent above-ground elements of the Thames Tunnel project as well as how these new elements would be integrated into their surrounding environment. The above-ground elements include ventilation structures or columns, ventilation buildings, electrical and control kiosks and potential new public space, footpaths and landscaping. | PDF (20 pages) |
| Design development report - Appendix L - Kirtling Street | The process behind the development of the proposed designs of the permanent above-ground elements of the Thames Tunnel project as well as how these new elements would be integrated into their surrounding environment. The above-ground elements include ventilation structures or columns, ventilation buildings, electrical and control kiosks and potential new public space, footpaths and landscaping. | PDF (10 pages) |
| Design development report - Appendix M - Heathwall Pumping Station | The process behind the development of the proposed designs of the permanent above-ground elements of the Thames Tunnel project as well as how these new elements would be integrated into their surrounding environment. The above-ground elements include ventilation structures or columns, ventilation buildings, electrical and control kiosks and potential new public space, footpaths and landscaping. | PDF (12 pages) |
| Design development report - Appendix N - Albert Embankment Foreshore | The process behind the development of the proposed designs of the permanent above-ground elements of the Thames Tunnel project as well as how these new elements would be integrated into their surrounding environment. The above-ground elements include ventilation structures or columns, ventilation buildings, electrical and control kiosks and potential new public space, footpaths and landscaping. | PDF (16 pages) |
| Design development report - Appendix P - Victoria Embankment Foreshore | The process behind the development of the proposed designs of the permanent above-ground elements of the Thames Tunnel project as well as how these new elements would be integrated into their surrounding environment. The above-ground elements include ventilation structures or columns, ventilation buildings, electrical and control kiosks and potential new public space, footpaths and landscaping. | PDF (18 pages) |
| Design development report - Appendix Q - Blackfriars Bridge Foreshore | The process behind the development of the proposed designs of the permanent above-ground elements of the Thames Tunnel project as well as how these new elements would be integrated into their surrounding environment. The above-ground elements include ventilation structures or columns, ventilation buildings, electrical and control kiosks and potential new public space, footpaths and landscaping. | PDF (18 pages) |
| Design development report - Appendix R - Chambers Wharf | The process behind the development of the proposed designs of the permanent above-ground elements of the Thames Tunnel project as well as how these new elements would be integrated into their surrounding environment. The above-ground elements include ventilation structures or columns, ventilation buildings, electrical and control kiosks and potential new public space, footpaths and landscaping. | PDF (10 pages) |
| Design development report - Appendix S - King Edward Memorial Park Foreshore | The process behind the development of the proposed designs of the permanent above-ground elements of the Thames Tunnel project as well as how these new elements would be integrated into their surrounding environment. The above-ground elements include ventilation structures or columns, ventilation buildings, electrical and control kiosks and potential new public space, footpaths and landscaping. | PDF (16 pages) |
| Design development report - Appendix T - Earl Pumping Station | The process behind the development of the proposed designs of the permanent above-ground elements of the Thames Tunnel project as well as how these new elements would be integrated into their surrounding environment. The above-ground elements include ventilation structures or columns, ventilation buildings, electrical and control kiosks and potential new public space, footpaths and landscaping. | PDF (12 pages) |
| Design development report - Appendix U - Deptford Church Street | The process behind the development of the proposed designs of the permanent above-ground elements of the Thames Tunnel project as well as how these new elements would be integrated into their surrounding environment. The above-ground elements include ventilation structures or columns, ventilation buildings, electrical and control kiosks and potential new public space, footpaths and landscaping. | PDF (12 pages) |
| Design development report - Appendix V - Greenwich Pumping Station | The process behind the development of the proposed designs of the permanent above-ground elements of the Thames Tunnel project as well as how these new elements would be integrated into their surrounding environment. The above-ground elements include ventilation structures or columns, ventilation buildings, electrical and control kiosks and potential new public space, footpaths and landscaping. | PDF (10 pages) |
| Design development report - Appendix W - Abbey Mills Pumping Station | The process behind the development of the proposed designs of the permanent above-ground elements of the Thames Tunnel project as well as how these new elements would be integrated into their surrounding environment. The above-ground elements include ventilation structures or columns, ventilation buildings, electrical and control kiosks and potential new public space, footpaths and landscaping. | PDF (10 pages) |
| Design development report - Appendix X - Beckton Sewage Treatment Works | The process behind the development of the proposed designs of the permanent above-ground elements of the Thames Tunnel project as well as how these new elements would be integrated into their surrounding environment. The above-ground elements include ventilation structures or columns, ventilation buildings, electrical and control kiosks and potential new public space, footpaths and landscaping. | PDF (10 pages) |
| Design development report - Appendix Y - Other works | The process behind the development of the proposed designs of the permanent above-ground elements of the Thames Tunnel project as well as how these new elements would be integrated into their surrounding environment. The above-ground elements include ventilation structures or columns, ventilation buildings, electrical and control kiosks and potential new public space, footpaths and landscaping. | PDF (7 pages) |
| Design development report - main report | The process behind the development of the proposed designs of the permanent above-ground elements of the Thames Tunnel project as well as how these new elements would be integrated into their surrounding environment. The above-ground elements include ventilation structures or columns, ventilation buildings, electrical and control kiosks and potential new public space, footpaths and landscaping. | PDF (46 pages) |
| Dormay Street - phase two site information paper | Site information paper explaining our phase two consultation proposals for the site. The paper includes information on how the site was chosen, our potential use of the site, the proposed future use of the site and operational issues. | PDF (32 pages) |
| Dormay Street display board | A visual board showing location plans, construction layouts, and post-construction visuals of the proposed site at Dormay Street. | PDF (1 pages) |
| Draft waste strategy | Provides information on how building materials and resulting waste, including excavated waste will be managed during construction of the Thames Tunnel. | PDF (97 pages) |
| Earl Pumping Station - phase two site information paper | Site information paper explaining our phase two consultation proposals for the site. The paper includes information on how the site was chosen, our potential use of the site, the proposed future use of the site and operational issues. | PDF (28 pages) |
| Earl Pumping Station display board | A visual board showing location plans, construction layouts, and post-construction visuals of the proposed site at Earl Pumping Station. | PDF (1 pages) |
| Environment | This paper explains the Environmental Impact Assessment (EIA) we are undertaking, to understand the environmental benefits and impacts the construction and operation of the Thames Tunnel project may have. It will also inform the project’s design. | PDF (6 pages) |
| Exhibition timetable | Timetable of drop-in exhibitions for phase two consultation. | PDF (1 pages) |
| Falconbrook Pumping Station - phase two site information paper | Site information paper explaining our phase two consultation proposals for the site. The paper includes information on how the site was chosen, our potential use of the site, the proposed future use of the site and operational issues. | PDF (32 pages) |
| Falconbrook Pumping Station display board | A visual board showing location plans, construction layouts, and post-construction visuals of the proposed site at Falconbrook Pumping Station. | PDF (1 pages) |
| Funding - How the project will be paid for | Project information paper explaining how the construction and operation of the Thames Tunnel will be funded. | PDF (2 pages) |
| Funding display board | A display board outlining how the Thames Tunnel would be paid for and what the cost impact will be for Thames Water customers. | PDF (1 pages) |
| Greenwich Pumping Station - phase two site information paper | Site information paper explaining our phase two consultation proposals for the site. The paper includes information on how the site was chosen, our potential use of the site, the proposed future use of the site and operational issues. | PDF (32 pages) |
| Guide to phase two consultation | Information guide explaining where to find information in the documents produced for phase two consultation on the Thames Tunnel. | PDF (6 pages) |
| Hammersmith & Fulham Tunnel News, January 2012 | The first issue of Tunnel News - a regular update about events, meetings and news for sites in the Hammersmith & Fulham area. | PDF (2 pages) |
| Hammersmith Pumping Station - phase two site information paper | Site information paper explaining our phase two consultation proposals for the site. The paper includes information on how the site was chosen, our potential use of the site, the proposed future use of the site and operational issues. | PDF (32 pages) |
| Hammersmith Pumping Station display board | A visual board showing location plans, construction layouts, and post-construction visuals of the proposed site at Hammersmith Pumping Station. | PDF (1 pages) |
| Heathwall Pumping Station - phase two site information paper | Site information paper explaining our phase two consultation proposals for the site. The paper includes information on how the site was chosen, our potential use of the site, the proposed future use of the site and operational issues. | PDF (32 pages) |
| Interim engagement report | This report provides a summary of feedback received from members of the public and other stakeholders in response to the interim engagement events undertaken between 11 March 2011 and 16 August 2011. | PDF (138 pages) |
| Interim engagement report addendum | An addendum to our Interim engagement report (summer 2011), which has been produced to reflect additional feedback that we have received since we completed our interim engagement; and to report on the findings of further interim engagement for Kirtling Street. | PDF (13 pages) |
| Jews Row - phase two site information paper | Information paper explaining how we no longer need to use the Jews Row site. | PDF (4 pages) |
| Key Plan | London wide map showing the preferred route of the tunnel and the locations of the phase preferred worksites at phase two consultation. | PDF (1 pages) |
| King Edward Memorial Park Foreshore - phase two site information paper | Site information paper explaining our phase two consultation proposals for the site. The paper includes information on how the site was chosen, our potential use of the site, the proposed future use of the site and operational issues. | PDF (36 pages) |
| King Edward Memorial Park Foreshore display board | A visual board showing location plans, construction layouts, and post-construction visuals of the proposed site at King Edward Memorial Park Foreshore. | PDF (1 pages) |
| King George's Park - phase two site information paper | Site information paper explaining our phase two consultation proposals for the site. The paper includes information on how the site was chosen, our potential use of the site, the proposed future use of the site and operational issues. | PDF (28 pages) |
| King George's Park display board | A visual board showing location plans, construction layouts, and post-construction visuals of the proposed site at King George's Park. | PDF (1 pages) |
| Kirtling Street - phase two site information paper | Site information paper explaining our phase two consultation proposals for the site. The paper includes information on how the site was chosen, our potential use of the site, the proposed future use of the site and operational issues. | PDF (32 pages) |
| Kirtling Street display board | A visual board showing location plans, construction layouts, and post-construction visuals of the proposed site at Kirtling Street. | PDF (1 pages) |
| Main tunnel sites display board | A display board showing an illustrative representative of what our main tunnel sites might look like. | PDF (1 pages) |
| Managing construction | Project information paper explaining how we will manage the potential effects of construction activity. | PDF (4 pages) |
| Managing construction display board | A display board outlining how we will manage construction impacts if the Thames Tunnel is built. | PDF (1 pages) |
| Map - East London | Map of East London showing preferred tunnel route, local CSOs, pumping stations and phase two consultation worksites. Please note this document is quite large in order to show the relevant level of detail. It may take a long time to download or view on a slow connection. | PDF (1 pages) |
| Map - West London | Map of West London showing preferred tunnel route, local CSOs, pumping stations and phase two consultation worksites. Please note this document is quite large in order to show the relevant level of detail. It may take a long time to download or view on a slow connection. | PDF (1 pages) |
| Odour - How we will control odour | Project information paper explaining how we intend to control odour. | PDF (5 pages) |
| Odour display board | A display board outlining our air management plan. | PDF (1 pages) |
| Options | Project information paper explaining the other options that were considered to reduce sewage overflows from London's Victorian sewerage system into the River Thames. | PDF (4 pages) |
| Options display board | A display board outlining the options to deal with sewage overflows that we have considered. | PDF (1 pages) |
| Other Works - phase two site information paper | Site information paper explaining our phase two consultation proposals other non site specific works. | PDF (8 pages) |
| Overflow | Information paper describing the problem of sewage overflows from London's Victorian sewerage system | PDF (2 pages) |
| Overflow display board | A display board outlining why we need to deal with the problem of sewage overflows in the River Thames. | PDF (1 pages) |
| PEIR Figures Volume 01-06 Part 01 | Figures to accompany the Preliminary environmental information report. | PDF (12 pages) |
| PEIR Figures Volume 01-06 Part 02 | Figures to accompany the Preliminary environmental information report. | PDF (14 pages) |
| PEIR Figures Volume 01-06 Part 03 | Figures to accompany the Preliminary environmental information report. | PDF (12 pages) |
| PEIR Figures Volume 01-06 Part 04 | Figures to accompany the Preliminary environmental information report. | PDF (11 pages) |
| PEIR Figures Volume 01-06 Part 05 | Figures to accompany the Preliminary environmental information report. | PDF (7 pages) |
| PEIR Figures Volume 01-06 Part 06 | Figures to accompany the Preliminary environmental information report. | PDF (6 pages) |
| PEIR Figures Volume 07 - Acton Storm Tanks - Part 01 | Figures to accompany the Preliminary environmental information report. | PDF (8 pages) |
| PEIR Figures Volume 07 - Acton Storm Tanks - Part 02 | Figures to accompany the Preliminary environmental information report. | PDF (26 pages) |
| PEIR Figures Volume 08 - Hammersmith Pumping Station - Part 01 | Figures to accompany the Preliminary environmental information report. | PDF (14 pages) |
| PEIR Figures Volume 08 - Hammersmith Pumping Station - Part 02 | Figures to accompany the Preliminary environmental information report. | PDF (18 pages) |
| PEIR Figures Volume 09 - Barn Elms - Part 01 | Figures to accompany the Preliminary environmental information report. | PDF (10 pages) |
| PEIR Figures Volume 09 - Barn Elms - Part 02 | Figures to accompany the Preliminary environmental information report. | PDF (24 pages) |
| PEIR Figures Volume 10 - Putney Bridge Foreshore - Part 01 | Figures to accompany the Preliminary environmental information report. | PDF (12 pages) |
| PEIR Figures Volume 10 - Putney Bridge Foreshore - Part 02 | Figures to accompany the Preliminary environmental information report. | PDF (25 pages) |
| PEIR Figures Volume 11 - Dormay Street | Figures to accompany the Preliminary environmental information report. | PDF (33 pages) |
| PEIR Figures Volume 12 - King George's Park | Figures to accompany the Preliminary environmental information report. | PDF (33 pages) |
| PEIR Figures Volume 13 - Carnwath Road Riverside | Figures to accompany the Preliminary environmental information report. | PDF (32 pages) |
| PEIR Figures Volume 14 - Falconbrook Pumping Station | Figures to accompany the Preliminary environmental information report. | PDF (30 pages) |
| PEIR Figures Volume 15 - Cremorne Wharf Depot - Part 01 | Figures to accompany the Preliminary environmental information report. | PDF (16 pages) |
| PEIR Figures Volume 15 - Cremorne Wharf Depot - Part 02 | Figures to accompany the Preliminary environmental information report. | PDF (15 pages) |
| PEIR Figures Volume 16 - Chelsea Embankment Foreshore - Part 01 | Figures to accompany the Preliminary environmental information report. | PDF (10 pages) |
| PEIR Figures Volume 16 - Chelsea Embankment Foreshore - Part 02 | Figures to accompany the Preliminary environmental information report. | PDF (27 pages) |
| PEIR Figures Volume 17 - Kirtling Street - Part 01 | Figures to accompany the Preliminary environmental information report. | PDF (16 pages) |
| PEIR Figures Volume 17 - Kirtling Street - Part 02 | Figures to accompany the Preliminary environmental information report. | PDF (17 pages) |
| PEIR Figures Volume 18 - Heathwall Pumping Station | Figures to accompany the Preliminary environmental information report. | PDF (33 pages) |
| PEIR Figures Volume 19 - Albert Embankment Foreshore - Part 01 | Figures to accompany the Preliminary environmental information report. | PDF (10 pages) |
| PEIR Figures Volume 19 - Albert Embankment Foreshore - Part 02 | Figures to accompany the Preliminary environmental information report. | PDF (27 pages) |
| PEIR Figures Volume 20 - Victoria Embankment Foreshore - Part 01 | Figures to accompany the Preliminary environmental information report. | PDF (16 pages) |
| PEIR Figures Volume 20 - Victoria Embankment Foreshore - Part 02 | Figures to accompany the Preliminary environmental information report. | PDF (18 pages) |
| PEIR Figures Volume 21 - Blackfriars Bridge Foreshore - Part 01 | Figures to accompany the Preliminary environmental information report. | PDF (18 pages) |
| PEIR Figures Volume 21 - Blackfriars Bridge Foreshore - Part 02 | Figures to accompany the Preliminary environmental information report. | PDF (19 pages) |
| PEIR Figures Volume 22 - Chambers Wharf | Figures to accompany the Preliminary environmental information report. | PDF (34 pages) |
| PEIR Figures Volume 23 - King Edward Memorial Park Foreshore - Part 01 | Figures to accompany the Preliminary environmental information report. | PDF (10 pages) |
| PEIR Figures Volume 23 - King Edward Memorial Park Foreshore - Part 02 | Figures to accompany the Preliminary environmental information report. | PDF (22 pages) |
| PEIR Figures Volume 24 - Earl Pumping Station | Figures to accompany the Preliminary environmental information report. | PDF (31 pages) |
| PEIR Figures Volume 25 - Deptford Church Street | Figures to accompany the Preliminary environmental information report. | PDF (32 pages) |
| PEIR Figures Volume 26 - Greenwich Pumping Station | Figures to accompany the Preliminary environmental information report. | PDF (10 pages) |
| PEIR Figures Volume 27 - Abbey Mills Pumping Station | Figures to accompany the Preliminary environmental information report. | PDF (31 pages) |
| PEIR Figures Volume 28 - Beckton Sewage Treatment Works | Figures to accompany the Preliminary environmental information report. | PDF (26 pages) |
| PEIR Main report - Volume 01 - Introduction | Preliminary environmental information supporting phase two consultation. It provides a snap shot in time during the environmental impact assessment (EIA) process to facilitate effective consultation. It provides information on the anticipated development associated with the Thames Tunnel project, including construction sites, tunnel components, operational infrastructure and other ancillary work sites. | PDF (48 pages) |
| PEIR Main report - Volume 02 - Proposed development | Preliminary environmental information supporting phase two consultation. It provides a snap shot in time during the environmental impact assessment (EIA) process to facilitate effective consultation. It provides information on the anticipated development associated with the Thames Tunnel project, including construction sites, tunnel components, operational infrastructure and other ancillary work sites. | PDF (161 pages) |
| PEIR Main report - Volume 03 - Alternatives | Preliminary environmental information supporting phase two consultation. It provides a snap shot in time during the environmental impact assessment (EIA) process to facilitate effective consultation. It provides information on the anticipated development associated with the Thames Tunnel project, including construction sites, tunnel components, operational infrastructure and other ancillary work sites. | PDF (79 pages) |
| PEIR Main report - Volume 04 - Scoping opinions and technical engagement | Preliminary environmental information supporting phase two consultation. It provides a snap shot in time during the environmental impact assessment (EIA) process to facilitate effective consultation. It provides information on the anticipated development associated with the Thames Tunnel project, including construction sites, tunnel components, operational infrastructure and other ancillary work sites. | PDF (148 pages) |
| PEIR Main report - Volume 05 - Assessment methodology | Preliminary environmental information supporting phase two consultation. It provides a snap shot in time during the environmental impact assessment (EIA) process to facilitate effective consultation. It provides information on the anticipated development associated with the Thames Tunnel project, including construction sites, tunnel components, operational infrastructure and other ancillary work sites. | PDF (320 pages) |
| PEIR Main report - Volume 05 - Assessment methodology (Appendix A) | The Code of construction practice Part A: General requirements sets out a series of objectives and measures to be applied throughout the construction period. | PDF (88 pages) |
| PEIR Main report - Volume 06 - Project-wide assessment | Preliminary environmental information supporting phase two consultation. It provides a snap shot in time during the environmental impact assessment (EIA) process to facilitate effective consultation. It provides information on the anticipated development associated with the Thames Tunnel project, including construction sites, tunnel components, operational infrastructure and other ancillary work sites. | PDF (267 pages) |
| PEIR Main report - Volume 07 - Acton Storm Tanks | Preliminary environmental information supporting phase two consultation. It provides a snap shot in time during the environmental impact assessment (EIA) process to facilitate effective consultation. It provides information on the anticipated development associated with the Thames Tunnel project, including construction sites, tunnel components, operational infrastructure and other ancillary work sites. | PDF (322 pages) |
| PEIR Main report - Volume 08 - Hammersmith Pumping Station | Preliminary environmental information supporting phase two consultation. It provides a snap shot in time during the environmental impact assessment (EIA) process to facilitate effective consultation. It provides information on the anticipated development associated with the Thames Tunnel project, including construction sites, tunnel components, operational infrastructure and other ancillary work sites. | PDF (311 pages) |
| PEIR Main report - Volume 09 - Barn Elms | Preliminary environmental information supporting phase two consultation. It provides a snap shot in time during the environmental impact assessment (EIA) process to facilitate effective consultation. It provides information on the anticipated development associated with the Thames Tunnel project, including construction sites, tunnel components, operational infrastructure and other ancillary work sites. | PDF (354 pages) |
| PEIR Main report - Volume 10 - Putney Bridge Foreshore | Preliminary environmental information supporting phase two consultation. It provides a snap shot in time during the environmental impact assessment (EIA) process to facilitate effective consultation. It provides information on the anticipated development associated with the Thames Tunnel project, including construction sites, tunnel components, operational infrastructure and other ancillary work sites. | PDF (407 pages) |
| PEIR Main report - Volume 11 - Dormay Street | Preliminary environmental information supporting phase two consultation. It provides a snap shot in time during the environmental impact assessment (EIA) process to facilitate effective consultation. It provides information on the anticipated development associated with the Thames Tunnel project, including construction sites, tunnel components, operational infrastructure and other ancillary work sites. | PDF (325 pages) |
| PEIR Main report - Volume 12 - King George's Park | Preliminary environmental information supporting phase two consultation. It provides a snap shot in time during the environmental impact assessment (EIA) process to facilitate effective consultation. It provides information on the anticipated development associated with the Thames Tunnel project, including construction sites, tunnel components, operational infrastructure and other ancillary work sites. | PDF (323 pages) |
| PEIR Main report - Volume 13 - Carnwath Road Riverside | Preliminary environmental information supporting phase two consultation. It provides a snap shot in time during the environmental impact assessment (EIA) process to facilitate effective consultation. It provides information on the anticipated development associated with the Thames Tunnel project, including construction sites, tunnel components, operational infrastructure and other ancillary work sites. | PDF (355 pages) |
| PEIR Main report - Volume 14 - Falconbrook Pumping Station | Preliminary environmental information supporting phase two consultation. It provides a snap shot in time during the environmental impact assessment (EIA) process to facilitate effective consultation. It provides information on the anticipated development associated with the Thames Tunnel project, including construction sites, tunnel components, operational infrastructure and other ancillary work sites. | PDF (314 pages) |
| PEIR Main report - Volume 15 - Cremorne Wharf Depot | Preliminary environmental information supporting phase two consultation. It provides a snap shot in time during the environmental impact assessment (EIA) process to facilitate effective consultation. It provides information on the anticipated development associated with the Thames Tunnel project, including construction sites, tunnel components, operational infrastructure and other ancillary work sites. | PDF (346 pages) |
| PEIR Main report - Volume 16 - Chelsea Embankment Foreshore | Preliminary environmental information supporting phase two consultation. It provides a snap shot in time during the environmental impact assessment (EIA) process to facilitate effective consultation. It provides information on the anticipated development associated with the Thames Tunnel project, including construction sites, tunnel components, operational infrastructure and other ancillary work sites. | PDF (378 pages) |
| PEIR Main report - Volume 17 - Kirtling Street | Preliminary environmental information supporting phase two consultation. It provides a snap shot in time during the environmental impact assessment (EIA) process to facilitate effective consultation. It provides information on the anticipated development associated with the Thames Tunnel project, including construction sites, tunnel components, operational infrastructure and other ancillary work sites. | PDF (385 pages) |
| PEIR Main report - Volume 18 - Heathwall Pumping Station | Preliminary environmental information supporting phase two consultation. It provides a snap shot in time during the environmental impact assessment (EIA) process to facilitate effective consultation. It provides information on the anticipated development associated with the Thames Tunnel project, including construction sites, tunnel components, operational infrastructure and other ancillary work sites. | PDF (375 pages) |
| PEIR Main report - Volume 19 - Albert Embankment Foreshore | Preliminary environmental information supporting phase two consultation. It provides a snap shot in time during the environmental impact assessment (EIA) process to facilitate effective consultation. It provides information on the anticipated development associated with the Thames Tunnel project, including construction sites, tunnel components, operational infrastructure and other ancillary work sites. | PDF (395 pages) |
| PEIR Main report - Volume 20 - Victoria Embankment Foreshore | Preliminary environmental information supporting phase two consultation. It provides a snap shot in time during the environmental impact assessment (EIA) process to facilitate effective consultation. It provides information on the anticipated development associated with the Thames Tunnel project, including construction sites, tunnel components, operational infrastructure and other ancillary work sites. | PDF (399 pages) |
| PEIR Main report - Volume 21 - Blackfriars Bridge Foreshore | Preliminary environmental information supporting phase two consultation. It provides a snap shot in time during the environmental impact assessment (EIA) process to facilitate effective consultation. It provides information on the anticipated development associated with the Thames Tunnel project, including construction sites, tunnel components, operational infrastructure and other ancillary work sites. | PDF (413 pages) |
| PEIR Main report - Volume 22 - Chambers Wharf | Preliminary environmental information supporting phase two consultation. It provides a snap shot in time during the environmental impact assessment (EIA) process to facilitate effective consultation. It provides information on the anticipated development associated with the Thames Tunnel project, including construction sites, tunnel components, operational infrastructure and other ancillary work sites. | PDF (353 pages) |
| PEIR Main report - Volume 23 - King Edward Memorial Park Foreshore | Preliminary environmental information supporting phase two consultation. It provides a snap shot in time during the environmental impact assessment (EIA) process to facilitate effective consultation. It provides information on the anticipated development associated with the Thames Tunnel project, including construction sites, tunnel components, operational infrastructure and other ancillary work sites. | PDF (402 pages) |
| PEIR Main report - Volume 24 - Earl Pumping Station | Preliminary environmental information supporting phase two consultation. It provides a snap shot in time during the environmental impact assessment (EIA) process to facilitate effective consultation. It provides information on the anticipated development associated with the Thames Tunnel project, including construction sites, tunnel components, operational infrastructure and other ancillary work sites. | PDF (307 pages) |
| PEIR Main report - Volume 25 - Deptford Church Street | Preliminary environmental information supporting phase two consultation. It provides a snap shot in time during the environmental impact assessment (EIA) process to facilitate effective consultation. It provides information on the anticipated development associated with the Thames Tunnel project, including construction sites, tunnel components, operational infrastructure and other ancillary work sites. | PDF (326 pages) |
| PEIR Main report - Volume 26 - Greenwich Pumping Station | Preliminary environmental information supporting phase two consultation. It provides a snap shot in time during the environmental impact assessment (EIA) process to facilitate effective consultation. It provides information on the anticipated development associated with the Thames Tunnel project, including construction sites, tunnel components, operational infrastructure and other ancillary work sites. | PDF (347 pages) |
| PEIR Main report - Volume 27 - Abbey Mills Pumping Station | Preliminary environmental information supporting phase two consultation. It provides a snap shot in time during the environmental impact assessment (EIA) process to facilitate effective consultation. It provides information on the anticipated development associated with the Thames Tunnel project, including construction sites, tunnel components, operational infrastructure and other ancillary work sites. | PDF (291 pages) |
| PEIR Main report - Volume 28 - Beckton Sewage Treatment Works | Preliminary environmental information supporting phase two consultation. It provides a snap shot in time during the environmental impact assessment (EIA) process to facilitate effective consultation. It provides information on the anticipated development associated with the Thames Tunnel project, including construction sites, tunnel components, operational infrastructure and other ancillary work sites. | PDF (230 pages) |
| PEIR Non-technical summary - Section 01-05 | Non-technical summary of the preliminary environmental information, which supports phase two consultation. It provides a snap shot in time during the environmental impact assessment (EIA) process to facilitate effective consultation. | PDF (37 pages) |
| PEIR Non-technical summary - Section 01-05 (Figure 28.1) | Non-technical summary of the preliminary environmental information, which supports phase two consultation. It provides a snap shot in time during the environmental impact assessment (EIA) process to facilitate effective consultation. | PDF (3 pages) |
| PEIR Non-technical summary - Section 06 - Acton Storm Tanks | Non-technical summary of the preliminary environmental information, which supports phase two consultation. It provides a snap shot in time during the environmental impact assessment (EIA) process to facilitate effective consultation. | PDF (14 pages) |
| PEIR Non-technical summary - Section 07 - Hammersmith Pumping Station | Non-technical summary of the preliminary environmental information, which supports phase two consultation. It provides a snap shot in time during the environmental impact assessment (EIA) process to facilitate effective consultation. | PDF (14 pages) |
| PEIR Non-technical summary - Section 08 - Barn Elms | Non-technical summary of the preliminary environmental information, which supports phase two consultation. It provides a snap shot in time during the environmental impact assessment (EIA) process to facilitate effective consultation. | PDF (14 pages) |
| PEIR Non-technical summary - Section 09 - Putney Bridge Foreshore | Non-technical summary of the preliminary environmental information, which supports phase two consultation. It provides a snap shot in time during the environmental impact assessment (EIA) process to facilitate effective consultation. | PDF (16 pages) |
| PEIR Non-technical summary - Section 10 - Dormay Street | Non-technical summary of the preliminary environmental information, which supports phase two consultation. It provides a snap shot in time during the environmental impact assessment (EIA) process to facilitate effective consultation. | PDF (14 pages) |
| PEIR Non-technical summary - Section 11 - King George's Park | Non-technical summary of the preliminary environmental information, which supports phase two consultation. It provides a snap shot in time during the environmental impact assessment (EIA) process to facilitate effective consultation. | PDF (14 pages) |
| PEIR Non-technical summary - Section 12 - Carnwath Road Riverside | Non-technical summary of the preliminary environmental information, which supports phase two consultation. It provides a snap shot in time during the environmental impact assessment (EIA) process to facilitate effective consultation. | PDF (15 pages) |
| PEIR Non-technical summary - Section 13 - Falconbrook Pumping Station | Non-technical summary of the preliminary environmental information, which supports phase two consultation. It provides a snap shot in time during the environmental impact assessment (EIA) process to facilitate effective consultation. | PDF (13 pages) |
| PEIR Non-technical summary - Section 14 - Cremorne Wharf Depot | Non-technical summary of the preliminary environmental information, which supports phase two consultation. It provides a snap shot in time during the environmental impact assessment (EIA) process to facilitate effective consultation. | PDF (13 pages) |
| PEIR Non-technical summary - Section 15 - Chelsea Embankment Foreshore | Non-technical summary of the preliminary environmental information, which supports phase two consultation. It provides a snap shot in time during the environmental impact assessment (EIA) process to facilitate effective consultation. | PDF (14 pages) |
| PEIR Non-technical summary - Section 16 - Kirtling Street | Non-technical summary of the preliminary environmental information, which supports phase two consultation. It provides a snap shot in time during the environmental impact assessment (EIA) process to facilitate effective consultation. | PDF (14 pages) |
| PEIR Non-technical summary - Section 17 - Heathwall Pumping Station | Non-technical summary of the preliminary environmental information, which supports phase two consultation. It provides a snap shot in time during the environmental impact assessment (EIA) process to facilitate effective consultation. | PDF (14 pages) |
| PEIR Non-technical summary - Section 18 - Albert Embankment Foreshore | Non-technical summary of the preliminary environmental information, which supports phase two consultation. It provides a snap shot in time during the environmental impact assessment (EIA) process to facilitate effective consultation. | PDF (17 pages) |
| PEIR Non-technical summary - Section 19 - Victoria Embankment Foreshore | Non-technical summary of the preliminary environmental information, which supports phase two consultation. It provides a snap shot in time during the environmental impact assessment (EIA) process to facilitate effective consultation. | PDF (14 pages) |
| PEIR Non-technical summary - Section 20 - Blackfriars Bridge Foreshore | Non-technical summary of the preliminary environmental information, which supports phase two consultation. It provides a snap shot in time during the environmental impact assessment (EIA) process to facilitate effective consultation. | PDF (15 pages) |
| PEIR Non-technical summary - Section 21 - Chambers Wharf | Non-technical summary of the preliminary environmental information, which supports phase two consultation. It provides a snap shot in time during the environmental impact assessment (EIA) process to facilitate effective consultation. | PDF (14 pages) |
| PEIR Non-technical summary - Section 22 - King Edward Memorial Park Foreshore | Non-technical summary of the preliminary environmental information, which supports phase two consultation. It provides a snap shot in time during the environmental impact assessment (EIA) process to facilitate effective consultation. | PDF (14 pages) |
| PEIR Non-technical summary - Section 23 - Earl Pumping Station | Non-technical summary of the preliminary environmental information, which supports phase two consultation. It provides a snap shot in time during the environmental impact assessment (EIA) process to facilitate effective consultation. | PDF (12 pages) |
| PEIR Non-technical summary - Section 24 - Deptford Church Street | Non-technical summary of the preliminary environmental information, which supports phase two consultation. It provides a snap shot in time during the environmental impact assessment (EIA) process to facilitate effective consultation. | PDF (13 pages) |
| PEIR Non-technical summary - Section 25 - Greenwich Pumping Station | Non-technical summary of the preliminary environmental information, which supports phase two consultation. It provides a snap shot in time during the environmental impact assessment (EIA) process to facilitate effective consultation. | PDF (14 pages) |
| PEIR Non-technical summary - Section 26 - Abbey Mills Pumping Station | Non-technical summary of the preliminary environmental information, which supports phase two consultation. It provides a snap shot in time during the environmental impact assessment (EIA) process to facilitate effective consultation. | PDF (13 pages) |
| PEIR Non-technical summary - Section 27 - Beckton Sewage Treatment Works | Non-technical summary of the preliminary environmental information, which supports phase two consultation. It provides a snap shot in time during the environmental impact assessment (EIA) process to facilitate effective consultation. | PDF (11 pages) |
| Phase two preferred scheme display board | A display board showing a map of our phase two preferred tunnel route and worksites. | PDF (1 pages) |
| Phase two scheme development report | This report sets out the work we have undertaken since phase one consultation. It describes how the scheme has evolved in the intervening period and how we have used the responses we received from the phase one consultation, alongside ongoing engineering scheme design work and information on changes in circumstances, to update the proposals that we are publicising during our phase two consultation period. | PDF (100 pages) |
| Phase two scheme development report - Appendix A - Acton Storm Tanks | This report sets out the work we have undertaken since phase one consultation. It describes how the scheme has evolved in the intervening period and how we have used the responses we received from the phase one consultation, alongside ongoing engineering scheme design work and information on changes in circumstances, to update the proposals that we are publicising during our phase two consultation period. | PDF (24 pages) |
| Phase two scheme development report - Appendix B - Hammersmith Pumping Station | This report sets out the work we have undertaken since phase one consultation. It describes how the scheme has evolved in the intervening period and how we have used the responses we received from the phase one consultation, alongside ongoing engineering scheme design work and information on changes in circumstances, to update the proposals that we are publicising during our phase two consultation period. | PDF (22 pages) |
| Phase two scheme development report - Appendix C - Barn Elms | This report sets out the work we have undertaken since phase one consultation. It describes how the scheme has evolved in the intervening period and how we have used the responses we received from the phase one consultation, alongside ongoing engineering scheme design work and information on changes in circumstances, to update the proposals that we are publicising during our phase two consultation period. | PDF (18 pages) |
| Phase two scheme development report - Appendix D - Putney Bridge | This report sets out the work we have undertaken since phase one consultation. It describes how the scheme has evolved in the intervening period and how we have used the responses we received from the phase one consultation, alongside ongoing engineering scheme design work and information on changes in circumstances, to update the proposals that we are publicising during our phase two consultation period. | PDF (14 pages) |
| Phase two scheme development report - Appendix E - Dormay Street | This report sets out the work we have undertaken since phase one consultation. It describes how the scheme has evolved in the intervening period and how we have used the responses we received from the phase one consultation, alongside ongoing engineering scheme design work and information on changes in circumstances, to update the proposals that we are publicising during our phase two consultation period. | PDF (18 pages) |
| Phase two scheme development report - Appendix F - King George's Park | This report sets out the work we have undertaken since phase one consultation. It describes how the scheme has evolved in the intervening period and how we have used the responses we received from the phase one consultation, alongside ongoing engineering scheme design work and information on changes in circumstances, to update the proposals that we are publicising during our phase two consultation period. | PDF (12 pages) |
| Phase two scheme development report - Appendix G - Carnwath Road Riverside | This report sets out the work we have undertaken since phase one consultation. It describes how the scheme has evolved in the intervening period and how we have used the responses we received from the phase one consultation, alongside ongoing engineering scheme design work and information on changes in circumstances, to update the proposals that we are publicising during our phase two consultation period. | PDF (30 pages) |
| Phase two scheme development report - Appendix H - Falconbrook Pumping Station | This report sets out the work we have undertaken since phase one consultation. It describes how the scheme has evolved in the intervening period and how we have used the responses we received from the phase one consultation, alongside ongoing engineering scheme design work and information on changes in circumstances, to update the proposals that we are publicising during our phase two consultation period. | PDF (18 pages) |
| Phase two scheme development report - Appendix J - Cremorne Wharf Depot | This report sets out the work we have undertaken since phase one consultation. It describes how the scheme has evolved in the intervening period and how we have used the responses we received from the phase one consultation, alongside ongoing engineering scheme design work and information on changes in circumstances, to update the proposals that we are publicising during our phase two consultation period. | PDF (14 pages) |
| Phase two scheme development report - Appendix K - Chelsea Embankment Foreshore | This report sets out the work we have undertaken since phase one consultation. It describes how the scheme has evolved in the intervening period and how we have used the responses we received from the phase one consultation, alongside ongoing engineering scheme design work and information on changes in circumstances, to update the proposals that we are publicising during our phase two consultation period. | PDF (18 pages) |
| Phase two scheme development report - Appendix L - Kirtling Street | This report sets out the work we have undertaken since phase one consultation. It describes how the scheme has evolved in the intervening period and how we have used the responses we received from the phase one consultation, alongside ongoing engineering scheme design work and information on changes in circumstances, to update the proposals that we are publicising during our phase two consultation period. | PDF (42 pages) |
| Phase two scheme development report - Appendix M - Heathwall Pumping Station | This report sets out the work we have undertaken since phase one consultation. It describes how the scheme has evolved in the intervening period and how we have used the responses we received from the phase one consultation, alongside ongoing engineering scheme design work and information on changes in circumstances, to update the proposals that we are publicising during our phase two consultation period. | PDF (18 pages) |
| Phase two scheme development report - Appendix N - Albert Embankment Foreshore | This report sets out the work we have undertaken since phase one consultation. It describes how the scheme has evolved in the intervening period and how we have used the responses we received from the phase one consultation, alongside ongoing engineering scheme design work and information on changes in circumstances, to update the proposals that we are publicising during our phase two consultation period. | PDF (18 pages) |
| Phase two scheme development report - Appendix P - Victoria Embankment Foreshore | This report sets out the work we have undertaken since phase one consultation. It describes how the scheme has evolved in the intervening period and how we have used the responses we received from the phase one consultation, alongside ongoing engineering scheme design work and information on changes in circumstances, to update the proposals that we are publicising during our phase two consultation period. | PDF (12 pages) |
| Phase two scheme development report - Appendix Q - Blackfriars Bridge Foreshore | This report sets out the work we have undertaken since phase one consultation. It describes how the scheme has evolved in the intervening period and how we have used the responses we received from the phase one consultation, alongside ongoing engineering scheme design work and information on changes in circumstances, to update the proposals that we are publicising during our phase two consultation period. | PDF (10 pages) |
| Phase two scheme development report - Appendix R - Chambers Wharf | This report sets out the work we have undertaken since phase one consultation. It describes how the scheme has evolved in the intervening period and how we have used the responses we received from the phase one consultation, alongside ongoing engineering scheme design work and information on changes in circumstances, to update the proposals that we are publicising during our phase two consultation period. | PDF (28 pages) |
| Phase two scheme development report - Appendix S - King Edward Memorial Park Foreshore | This report sets out the work we have undertaken since phase one consultation. It describes how the scheme has evolved in the intervening period and how we have used the responses we received from the phase one consultation, alongside ongoing engineering scheme design work and information on changes in circumstances, to update the proposals that we are publicising during our phase two consultation period. | PDF (28 pages) |
| Phase two scheme development report - Appendix T - Earl Pumping Station | This report sets out the work we have undertaken since phase one consultation. It describes how the scheme has evolved in the intervening period and how we have used the responses we received from the phase one consultation, alongside ongoing engineering scheme design work and information on changes in circumstances, to update the proposals that we are publicising during our phase two consultation period. | PDF (18 pages) |
| Phase two scheme development report - Appendix U - Deptford Church Street | This report sets out the work we have undertaken since phase one consultation. It describes how the scheme has evolved in the intervening period and how we have used the responses we received from the phase one consultation, alongside ongoing engineering scheme design work and information on changes in circumstances, to update the proposals that we are publicising during our phase two consultation period. | PDF (26 pages) |
| Phase two scheme development report - Appendix V - Greenwich Pumping Station | This report sets out the work we have undertaken since phase one consultation. It describes how the scheme has evolved in the intervening period and how we have used the responses we received from the phase one consultation, alongside ongoing engineering scheme design work and information on changes in circumstances, to update the proposals that we are publicising during our phase two consultation period. | PDF (26 pages) |
| Phase two scheme development report - Appendix W - Abbey Mills Pumping Station | This report sets out the work we have undertaken since phase one consultation. It describes how the scheme has evolved in the intervening period and how we have used the responses we received from the phase one consultation, alongside ongoing engineering scheme design work and information on changes in circumstances, to update the proposals that we are publicising during our phase two consultation period. | PDF (13 pages) |
| Putney Bridge Foreshore - phase two site information paper | Site information paper explaining our phase two consultation proposals for the site. The paper includes information on how the site was chosen, our potential use of the site, the proposed future use of the site and operational issues. | PDF (32 pages) |
| Regulatory framework | Project information paper explaining the regulatory framework surrounding the Thames Tunnel project. | PDF (2 pages) |
| Route and tunnel alignment | Project information paper explaining the route the tunnel will follow and its alignment. | PDF (4 pages) |
| Route to consent - How we will get permission to build the project | Project information paper explaining how we will get permission to construct and operate the Thames Tunnel. | PDF (4 pages) |
| Route to consent display board | A display board outlining the process we are following to seek permission to build the tunnel. | PDF (1 pages) |
| Settlement - Limiting ground movement | Project information paper explaining the potential effects of tunnel construction on the ground above. | PDF (2 pages) |
| Shad Thames Pumping Station - phase two site information paper | Site information paper explaining our phase two consultation proposals for the site. The paper includes information on how the site was chosen, our potential use of the site, the proposed future use of the site and operational issues. | PDF (16 pages) |
| Shad Thames Pumping Station display board | A visual board showing location plans, construction layouts, and post-construction visuals of the proposed site at Shad Thames Pumping Station. | PDF (1 pages) |
| Site selection - How we chose our sites | Project information paper explaining the process of selecting potential sites for the construction and operation of the Thames Tunnel. | PDF (4 pages) |
| Site selection background technical paper | An update to the Spring 2010 issue that was part of phase one consultation, this Site selection background technical paper provides information for the site selection team about the background and the engineering requirements of the Thames Tunnel project. | PDF (50 pages) |
| Site selection methodology paper | An update to the Spring 2010 issue that was part of phase one consultation, this paper summarises the background to the project and details the methodology used to select construction sites along the route of the Thames Tunnel. | PDF (43 pages) |
| Southwark Tunnel News, January 2012 | The first issue of Tunnel News - a regular update about events, meetings and news for sites in the Southwark area. | PDF (2 pages) |
| Statement of community consultation | Our statement on who we will consult, how we will consult and what we will consult stakeholders on regarding the Thames Tunnel, revised for phase two consultation | PDF (1 pages) |
| Thames Water's initial response to the Selborne Report | Thames Water's initial response to the Selborne Report. | PDF (5 pages) |
| Timing - Proposed timescales for the project | Project information paper explaining the proposed timescales for the construction of the Thames Tunnel. | PDF (2 pages) |
| Timing display board | A display board outlining when we expect to reach project milestones. | PDF (1 pages) |
| Tower Hamlets Tunnel News, January 2012 | The first issue of Tunnel News - a regular update about events, meetings and news for sites in the Tower Hamlets area. | PDF (2 pages) |
| Transport - How we will transport construction materials | Project information paper explaining how we will transport construction materials to and from our sites. | PDF (6 pages) |
| Transport display board | A display board outlining our proposed transport strategy. | PDF (1 pages) |
| Tunnelling under London display board | A display board outlining how we have choosen our preferred route. | PDF (1 pages) |
| Victoria Embankment Foreshore - phase two site information paper | Site information paper explaining our phase two consultation proposals for the site. The paper includes information on how the site was chosen, our potential use of the site, the proposed future use of the site and operational issues. | PDF (28 pages) |
| Victoria Embankment Foreshore display board | A visual board showing location plans, construction layouts, and post-construction visuals of the proposed site at Victoria Embankment Foreshore. | PDF (1 pages) |
| Written Ministerial Statement | Ministerial Statement from Parliamentary Under-Secretary for Natural Environment and Fisheries (Richard Benyon) reaffirming the Government’s support for Thames Tunnel and the progress made since the last announcement on 7 September 2010. | PDF (3 pages) |